GoGPT GoSearch New DOC New XLS New PPT

OffiDocs favicon

Purchase Order Electrical Engineer in Senegal Dakar –Free Word Template Download with AI

Electrical Engineer Professional Services — Senegal Dakar

Société d'Ingénierie & Bâtiment du Sénégal (SIBS) S.A.

Route de l'Aéroport, Zone Industrielle, Dakar, Sénégal

Tel: +221 33 864 2200 | Email: [email protected]

Purchase Order No.: PO-SIBS-2025-0472
Date of Issue: 14 June 2025
Valid Until: 14 September 2025
Project Reference: DAK-EE-2025-118
Payment Terms: Net 45 Days
Currency: West African CFA Franc (XOF)
1. PARTIES TO THIS PURCHASE ORDER
Buyer (Purchasing Entity) Supplier / Service Provider
Société d'Ingénierie & Bâtiment du Sénégal (SIBS) S.A.
Route de l'Aéroport, Zone Industrielle
Dakar, Sénégal
RC: SN-DKR-2019-B-04472
NINEA: 004472189 DKR
Contact: M. Ousmane Diop, Procurement Director
Ingénieur Électrique & Conseil (IEC) SARL
12 Avenue Cheikh Anta Diop, Plateau
Dakar, Sénégal
RC: SN-DKR-2017-B-02215
NINEA: 002215876 DKR
Contact: Mme. Awa Ndiaye, Lead Electrical Engineer
2. Download and customize a professional Purchase Order Electrical Engineer Senegal Dakar Word template. Perfect for business, legal, and personal use. Editable and ready to boost your productivity. OF SERVICES — ELECTRICAL ENGINEER SCOPE

This Purchase Order is issued by SIBS S.A. to procure the professional services of a qualified Electrical Engineer and associated technical team for the design, review, and commissioning of the electrical infrastructure for the new commercial complex located in the Almadies district of Dakar, Senegal. The Electrical Engineer shall be responsible for all aspects of electrical system design in compliance with the Senegalese national electrical code (Norme Sénégalaise NS 32-010), the regulations of the Sénegal Electricity Company (SNE), and the International Electrotechnical Commission (IEC) standards as adopted in Senegal.

The scope of work for the Electrical Engineer includes, but is not limited to: preliminary load calculations, single-line diagram development, power distribution system design, lighting design for all floors, emergency and backup power generation planning, grounding and lightning protection systems, fire alarm and security electrical integration, and final commissioning and handover documentation. All deliverables must be produced in both French and English to satisfy the bilingual regulatory requirements of the Senegalese Ministry of Energy and Hydrocarbons.

