Purchase Order Civil Engineer in Nepal Kathmandu –Free Word Template Download with AI
Date of Issue: 15 June 2025
Valid Until: 15 July 2025
PURCHASER (Buyer)
Company: Himalayan Infrastructure Development Pvt. Ltd.
Address: Boudha Marg, Kathmandu 44600, Nepal
VAT Registration No.: 800123456789
Contact Person: Mr. Rajesh Koirala, Project Director
Phone: +977-1-4412345
Email: [email protected]
SUPPLIER (Seller / Service Provider)
Company: Kathmandu Civil Engineering Consultants LLP
Address: New Baneshwor, Kathmandu 44700, Nepal
VAT Registration No.: 800987654321
Contact Person: Engr. Sunita Sharma, Lead Civil Engineer
Phone: +977-1-5567890
Email: [email protected]
All amounts stated in this Purchase Order are in Nepalese Rupees (NPR) unless otherwise specified. This Purchase Order is governed by the laws of the Federal Democratic Republic of Nepal and applicable regulations of the Department of Industry, Kathmandu.
ITEMS AND SERVICES ORDERED| S.No. | Description of Civil Engineer Services / Items | Quantity | Unit | Unit Price (NPR) | Total Amount (NPR) |
|---|---|---|---|---|---|
| 1 | Structural Design & Analysis of a 12-storey residential building in Kathmandu Valley, including seismic load calculations compliant with Nepal National Code of Seismic Design (NBC 2015) | 1 | Project | 4,500,000.00 | 4,500,000.00 |
| 2 | Geotechnical Investigation & Soil Testing for the construction site located in Lalitpur District, Kathmandu Metropolitan Area, including borehole drilling (minimum 6 boreholes at 30m depth) | 6 | Boreholes | 185,000.00 | 1,110,000.00 |
| 3 | Architectural & Structural Drawing Preparation (Working Drawings, Detail Drawings, and BOQ) for the Civil Engineer project scope | 1 | Set | 2,200,000.00 | 2,200,000.00 |
| 4 | On-site Supervision & Quality Assurance by a licensed Civil Engineer for a period of 18 months during construction phase in Kathmandu | 18 | Months | 350,000.00 | 6,300,000.00 |
| 5 | Environmental Impact Assessment (EIA) Report preparation and submission to the Department of Environment, Kathmandu, Nepal | 1 | Report | 850,000.00 | 850,000.00 |
| 6 | Procurement of Structural Steel (IS 2062 Grade) and Reinforcement Steel (Fe-500D) as per Civil Engineer specifications for the project | 1 | Lot | 12,400,000.00 | 12,400,000.00 |
| 7 | Concrete Mix Design & Testing (C-30 and C-40 grades) at an accredited laboratory in Kathmandu, Nepal | 24 | Tests | 12,500.00 | 300,000.00 |
| 8 | Project Management & Coordination Services by the Lead Civil Engineer team for the entire project duration | 1 | Project | 1,500,000.00 | 1,500,000.00 |
| SUBTOTAL | 29,160,000.00 | ||||
| VAT @ 13% (Nepal Standard Rate) | 3,790,800.00 | ||||
| GRAND TOTAL (NPR) | 32,950,800.00 | ||||
- Scope of Work: The Civil Engineer and the team at Kathmandu Civil Engineering Consultants LLP shall perform all structural, geotechnical, and construction supervision services as described in this Purchase Order. All work shall comply with the Nepal National Code (NBC), the Building Code of Nepal, and regulations issued by the Department of Urban Development and Building Construction (DUDBC), Kathmandu.
- Delivery / Completion Timeline: The Civil Engineer shall submit all design documents and drawings within 90 calendar days from the date of this Purchase Order. On-site supervision shall commence within 15 days of the purchaser's written notice and shall continue for the full 18-month construction period in Kathmandu.
- Payment Terms: Payment shall be made in the following installments: 30% advance payment upon signing of this Purchase Order; 40% upon submission and approval of all design documents; 20% upon completion of 50% of on-site supervision; and 10% upon final project handover and submission of the as-built drawings. All payments shall be made via bank transfer to the supplier's account in Nepal.
- Quality Standards: All materials procured under this Purchase Order, including structural steel, reinforcement, and concrete, shall meet the specifications set by the Civil Engineer and shall comply with the standards of the Nepal Standards and Specification Development Institute (NSSDI). Any non-conforming material shall be rejected at the supplier's cost.
- Warranty & Liability: The Civil Engineer warrants that all design calculations, structural analyses, and engineering recommendations shall be free from defects for a period of five (5) years from the date of project completion. The supplier shall bear full liability for any structural failure attributable to design errors during this warranty period.
- Intellectual Property: All drawings, reports, calculations, and documents produced under this Purchase Order shall become the exclusive property of the purchaser upon full payment. The Civil Engineer shall not reuse or disclose project-specific data without written consent.
- Dispute Resolution: Any dispute arising from this Purchase Order shall first be resolved through amicable negotiation. If unresolved within 30 days, the matter shall be referred to arbitration under the Arbitration Act, 1999 of Nepal, with the seat of arbitration in Kathmandu, Nepal. The language of arbitration shall be English.
- Force Majeure: Neither party shall be liable for delays caused by natural disasters (including earthquakes, which are a recognized risk in the Kathmandu Valley region), government orders, or other events beyond reasonable control, as defined under Nepali contract law.
- Governing Law: This Purchase Order shall be governed by and construed in accordance with the laws of the Federal Democratic Republic of Nepal, including the Contract Act, 2056 (1999) and the VAT Act, 2052 (1996).
- Confidentiality: Both parties agree to maintain strict confidentiality regarding all project details, financial terms, and technical data exchanged under this Purchase Order. This obligation shall survive the termination of this agreement for a period of three (3) years.
By signing below, both parties acknowledge and agree to all terms, conditions, and specifications outlined in this Purchase Order for the Civil Engineer services and materials to be delivered in Nepal Kathmandu.
For and on behalf of the PurchaserHimalayan Infrastructure Development Pvt. Ltd.
Name: Mr. Rajesh Koirala
Designation: Project Director
Signature & Company Seal: _________________________
Date: _______________ For and on behalf of the Supplier / Civil Engineer
Kathmandu Civil Engineering Consultants LLP
Name: Engr. Sunita Sharma
Designation: Lead Civil Engineer / Managing Partner
Signature & Company Seal: _________________________
Date: _______________ ⬇️ Download as DOCX Edit online as DOCX
Create your own Word template with our GoGPT AI prompt:
GoGPT