Project Management - Stock Control - Dashboard View
Download and customize a free Project Management Stock Control Dashboard View Excel template. Perfect for business, legal, and personal use. Editable and ready to boost your productivity.
| Stock Item | Current Stock | Reorder Level | Last Restocked Date | Supplier | Next Review Date | Status |
|---|---|---|---|---|---|---|
| Laptop Charger | 45 | 20 | 2024-03-15 | TechPro Supply | 2024-06-15 | In Stock |
| Mouse Pad | 12 | 50 | 2024-01-20 | OfficeMart Inc. | 2024-05-30 | Low Stock |
| Monitor Stand | 8 | 15 | 2024-02-10 | DeskEdge Co. | 2024-07-10 | Critical Low |
| External Hard Drive | 60 | 30 | 2024-04-05 | DataPlus Ltd. | 2024-08-15 | In Stock |
| Keyboard | 23 | 40 | 2024-03-30 | KeyWorld Inc. | 2024-06-30 | Low Stock |
Project Management Stock Control Dashboard Excel Template – Comprehensive Guide
This Excel template is specifically designed to integrate Project Management, Stock Control, and a dynamic Dashboad View. It serves as an intelligent, real-time management tool for organizations that oversee multiple projects while maintaining strict control over inventory levels. By combining project timelines with stock monitoring, this template enables decision-makers to identify supply chain bottlenecks, predict material needs based on project schedules, and ensure timely restocking—minimizing delays and reducing waste.
The template is built using a modular structure that ensures scalability across different industries such as construction, manufacturing, IT development, or logistics. Every element—from sheet organization to conditional formatting—is engineered for clarity and actionable insights. It supports both manual data entry and integration with project management tools (e.g., Asana or Jira) via linked cells or external data sources.
Sheet Names
The template consists of the following core sheets:
- Project Overview: Lists all active projects with key details like project name, start/end dates, responsible team, budget, and status.
- Stock Items: Central table for all stock products with attributes such as SKU, description, category, reorder level, current stock quantity.
- Project-Stock Link: Maps each project to the materials it requires and tracks consumption forecasts based on project milestones.
- Stock Movement Log: Records all stock transactions (receiving, issuing, returns) with timestamps and user IDs.
- Dashboad View: A consolidated summary view showing KPIs, visual indicators of stock levels relative to project timelines, and alerts.
- Formulas & Validation: Contains all formulas, data validation rules, and error-handling logic.
Table Structures & Column Definitions
The core tables are structured as follows:
1. Stock Items Table (Sheet: Stock Items)
- SKU: Text (Primary Key)
- Description: Text (Max 100 characters)
- Category: Dropdown list: e.g., Electronics, Tools, Packaging
- Unit of Measure: Dropdown: e.g., pcs, kg, m, liters
- Reorder Level (Min Stock): Integer (e.g., 10)
- Current Stock Quantity: Integer (Automatically updated from movement log)
- Reorder Flag: Boolean (calculated via formula)
- Last Updated: Date/Time (Auto-populated on edit)
- Status: Text: "In Stock", "Low", "Out of Stock"
2. Project-Stock Link Table (Sheet: Project-Stock Link)
- Project ID: Text (Linked to Project Overview)
- Item SKU: Text (Links to Stock Items table via VLOOKUP)
- Estimated Quantity Required: Decimal (e.g., 50 units)
- Forecasted Demand Date: Date (Based on project milestones)
- Actual Usage (Monthly): Decimal (Auto-tracked from Stock Movement Log)
- Status: Text: "On Track", "At Risk", "Overrun"
Formulas Required
The template relies on several key formulas:
=IF(C2<=B2, "Low", IF(C2<0, "Out of Stock", "In Stock"))– Determines stock status dynamically.=VLOOKUP(A3, Stock_Items!$A:$D, 4, FALSE)– Pulls item description when project references SKU.=SUMIFS(Stock_Movement!$E:$E, Stock_Movement!$B:$B, A2)– Calculates total issued stock per item.=TODAY()-Project_Start_Date– Tracks progress toward project milestones.=IF(AND($C3<=$D3, $C3>0), "Reorder Needed", "")– Triggers reorder flag when stock drops below min level.=SUMPRODUCT((Project_Stock_Link!$E:$E > 0) * (Project_Stock_Link!$F:$F = TODAY()))– Counts upcoming demand.
Conditional Formatting Rules
The template uses conditional formatting to provide visual alerts:
- Green background when stock level is above reorder point (e.g., 50+ units).
- Yellow highlight when stock is between 10–49 units.
- Red background for "Out of Stock" or negative quantity entries.
- Dashboad alerts: Red borders when any project has material shortages in the next 2 weeks.
- Project timeline color coding: Green = On schedule, Orange = Delayed, Red = Overrun.
User Instructions
How to Use:
- Enter project details in the "Project Overview" sheet. Ensure each project has a unique ID and clear start/end dates.
- Add stock items with accurate SKUs, descriptions, and reorder levels in the "Stock Items" sheet.
- Link projects to required materials by entering SKU and quantity estimates in the "Project-Stock Link" sheet.
- Log every stock movement (receiving, issue) in the "Stock Movement Log". This updates current stock automatically via formulas.
- Each time data is updated, go to the "Dashboard View" to instantly see key indicators such as low-stock warnings, project delays due to material shortages, and total projected demand.
- Set up automatic email alerts (via Excel Power Query or external tools) when reorder flags trigger.
Example Rows
Stock Items Table:
| SKU | Description | Category | Unit of Measure | Reorder Level | Current Stock |
|---|---|---|---|---|---|
| P1001 | Battery Pack (5Ah) | Electronics | pcs | 20 | 18 |
| P3089 | Steel Cable, 5m | Mechanical Parts | meters | 25 | 30 |
| 50 | 55 |
Project-Stock Link Example:
| Project ID | Item SKU | Estimated Qty Required | Demand Date |
|---|---|---|---|
| PJ2023-01 | P1001 | 75 | 2024-05-15 |
| PJ2023-01 | P4112 | 30 | 2024-06-10 |
| PJ2023-05 | P3089 | 50 | 2024-07-18 |
Recommended Charts & Dashboards (in Dashboard View Sheet)
The "Dashboard View" includes:
- Stock Level Heat Map: Shows stock levels across categories with color intensity.
- Project Timeline Gantt Chart: Visualizes project durations and overlaps, with material delivery windows marked.
- Low Stock Warning Bar Chart: Displays items below reorder level by category.
- Forecasted Demand vs. Actual Usage Line Graph: Compares projected needs to real consumption trends.
- KPI Summary Table: Tracks key metrics such as "Avg. Stock Days", "Stock Turnover Rate", and "% of Projects At Risk".
- Dynamic Alerts Panel: Displays pop-up warnings when stock is low or a project is delayed due to material unavailability.
In conclusion, this Project Management Stock Control Dashboard Excel Template bridges the gap between operational logistics and strategic planning. By fusing Stock Control with the lifecycle of ongoing Projects, it provides real-time visibility into inventory health and project execution risks—all presented in a clear, user-friendly Dashboad View. It is an essential asset for any organization aiming to enhance efficiency, reduce costs, and maintain operational continuity.
⬇️ Download as Excel✏️ Edit online as ExcelCreate your own Excel template with our GoGPT AI prompt:
GoGPT