GoGPT GoSearch New DOC New XLS New PPT

OffiDocs favicon

Purchase Order Mechanical Engineer in China Beijing –Free Word Template Download with AI

Procurement of Mechanical Engineer Professional Services — China Beijing Operations Division Purchase Order No.: PO-CB-2025-04782
Date of Issue: 14 June 2025
Valid Until: 14 September 2025
Priority: HIGH
Department: Engineering & Design
Location: China Beijing
1. Purchasing Entity (Buyer)
Field Details
Company Name Beijing Precision Engineering Solutions Co., Ltd. (BPES)
Registered Address Building 12, Zhongguancun Science Park, Haidian District, China Beijing, 100080
Unified Social Credit Code 91110108MA01KX7P2B
Authorized Buyer Mr. Zhang Wei, Procurement Director
Contact [email protected] | +86-10-8876-5432
2. Supplier / Service Provider (Seller)
Field Details
Company Name Capital Mechanical Consulting Group (CMCG)
Registered Address Floor 22, China World Trade Center Tower II, Chaoyang District, China Beijing, 100020
Unified Social Credit Code 91110105MA02RT4N8C
Primary Contact Ms. Li Fang, Account Manager
Contact [email protected] | +86-10-6543-2100
3. Scope of Work & Line Items

This Purchase Order authorizes the procurement of specialized Mechanical Engineer professional services to be delivered at the China Beijing operational site. The Mechanical Engineer shall provide comprehensive design, analysis, prototyping, and quality assurance support for the FY2025 capital equipment upgrade programme. All deliverables must comply with the national standards of the People's Republic of China (GB/T) and applicable China Beijing municipal regulations.

Item # Description of Service Quantity Unit Unit Price (CNY) Amount (CNY)
01 Senior Mechanical Engineer — Full design and CAD modelling of hydraulic press assembly (SolidWorks / AutoCAD), including 3D assembly drawings and 2D fabrication sheets, delivered at the China Beijing workshop. 1 Project 185,000.00 185,000.00
02 Mechanical Engineer — Finite Element Analysis (FEA) and stress simulation of the main structural frame, with written technical report and remediation recommendations. 1 Project 92,000.00 92,000.00
03 Mechanical Engineer — On-site installation supervision and commissioning at the China Beijing manufacturing plant (Haidian District), including safety compliance verification per GB 50016. 15 Days 4,500.00 67,500.00
04 Mechanical Engineer — Preparation of technical documentation package (operation manuals, maintenance schedules, spare parts BOM) in both Mandarin Chinese and English for the China Beijing facility. 1 Package 38,000.00 38,000.00
05 Mechanical Engineer — Post-delivery warranty support and remote troubleshooting, 12-month period, covering all components designed under this Purchase Order. 12 Months 6,200.00 74,400.00
Subtotal 456,900.00
VAT (13% — China Beijing standard rate) 59,397.00
TOTAL AMOUNT DUE (CNY) 516,297.00
4. Payment Terms
  1. Advance Payment (30%): CNY 154,889.10 shall be remitted within ten (10) business days of the acceptance of this Purchase Order by both parties. Payment shall be made via bank transfer to the supplier's designated account in China Beijing.
  2. Milestone Payment (40%): CNY 206,518.80 shall be due upon successful delivery and buyer sign-off of all CAD models, FEA reports, and technical documentation at the China Beijing project site.
  3. Final Payment (30%): CNY 154,889.10 shall be payable within fifteen (15) business days after the completion of on-site commissioning and the commencement of the 12-month warranty period.
  4. All payments are denominated in Chinese Yuan (CNY). Late payments shall accrue interest at 0.05% per calendar day as stipulated under the Civil Code of the People's Republic of China.
5. Delivery & Acceptance Criteria
  1. All design deliverables must be submitted to the buyer's project manager at the China Beijing office no later than 30 August 2025. The Mechanical Engineer is responsible for ensuring that all files are in industry-standard formats (STEP, DWG, PDF) and are free of intellectual property encumbrances.
  2. On-site services shall be performed at the buyer's facility in Haidian District, China Beijing, during standard working hours (08:30–17:30, Monday to Friday). The Mechanical Engineer must present valid work permits and comply with all site safety protocols.
  3. The buyer reserves the right to conduct a formal acceptance inspection within five (5) business days of delivery. Any non-conformities must be rectified by the Mechanical Engineer at no additional cost within ten (10) business days of written notice.
6. Terms & Conditions
  1. This Purchase Order is governed by the laws of the People's Republic of China. Any disputes arising from this Purchase Order shall be resolved through arbitration at the Beijing Arbitration Commission (BAC) in China Beijing.
  2. The Mechanical Engineer and the supplier warrant that all services and deliverables shall be performed with reasonable skill, care, and in accordance with the latest applicable national standards (GB) and China Beijing local regulations.
  3. Confidentiality: All technical data, proprietary designs, and business information exchanged under this Purchase Order shall be treated as strictly confidential. The Mechanical Engineer shall not disclose any such information to third parties without prior written consent from the buyer.
  4. Intellectual Property: Upon full payment, all designs, drawings, analyses, and documentation created specifically for the buyer under this Purchase Order shall become the sole property of Beijing Precision Engineering Solutions Co., Ltd.
  5. Force Majeure: Neither party shall be liable for delays caused by events beyond reasonable control, including but not limited to natural disasters, government mandates in China Beijing, or public health emergencies, provided that written notice is given within 48 hours.
  6. This Purchase Order becomes effective upon signature by both authorized representatives and remains valid until all obligations are fully discharged.
7. Authorisation & Signatures

For and on behalf of the Buyer:
Beijing Precision Engineering Solutions Co., Ltd.

Name: Mr. Zhang Wei
Title: Procurement Director
Signature: _________________________
Date: _________________________

For and on behalf of the Seller:
Capital Mechanical Consulting Group

Name: Ms. Li Fang
Title: Account Manager
Signature: _________________________
Date: _________________________

This Purchase Order (PO-CB-2025-04782) was issued by Beijing Precision Engineering Solutions Co., Ltd. for the procurement of Mechanical Engineer professional services in China Beijing. This document is valid only when bearing the official company seal (gongzhang) of both parties. Unauthorised reproduction or distribution is prohibited.

© 2025 BPES — China Beijing Operations Division. All rights reserved.

⬇️ Download as DOCX Edit online as DOCX

Create your own Word template with our GoGPT AI prompt:

GoGPT
×
Advertisement
❤️Shop, book, or buy here — no cost, helps keep services free.