Logistics Planning - Gantt Chart - Report Version

Download and customize a free Logistics Planning Gantt Chart Report Version Excel template. Perfect for business, legal, and personal use. Editable and ready to boost your productivity.

Task Start Date End Date Duration (Days) Responsible Team Status
Procurement of Materials 2023-10-01 2023-10-15 15 Supply Chain In Progress
Transportation Planning 2023-10-16 2023-10-25 10 Logistics Team In Progress
Warehouse Preparation 2023-10-18 2023-10-30 13 Operations Completed
Delivery Scheduling 2023-10-26 2023-11-05 10 Logistics Team In Progress
Final Inspection & Documentation 2023-11-06 2023-11-10 5 Quality Assurance Pending
Project Closure & Review 2023-11-11 2023-11-15 5 Project Manager Pending

Excel Template for Logistics Planning - Gantt Chart (Report Version)

This comprehensive Logistics Planning Excel template is designed specifically as a Gantt Chart (Report Version), offering logistics managers, supply chain coordinators, and project leaders a powerful tool to visualize, plan, and report on complex transportation schedules, warehouse operations, inventory movements, and delivery timelines across multiple routes or regions. The template integrates detailed task tracking with advanced reporting capabilities while maintaining the visual clarity of a Gantt chart.

Sheet Names

The workbook includes three dedicated sheets to support full logistics planning and reporting functionality:

  • 1. Logistics Tasks & Timeline (Gantt View): The primary interface for creating, editing, and visually tracking logistics activities using a Gantt-style timeline.
  • 2. Task Details & Metadata: A structured table with comprehensive data on each logistics task including responsible parties, equipment needs, routing details.
  • 3. Dashboard & KPIs (Report Version): A summary dashboard that aggregates key performance indicators (KPIs), timeline status reports, and visual charts for executive review and reporting.

Table Structures and Columns

Sheet 1: Logistics Tasks & Timeline (Gantt View)

This sheet contains the main Gantt chart visualization built using a combination of bar charts, date-based conditional formatting, and structured data tables.

Column Data Type Description
Task ID Text (e.g., L-001, L-002) Unique identifier for each logistics task.
Task Name Text Description of the logistics activity (e.g., "Ship Container from Port A to Warehouse B").
Start Date Date (YYYY-MM-DD) Planned start date of the task.
End Date Date (YYYY-MM-DD) Planned end date of the task.
Duration (Days) Numeric (Calculated) Auto-calculated as End Date – Start Date + 1.
Progress (%) Numeric (0–100) Current completion percentage of the task.
Status Text (Dropdown: Not Started, In Progress, Delayed, Completed) Visual status indicator for reporting purposes.
Responsible Team Text (e.g., "Transportation," "Warehouse Ops") Name of the team or individual accountable.
Route / Destination Text Specific route (e.g., "Chicago to Miami via I-75") or destination location.

Sheet 2: Task Details & Metadata

This sheet provides in-depth operational data for auditing, compliance, and planning refinement.

Pickup Date & Time (Estimated)

Expected delivery timestamp based on transit duration.

Carrier-provided tracking reference for real-time monitoring.

Volume of goods being transported.

Column Data Type Description
Task ID Text (Linked to Sheet 1) Must match the Task ID in the main Gantt sheet.
Vehicle Type Text (e.g., "Refrigerated Truck," "Flatbed Trailer") Type of transport used for this task.
Pickup Location Text / Address Origin warehouse or supplier site.
Delivery Location Text / Address Date and time with time format.
Delivery Date & Time (Estimated) Date and time with time format.
Tracking Number Text (Optional)
Bulk Volume (m³) Numeric

Sheet 3: Dashboard & KPIs (Report Version)

This report-centric sheet provides summary visuals and data for stakeholders. Designed for print, presentation, or shared reports.

Formulas Required

  • Duration (Days): =IF(AND([@Start Date], [@End Date]), [@End Date] - [@Start Date] + 1, 0)
  • Status Indicator: Uses a nested IF or SWITCH formula to return status labels based on Progress (%) and date comparisons.
  • Gantt Bar Positioning: Calculated using date differences relative to the project’s start date. For example: =DATEDIF([@Start Date], $A$2, "d") (where A2 is a reference start date).
  • KPIs on Dashboard:
    • Tasks Completed: =COUNTIF(Sheet1!$F:$F, "Completed")
    • Average Progress: =AVERAGE(Sheet1!E:E)
    • Delayed Tasks: =COUNTIFS(Sheet1!$F:$F, "Delayed", Sheet1!$B:$B, "<="&TODAY())

Conditional Formatting

  • Task Status: Color-coded cells (Red for Delayed, Yellow for In Progress, Green for Completed).
  • Gantt Bars: Conditional formatting based on current date to show which tasks are active.
  • Dates: Highlight overdue tasks in red if End Date is before today.
  • Progress %: Use a data bar or color scale to visually indicate completion levels (e.g., green gradient from 0% to 100%).

User Instructions

To use this Logistics Planning Gantt Chart (Report Version):

  1. Set the Project Start Date: Enter the project’s first day in cell A1 of Sheet 1 to anchor all date calculations.
  2. Add Tasks: Populate Task ID, Name, Start/End Dates, and responsible team on Sheet 1. Use dropdowns for Status and Team.
  3. Populate Details: Fill in full metadata in Sheet 2 using matching Task IDs.
  4. Update Progress: Modify the Progress (%) field as tasks advance.
  5. Review Dashboard: The Report Version dashboard automatically updates with KPIs and visualizations.
  6. Export for Reporting: Use Print Preview or Export to PDF from the Dashboard sheet to generate professional reports.

Example Rows

Task ID Task Name Start Date End Date Progress (%) Status
L-001 Receive Raw Materials at Plant X 2024-07-15 2024-07-18 95% Completed
L-003 Transport 15 Crates to Distribution Hub Y via Truck A 2024-07-19 2024-07-21 65% In Progress
L-012 Air Freight: Deliver Critical Spare Parts to Regional Depot Z 2024-07-25 2024-07-30 15% Not Started

Recommended Charts & Dashboards (Report Version)

  • Gantt Chart: Visual timeline showing task bars across dates, with color-coded progress and overlapping tasks.
  • Pie Chart: Percentage of tasks by Status (Completed, In Progress, Delayed).
  • Bar Chart: Number of tasks per team or destination region.
  • KPI Gauges: Visual indicators for average progress, on-time delivery rate, and delayed task count.

This Excel template is designed to support both operational planning and high-level reporting—perfect for logistics teams needing a clear, professional Logistics Planning Gantt Chart (Report Version) that combines data rigor with visual clarity.

⬇️ Download as Excel✏️ Edit online as Excel