GoGPT GoSearch New DOC New XLS New PPT

OffiDocs favicon

Project Management - Stock Control - Office Use

Download and customize a free Project Management Stock Control Office Use Excel template. Perfect for business, legal, and personal use. Editable and ready to boost your productivity.

Item Code Item Name Category Unit of Measure Current Stock Level Reorder Level Safety Stock Supplier Name Last Restock Date Next Review Date Status
P001 Project Management Software Software License 50 10 20 TechFlow Inc. 2024-03-15 2024-09-15 In Stock
P002 Time Tracking Tool Software User 35 5 10 TimeLog Solutions 2024-04-01 2024-10-01 In Stock
P003 Project Risk Assessment Kit Templates & Tools Set 25 10 15 RiskPro Ltd. 2024-03-20 2024-09-20 In Stock
P004 Team Collaboration Board Hardware Unit 12 3 5 OfficeHub Inc. 2024-05-10 2024-11-10 Low Stock Alert
Total Items in Stock 122 Average Reorder Level 8.0

Office Use Project Management Stock Control Excel Template

This comprehensive Excel template is specifically designed for Project Management teams within office environments that require precise Stock Control. Tailored for everyday use in corporate, administrative, or operational settings—this is a fully functional and scalable Office Use solution that integrates project timelines with inventory tracking. The template combines best practices in project scheduling with real-time stock monitoring to ensure that resources are neither over-allocated nor under-supplied during active projects.

Sheet Names and Structure

The template is structured across five core worksheets, each serving a distinct function:

  1. Project Overview: Contains high-level project details such as name, start/end dates, responsible teams, budget allocation, and status.
  2. Stock Inventory: Central repository for all stock items with their current levels, suppliers, reorder points, and lead times.
  3. Project-Stock Linkage: A dynamic connection between active projects and required materials or supplies—enables project managers to track material needs per project phase.
  4. Reorder Alerts: Automatically flags items approaching or below minimum stock thresholds, providing proactive notifications for purchasing departments.
  5. Dashboard Summary: A visual overview of key metrics including total stock value, critical shortages, upcoming project milestones, and material utilization rates.

Table Structures and Data Types

Each sheet follows a standardized structure to ensure consistency across teams and departments.

1. Project Overview Sheet

  • Project ID: Text, unique identifier (e.g., PRJ-2024-01)
  • Project Name: Text, descriptive title (e.g., "Office Equipment Upgrade")
  • Start Date: Date type, formatted as DD/MM/YYYY
  • End Date: Date type, formatted as DD/MM/YYYY
  • Status: Text (e.g., "Planned", "Active", "On Hold", "Completed")
  • Project Manager: Text, name of responsible individual or team
  • <93>Initial Budget (USD): Currency type, auto-formatted as $100.00
  • Current Budget Usage (%): Percentage, calculated dynamically using formulas
  • Priority Level: Text (e.g., "High", "Medium", "Low")

2. Stock Inventory Sheet

  • Item Code: Text, unique alphanumeric ID (e.g., STK-105)
  • Description: Text, full item name (e.g., "Wireless Mouse")
  • Category: Text (e.g., "Office Supplies", "IT Equipment")
  • Current Stock Level: Integer, quantity in stock (e.g., 45)
  • Reorder Point: Integer, minimum level before purchase is triggered (e.g., 10)
  • Maximum Stock Level: Integer, upper limit to prevent overstocking (e.g., 100)
  • Unit Cost (USD): Currency type
  • Supplier Name: Text, name of current supplier
  • Lead Time (Days): Integer, days until delivery after order placement
  • Last Restocked Date: Date type, last date when stock was updated or received
  • Status: Text (e.g., "In Stock", "Low", "Out of Stock")

3. Project-Stock Linkage Sheet

  • Project ID: Text (linked to Project Overview)
  • Item Code: Text (linked to Stock Inventory)
  • Quantity Required: Integer, amount needed per project phase
  • Phase Name: Text (e.g., "Design", "Procurement", "Implementation")
  • Planned Delivery Date: Date type, when the stock is expected to be delivered to the project site
  • Status (Matched/Needed): Text (auto-updated based on availability)

4. Reorder Alerts Sheet

  • Item Code: Text, filtered from Stock Inventory
  • Stock Level: Integer (auto-pulled from Stock Inventory)
  • Status: Text ("Below Reorder Point", "Normal", "Out of Stock")
  • Next Action Due Date: Date calculated based on lead time and reorder point logic
  • Priority (High/Medium/Low): Auto-generated based on stock level and usage demand

5. Dashboard Summary Sheet

  • KPIs Overview Table: Aggregated data with dynamic calculations showing total inventory value, number of active projects, average lead time, and % of items below reorder point.
  • Stock Health Score: A color-coded score from 0 to 100 based on stock levels and project alignment.
  • Top 5 Items by Demand: Ranked by total quantity required across all projects.

