Quotation Estimate Baker in Peru Lima –Free Word Template Download with AI
Av. Javier Prado Este 1250, San Isidro, Peru Lima, 15081
RUC: 20587431296 | Tel: +51 1 445-6789 | Email: [email protected]
Registered in the Public Registry of Peru Lima – Commercial Registry No. 00452187
Quotation Estimate| Quotation No.: | BAK-PL-2025-00847 |
| Date of Issue: | June 12, 2025 |
| Valid Until: | July 12, 2025 (30 calendar days) |
| Client Name: | Inversiones del Pacífico S.A.C. |
| Client Address: | Calle Puno 892, Miraflores, Peru Lima, 15074 |
| Client RUC: | 20601234567 |
| Project Location: | Industrial Zone, Callao, Peru Lima Metropolitan Area |
| Prepared By: | Ing. Ricardo Mendoza – Senior Estimator, Baker Peru Lima Office |
This Quotation Estimate is issued by Baker Engineering & Consulting Group, a specialized firm operating in Peru Lima, in response to the formal request for proposal received from Inversiones del Pacífico S.A.C. The scope of work encompasses the complete design, engineering, procurement, and installation of a commercial-grade industrial baking and food processing facility located in the Callao industrial district within the Peru Lima metropolitan area. Baker has been engaged to deliver a turnkey solution that complies with all applicable Peruvian regulatory standards, including those established by the Ministry of Health (MINSA), the National Institute of Quality (INACAL), and the municipal building codes of Peru Lima.
The Baker team, drawing upon over fifteen years of experience in industrial food processing projects across South America, has prepared this Quotation Estimate to reflect the most competitive and technically sound pricing available for the described scope. All materials, labor, equipment, and professional services outlined herein are subject to the terms and conditions specified in Section 5 of this document.
2. Detailed Cost Breakdown| Item No. | Description | Unit | Qty | Unit Price (PEN) | Subtotal (PEN) |
|---|---|---|---|---|---|
| 01 | Architectural and structural design services for the Baker-specified facility layout (Peru Lima municipal code compliance) | Lot | 1 | 185,000.00 | 185,000.00 |
| 02 | Industrial oven and baking line equipment – 6 units (German-manufactured, Baker-certified) | Unit | 6 | 248,500.00 | 1,491,000.00 |
| 03 | Dough preparation and mixing systems – 3 complete lines | Line | 3 | 112,000.00 | 336,000.00 |
| 04 | Cooling and refrigeration infrastructure (HVAC and cold storage – 200 m³ capacity) | Lot | 1 | 425,000.00 | 425,000.00 |
| 05 | Electrical installation, panel boards, and automation control systems (Baker proprietary SCADA) | Lot | 1 | 298,000.00 | 298,000.00 |
| 06 | Plumbing, steam generation, and sanitary water systems | Lot | 1 | 175,000.00 | 175,000.00 |
| 07 | Fire suppression and safety systems (Peru Lima Fire Brigade compliance) | Lot | 1 | 96,500.00 | 96,500.00 |
| 08 | Project management, supervision, and Baker on-site engineering team (14-month duration) | Month | 14 | 42,000.00 | 588,000.00 |
| 09 | Training and commissioning – 12-hour operator certification program (Baker Academy, Peru Lima) | Lot | 1 | 68,000.00 | 68,000.00 |
| 10 | Warranty, spare parts kit, and 24-month post-installation support (Baker Service Center, Peru Lima) | Lot | 1 | 134,000.00 | 134,000.00 |
| SUBTOTAL (before IGV) | 3,806,500.00 | ||||
| IGV 18% (Peruvian General Sales Tax) | 685,170.00 | ||||
| TOTAL AMOUNT (PEN) | 4,491,670.00 | ||||
Baker requests payment in accordance with the following milestones, all amounts expressed in Peruvian Soles (PEN):
- 30% advance payment (PEN 1,347,501.00) upon signing of the definitive contract and issuance of the corresponding invoice by Baker.
- 40% progress payment (PEN 1,796,668.00) upon completion of equipment delivery and installation at the Peru Lima project site.
- 20% commissioning payment (PEN 898,334.00) upon successful commissioning, testing, and handover of the facility.
- 10% final retention (PEN 449,167.00) payable 90 days after final acceptance, subject to the expiration of the initial warranty period without unresolved defects.
Baker estimates a total project duration of fourteen (14) calendar months from the date of contract execution. The schedule includes a three-month design and permitting phase (Peru Lima municipal approvals), a five-month procurement and fabrication period, a four-month on-site installation and integration phase, and a two-month commissioning and training period. Baker commits to delivering the completed facility no later than August 2026, subject to timely provision of site access and regulatory clearances by the client.
5. Terms and Conditions- This Quotation Estimate is valid for thirty (30) calendar days from the date of issue. After this period, Baker reserves the right to revise pricing due to market fluctuations in material costs, exchange rates, or regulatory changes within Peru Lima.
- All prices are quoted in Peruvian Soles (PEN) and include IGV at the current rate of 18%. Any change in the national tax rate will be reflected proportionally.
- Baker shall not be liable for delays caused by force majeure events, including but not limited to natural disasters, government-mandated shutdowns, or labor strikes affecting the Peru Lima metropolitan area.
- The client is responsible for obtaining all land-use permits, environmental impact assessments, and municipal construction licenses required by the Peru Lima authorities prior to the commencement of physical works.
- Baker warrants all supplied equipment for a minimum of twenty-four (24) months from the date of commissioning. Warranty service will be provided through the Baker Service Center located in San Isidro, Peru Lima.
- Any modifications to the scope of work must be approved in writing by both parties and will be subject to a supplementary Quotation Estimate issued by Baker.
- Disputes arising from this Quotation Estimate or the subsequent contract shall be resolved through arbitration in Peru Lima in accordance with the rules of the Lima Chamber of Commerce.
By signing below, the client acknowledges receipt of this Quotation Estimate from Baker and agrees to the terms, conditions, pricing, and scope of work described herein. This document does not constitute a binding contract until a definitive agreement is executed by both parties.
For Baker Engineering & Consulting GroupIng. Ricardo Mendoza
Senior Estimator – Peru Lima Office
Date: _______________ For Inversiones del Pacífico S.A.C.
Name: _________________________
Position: ______________________
Date: _______________ ⬇️ Download as DOCX Edit online as DOCX