3. LINE ITEMS AND PRICING
Item No. Description Qty Unit Unit Price (XOF) Total (XOF)
01 Senior Electrical Engineer — Full project design and supervision (Dakar, Senegal site) 1 Professional 8,500,000 8,500,000
02 Junior Electrical Engineer — Load calculations, CAD drafting, and documentation support 2 Professionals 4,200,000 8,400,000
03 Electrical system simulation and thermal analysis software license (project duration) 1 License 1,850,000 1,850,000
04 Site inspection and commissioning visits in Dakar, Senegal (estimated 12 visits) 12 Visits 350,000 4,200,000
05 Regulatory submission and approval coordination with SNE and Dakar municipal authorities 1 Lump Sum 2,100,000 2,100,000
06 Final as-built documentation, training of SIBS maintenance staff, and handover report 1 Lump Sum 1,500,000 1,500,000
Subtotal 26,550,000
VAT (18% — Senegal) 4,779,000
GRAND TOTAL (XOF) 31,329,000
4. TERMS AND CONDITIONS
  1. Governing Law: This Purchase Order shall be governed by and construed in accordance with the laws of the Republic of Senegal, including the Senegalese Civil Code, the Code des Marchés Publics et Privés, and all applicable regulations of the Dakar municipal authority. Any disputes arising from this Purchase Order shall be resolved through the competent courts of Dakar, Senegal.
  2. Performance Period: The Electrical Engineer and associated team shall commence work no later than 1 July 2025 and shall complete all deliverables by 30 November 2025. All on-site work shall be conducted at the project location in Almadies, Dakar, Senegal, during standard business hours (08:00–17:00, Monday to Friday).
  3. Payment Schedule: Payment shall be made in three installments: 30% upon signing of this Purchase Order, 40% upon completion and approval of the full electrical design package, and 30% upon successful commissioning and final handover. All payments shall be made via bank transfer to the supplier's account in Dakar, Senegal, in West African CFA Francs (XOF).
  4. Qualifications and Compliance: The lead Electrical Engineer must hold a minimum of a Master's degree in Electrical Engineering from a recognized institution, a valid professional license issued by the Ordre des Ingénieurs du Sénégal, and a minimum of ten (10) years of experience in commercial and industrial electrical projects in West Africa. All team members must possess valid work permits for Senegal.
  5. Insurance and Liability: The supplier shall maintain professional indemnity insurance with a minimum coverage of 50,000,000 XOF and third-party liability insurance throughout the duration of this Purchase Order. The supplier shall be liable for any defects in the electrical design that result in non-compliance with Senegalese electrical safety standards.
  6. Intellectual Property: All drawings, calculations, reports, and documentation produced under this Purchase Order shall become the exclusive property of SIBS S.A. upon full payment. The Electrical Engineer shall not reuse, reproduce, or disclose any project-specific information without prior written consent.
  7. Termination: Either party may terminate this Purchase Order with thirty (30) days' written notice. In the event of termination for convenience, SIBS S.A. shall pay for all services rendered up to the termination date. In the event of termination for cause due to the Electrical Engineer's failure to meet the agreed milestones, the supplier shall refund any advance payments not yet earned.
  8. Force Majeure: Neither party shall be liable for delays caused by events beyond reasonable control, including but not limited to natural disasters, government-imposed restrictions in Senegal, or civil unrest in the Dakar region, provided that the affected party notifies the other within five (5) business days.
  9. Confidentiality: Both parties agree to maintain strict confidentiality regarding all technical, financial, and commercial information exchanged in connection with this Purchase Order. This obligation shall survive the termination of this Purchase Order for a period of three (3) years.
  10. Local Content and Labor: In accordance with Senegalese labor regulations, the supplier shall ensure that at least 70% of the on-site technical staff are Senegalese nationals. All employment relationships shall comply with the Senegalese Labor Code (Code du Travail du Sénégal).
5. ACCEPTANCE AND SIGNATURES

By signing below, both parties acknowledge that they have read, understood, and agree to all terms and conditions set forth in this Purchase Order for the procurement of Electrical Engineer services in Senegal Dakar.

For and on behalf of the Buyer:
Société d'Ingénierie & Bâtiment du Sénégal (SIBS) S.A.

Name: M. Ousmane Diop
Title: Procurement Director
Signature: _________________________
Date: _________________________

For and on behalf of the Supplier:
Ingénieur Électrique & Conseil (IEC) SARL

Name: Mme. Awa Ndiaye
Title: Lead Electrical Engineer / Managing Director
Signature: _________________________
Date: _________________________

This Purchase Order (PO-SIBS-2025-0472) is issued in two (2) original copies, one for each party. This document is valid only when signed and stamped by both parties. All communications regarding this Purchase Order shall be directed to the procurement office of SIBS S.A., Dakar, Senegal.

© 2025 Société d'Ingénierie & Bâtiment du Sénégal (SIBS) S.A. — Dakar, Sénégal. All rights reserved.

⬇️ Download as DOCX Edit online as DOCX

Create your own Word template with our GoGPT AI prompt:

GoGPT
×
Advertisement
❤️Shop, book, or buy here — no cost, helps keep services free.