Formulas Required

The template uses a combination of built-in Excel functions to maintain accuracy and real-time updates:

  • =IF(C2<B2, "Low", IF(C2=0, "Out of Stock", "Normal")) – Determines stock status based on reorder point.
  • =NOW() – For last restocked date updates and alert timing.
  • =IFERROR(VLOOKUP(A2,'Stock Inventory'!$A:$Z, 10, FALSE), "N/A") – Pulls supplier details dynamically.
  • =SUMIFS('Project-Stock Linkage'!C:C, 'Project-Stock Linkage'!A:A, A2) – Total quantity required for a project.
  • =DATEDIF(E2, TODAY(), "d") – Calculates days since planned delivery date.
  • =SUMPRODUCT((D:D<E:E)*(D:D>F:F)) – Counts items below reorder point with overstocking risks.
  • =IF(G2>0, G2/($H2+$I2), 0) – Calculates utilization rate per item.
  • Dynamic pivot tables: Used in Dashboard Summary to summarize project and stock data by category.

Conditional Formatting

To improve visibility and decision-making, the template includes conditional formatting rules:

  • Stock Levels Below Reorder Point: Cells in "Current Stock Level" column are highlighted red when below reorder point.
  • Critical Low Alerts: Items with zero stock are shown in bold red with a warning icon.
  • Out of Stock Status: Entire rows turn light yellow and center-aligned for quick identification.
  • Due Dates in the Future: Reorder alerts show a gradient from green to red as due date approaches.
  • Budget Overrun Flags: In Project Overview, any project exceeding 90% of budget is highlighted in orange.

User Instructions

For Office Use:

  • Open the template using Microsoft Excel 2016 or later (compatible with Office 365).
  • Enter project details in the "Project Overview" sheet.
  • Add new stock items or update existing ones in the "Stock Inventory" sheet.
  • Link projects to required supplies via the "Project-Stock Linkage" sheet to track resource needs.
  • Review daily or weekly in the "Reorder Alerts" sheet for urgent purchasing decisions.
  • Use the Dashboard Summary for executive-level reporting and management reviews.
  • Ensure all dates, quantities, and currency fields are updated regularly to maintain accuracy.

Example Rows

Stock Inventory Example:

Pencil Set (12 pcs)
Item CodeDescriptionCategoryCurrent Stock LevelReorder PointStatus
STK-105Coffee Maker (Black)IT Equipment35Low
STK-201Office Supplies6820In Stock
STK-303Laptop Stand (Ergonomic)IT Equipment05Out of Stock

Dashboards Example Summary:

  • Total Inventory Value: $14,250.00
  • Critical Shortages: 3 items (8%)
  • Active Projects: 12
  • Average Lead Time: 14 days
  • Stock Health Score: 78/100 (Good)

Recommended Charts or Dashboards

The template supports the following visualizations:

  • Bar Chart: Shows stock levels per category to identify overstock or understock trends.
  • Pie Chart: Displays budget allocation by project in "Project Overview" for financial transparency.
  • Line Chart: Tracks stock level changes over time to detect consumption patterns.
  • Heat Map: In the dashboard, shows items with high demand vs. low availability using color gradients.
  • Gantt Chart (via Power Query): Links project timelines with material delivery dates for better planning.

This Project Management and Stock Control Excel template is engineered for efficient, real-time office operations. It ensures that both project execution and inventory management remain aligned, reducing delays and waste while improving accountability across departments.

⬇️ Download as Excel✏️ Edit online as Excel

Create your own Excel template with our GoGPT AI prompt:

GoGPT
×
Advertisement
❤️Shop, book, or buy here — no cost, helps keep services free.