Purchase Order Petroleum Engineer in Nigeria Lagos –Free Word Template Download with AI
Address: 14B Admiralty Way, Victoria Island,
Lagos, Nigeria
Phone: +234 (0) 803 555 7210
Email: [email protected]
RC No.: 1284573 Supplier Name: GeoCore Engineering & Consulting Services Ltd.
Address: 22 Adeola Odeku Street, Lekki Phase 1, Lagos, Nigeria
Phone: +234 (0) 812 447 9933
Email: [email protected]
Tax Identification Number (TIN): 1045-8823-7710
RC No.: 987234 This Purchase Order is issued by NigerDelta Energy Solutions Ltd. (hereinafter referred to as the "Buyer") to GeoCore Engineering & Consulting Services Ltd. (hereinafter referred to as the "Supplier") for the engagement of a qualified Petroleum Engineer and the provision of associated technical services, equipment, and deliverables. This Purchase Order governs all terms, conditions, scope of work, and financial obligations related to the Petroleum Engineer assignment to be carried out within the Nigeria Lagos operational zone, specifically at the Buyer's onshore and offshore processing facilities located along the Lagos Lagoon corridor and the Apapa industrial district.
| Item No. | Description | Qty | Unit | Unit Price (NGN) | Amount (NGN) |
|---|---|---|---|---|---|
| 01 | Engagement of a Senior Petroleum Engineer (minimum 10 years' experience in reservoir management and well optimization) for a period of six (6) months, including daily site supervision at the Nigeria Lagos processing plant. | 1 | Contract | 4,500,000 | 4,500,000 |
| 02 | Provision of a comprehensive Reservoir Performance Analysis Report prepared by the Petroleum Engineer, covering all active wells in the Nigeria Lagos concession area, with recommendations for enhanced oil recovery (EOR) techniques. | 1 | Report | 2,800,000 | 2,800,000 |
| 03 | Supply and calibration of a portable downhole pressure-temperature (P-T) gauge kit to be used by the Petroleum Engineer during routine well inspections in the Nigeria Lagos operational zone. | 2 | Set | 1,250,000 | 2,500,000 |
| 04 | Provision of a 3D seismic interpretation software license (annual subscription) for use by the Petroleum Engineer in modeling subsurface geology around the Nigeria Lagos basin. | 1 | License | 3,200,000 | 3,200,000 |
| 05 | Monthly technical training sessions (4 sessions) conducted by the Petroleum Engineer for the Buyer's junior engineering staff at the Nigeria Lagos training centre, covering well integrity, flow assurance, and production optimization. | 4 | Session | 450,000 | 1,800,000 |
| 06 | Provision of personal protective equipment (PPE) and site-specific safety gear for the Petroleum Engineer, compliant with NUPRC and NCDCC regulations applicable in Nigeria Lagos. | 1 | Set | 350,000 | 350,000 |
| 07 | Transportation and logistics support for the Petroleum Engineer between the Nigeria Lagos residential accommodation and the onshore processing facility (Apapa site) for the duration of the contract. | 6 | Month | 180,000 | 1,080,000 |
| 08 | Final project handover documentation, including as-built drawings, well completion reports, and a 12-month predictive maintenance schedule authored by the Petroleum Engineer. | 1 | Package | 950,000 | 950,000 |
| Subtotal | 17,180,000 | ||||
| VAT (7.5%) | 1,288,500 | ||||
| TOTAL AMOUNT DUE (NGN) | 18,468,500 | ||||
- The Petroleum Engineer engaged under this Purchase Order must hold a valid professional registration with the Nigerian Institution of Mining and Geology (NIMG) and a current Practicing Certificate issued by the Council for the Regulation of Engineering in Nigeria (COREN).
- The Supplier shall ensure that the Petroleum Engineer complies with all Health, Safety, and Environment (HSE) protocols mandated by the Nigerian Upstream Petroleum Regulatory Commission (NUPRC) and the Nigeria LNG regulatory framework applicable to operations in Nigeria Lagos.
- Any change in scope, extension of the contract period, or substitution of the Petroleum Engineer must be documented in a formal Change Order signed by both parties before implementation.
- The Supplier warrants that all equipment and software delivered under this Purchase Order shall be free from defects, fully calibrated, and fit for purpose in the operational environment of Nigeria Lagos, including high-humidity and corrosive coastal conditions.
- This Purchase Order is governed by the laws of the Federal Republic of Nigeria. Any disputes arising from this Purchase Order shall be resolved through arbitration in Lagos, Nigeria, in accordance with the Arbitration and Conciliation Act (Cap A18, LFN 2004).
- Confidentiality: All data, reports, and proprietary information generated by the Petroleum Engineer in the course of this Purchase Order shall remain the exclusive property of the Buyer. The Supplier and the Petroleum Engineer shall not disclose such information to any third party without prior written consent.
______________________________
Name: Engr. Adewale Okafor
Title: Head of Procurement & Supply Chain
NigerDelta Energy Solutions Ltd.
Date: _______________ For and on behalf of the Supplier:
______________________________
Name: Dr. Funke Adeyemi
Title: Managing Director
GeoCore Engineering & Consulting Services Ltd.
Date: _______________
This Purchase Order (PO/NDEL/2025/04782) is the property of NigerDelta Energy Solutions Ltd. and is intended solely for the use of the named Supplier in connection with the Petroleum Engineer services to be rendered in Nigeria Lagos. Unauthorized reproduction or distribution is strictly prohibited. For queries, contact the Procurement Department at [email protected] or +234 (0) 803 555 7210.
⬇️ Download as DOCX Edit online as DOCXCreate your own Word template with our GoGPT AI prompt:
GoGPT