Inventory Control - Project Template - Planning View
Download and customize a free Inventory Control Project Template Planning View Excel template. Perfect for business, legal, and personal use. Editable and ready to boost your productivity.
| Project ID | Item Name | Description | Category | Quantity On Hand | Reorder Point | Safety Stock Planned Order Quantity |
|---|---|---|---|---|---|---|
|
TOTALS
700
120
|
||||||
Inventory Control Project Template - Planning View
Template Purpose: This Excel template is specifically designed for effective Inventory Control within a project management context. As a comprehensive Project Template, it enables teams to plan, track, and optimize inventory levels throughout the lifecycle of any project—from initial procurement to final delivery. The Planning View ensures forward-looking visibility into material needs, helping prevent stockouts or overstocking.
Sheet Names and Structure
- Main Inventory Planning Sheet: Central hub for all inventory-related data including item details, planned vs actual usage, reorder points, and supplier information.
- Procurement Schedule: Tracks purchase order timelines, lead times, delivery dates, and status of procurement activities.
- Stock Movement Log: A historical record of all inventory inflows (receipts) and outflows (usage/production).
- Dashboard & KPI Summary: Visual representation of key metrics such as inventory turnover, stockout rate, carrying cost, and project status.
- Supplier Performance Tracker: Monitors delivery reliability, quality issues, and on-time delivery percentages by supplier.
Table Structures and Columns
Main Inventory Planning Sheet
| Column Name | Data Type / Description | Example Data |
|---|---|---|
| Item ID (Unique) | Text (Auto-generated code) | PJ-INV-00123 |
| Item Name | Text (Descriptive name) | Metal Fasteners, 6mm x 50mm |
| Category / Type | List (Dropdown: Raw Material, Component, Tooling, Consumable) | Raw Material |
| Unit of Measure (UoM) | List (Dropdown: Each, kg, meter, liter) | Each |
| Planned Quantity (Project) | Numeric (Input required) | 250 |
| Budgeted Cost per Unit | Currency (Format: $0.00) | $1.45 |
| Total Project Budget (PLANNED) | Currency (Formula: Planned Qty × Cost per Unit) | $362.50 |
| Current Stock Level | Numeric (Manual or auto-updated from other sheets) | 180 |
| Reorder Point (ROP) | Numeric (Recommended threshold to trigger purchase) | 50 |
| Lead Time (Days) | Numeric (Supplier delivery time) | (Example: 7 for standard, 14 for expedited)|
| Next Order Date | Date (Auto-calculated from current date + lead time) | 2025-04-15 |
| Status (Planning) | List (Dropdown: On Track, Low Stock, Overstocked, Delayed) | On Track |
Procurement Schedule Sheet
| Column Name | Data Type / Description |
|---|---|
| Purchase Order Number (PO#) | Text (Unique identifier) |
| Item ID/Name | Text or Lookup from Main Sheet |
| Supplier Name | Text (Linked to Supplier Tracker) |
| Order Date | Date (When PO issued) |
| Expected Delivery Date | Date (Calculated: Order date + Lead time) |
| Actual Delivery Date | Date (To be filled after delivery) |
| Status (PO) | List: Ordered, Shipped, Delivered, Cancelled |
Stock Movement Log
| Column Name | Data Type / Description |
|---|---|
| Date of Transaction | Date (Timestamp) |
| Item ID/Name | Text or Lookup from Main Sheet |
| Type (In/Out) | List: Receipt, Issue, Transfer, Adjustment |
| Quantity | Numeric (Positive for Inflow, Negative for Outflow) |
| Source / Destination | (e.g., Supplier Name or Workstation)Text |
| Reference # (PO/Work Order) | Text (Link to original document) |
Dashboards & KPIs Sheet
- Total Project Inventory Value: SUM of (Planned Quantity × Budgeted Cost per Unit) across all items.
- Inventory Turnover Ratio: Total Units Used / Average Inventory Level (calculated from movement log).
- Stockout Rate: Count of days where stock level fell below ROP, divided by total project days.
- Cycle Time Variance: Actual vs. Expected Delivery Days for POs.
Formulas Required
=IF(Current_Stock < Reorder_Point, "Low Stock", IF(Current_Stock > (Planned_Qty * 1.3), "Overstocked", "On Track"))– Status auto-update.=TODAY() + Lead_Time_Days– Auto-calculate Next Order Date.=SUMIFS(Stock_Movement_Log[Quantity], Stock_Movement_Log[Item_ID], Main_Sheet[@Item_ID], Stock_Movement_Log[Type], "Issue")– Total issued quantity per item.=IFERROR(VLOOKUP(Item_ID, Supplier_Tracker, 3, FALSE), "Not Assigned")– Pull supplier name from lookup table.=COUNTIFS(Procurement_Schedule[Status], "Delivered", Procurement_Schedule[Expected_Delivery_Date], ">="&TODAY(), Procurement_Schedule[Actual_Delivery_Date], ">"&Expected_Delivery_Date)– Count late deliveries.
Conditional Formatting
- Status Column: Red for "Low Stock", Yellow for "Overstocked", Green for "On Track".
- Next Order Date: Orange highlight if within 3 days; red if past due.
- Current Stock Level: Red font when below Reorder Point.
- Dashboards: Color scales for KPIs (green to red) based on performance thresholds.
User Instructions
- Open the template and save as a new file with your project name (e.g., "Project_Titan_InventoryPlan.xlsx").
- Enter all required items in the Main Inventory Planning Sheet.
- Update quantities and cost per unit as procurement budgets evolve.
- Use the Procurement Schedule to record PO issuance dates and expected delivery timelines.
- Add daily entries to the Stock Movement Log upon receipt or usage of materials.
- Review Dashboard weekly for alerts on stockouts, delays, or overspending.
- Update Supplier Performance Tracker after each delivery (on-time rate).
Note: The template is dynamic. Changes in one sheet (e.g., a new receipt) automatically update totals and KPIs on the Dashboard.
Example Rows
| Item ID | Item Name | Planned Qty | Current Stock | Status (Planning) |
|---|---|---|---|---|
| PJ-INV-00123 | Metal Fasteners, 6mm x 50mm | 250 | 180 | Low Stock |
| PJ-INV-01742 | Polymer Resin, 5L Drum | 100 | 95 | On Track |
Note: "Low Stock" is highlighted due to current stock (180) being below reorder point (200).
Recommended Charts & Dashboards
- Inventory Level Trend Line Chart: Plots current stock levels over time (from Stock Movement Log) with threshold lines at ROP.
- Pie Chart: Inventory Value by Category: Shows cost distribution across Raw Materials, Components, and Consumables.
- Gantt-style Procurement Timeline: Visual timeline of PO issuance vs. expected delivery dates (using conditional formatting or stacked bars).
- KPI Gauge Charts: For Inventory Turnover Ratio and Stockout Rate with performance thresholds.
This Project Template, built specifically for Inventory Control, provides a structured, scalable, and forward-thinking approach to managing material resources—ensuring project continuity through intelligent planning in the Planning View.