Quotation Estimate Electronics Engineer in Afghanistan Kabul –Free Word Template Download with AI
Professional Electronics Engineer Services
Project Location: Afghanistan Kabul
Document Reference: QE-2025-AFK-0047
| Date of Issue: | 15 June 2025 | Quotation Validity: | 30 Days from Date of Issue |
| Prepared By: | Eng. Karim Rahimi, Senior Electronics Engineer | Currency: | US Dollars (USD) |
| Client Name: | Ministry of Communications & IT, Kabul | Project Site: | Afghanistan Kabul, District 4, Karza Bazaar Area |
| Contact Person: | Mr. Ahmad Wali, Procurement Officer | Contact Email: | [email protected] |
This Quotation Estimate is formally issued to provide a comprehensive and transparent breakdown of all professional services, materials, and associated costs required for the engagement of a qualified Electronics Engineer to deliver technical consultancy, system design, installation, and maintenance support within the capital city of Afghanistan Kabul. This document serves as the primary financial and technical reference for the client to evaluate the scope, timeline, and investment required for the project. All pricing contained within this Quotation Estimate reflects current market rates applicable to the Afghanistan Kabul region, including considerations for local logistics, security premiums, and import duties on specialized electronic components.
The Electronics Engineer engaged under this Quotation Estimate shall perform the following duties and deliverables at the designated project site in Afghanistan Kabul:
- Conduct a full-site electrical and electronic systems audit of the existing telecommunications infrastructure located in the Karza Bazaar district of Afghanistan Kabul.
- Design and develop a comprehensive schematic for a new 500-channel radio communication network, including frequency allocation, antenna placement, and signal propagation analysis specific to the topography of Afghanistan Kabul.
- Procure, inspect, and install all necessary electronic components, circuit boards, power supply units, and signal amplifiers required for the network deployment.
- Perform calibration, testing, and commissioning of all installed electronic systems to ensure compliance with international telecommunications standards and local regulatory requirements.
- Provide a minimum of 120 hours of on-site technical training to local Afghanistan Kabul government staff for the operation and basic maintenance of the newly installed systems.
- Deliver a complete technical documentation package, including wiring diagrams, component specifications, troubleshooting guides, and a 12-month preventive maintenance schedule.
- Offer a 6-month post-installation warranty period covering all electronic components and labor performed by the Electronics Engineer.
| Item No. | Description of Service / Component | Quantity | Unit Cost (USD) | Total Cost (USD) |
|---|---|---|---|---|
| 01 | Senior Electronics Engineer – Professional Consultancy (Site Audit & Design Phase) | 15 days | 450.00 | 6,750.00 |
| 02 | Electronics Engineer – Installation & Commissioning Labor | 25 days | 400.00 | 10,000.00 |
| 03 | Radio Communication Transceiver Units (500-channel capable) | 12 units | 1,850.00 | 22,200.00 |
| 04 | Antenna Arrays, Mounting Hardware & Cabling (RG-213, 50-ohm) | 1 lot | 4,300.00 | 4,300.00 |
| 05 | Industrial Power Supply Units (24V DC, 20A) with Surge Protection | 12 units | 320.00 | 3,840.00 |
| 06 | Signal Amplifiers & Frequency Filters | 8 units | 580.00 | 4,640.00 |
| 07 | Technical Training Program for Local Staff (120 hours, Afghanistan Kabul) | 1 program | 3,500.00 | 3,500.00 |
| 08 | Documentation, Schematics & Maintenance Manual (Hard & Digital Copy) | 1 set | 1,200.00 | 1,200.00 |
| 09 | Local Logistics, Transportation & Security Escort within Afghanistan Kabul | 1 lot | 2,800.00 | 2,800.00 |
| 10 | Import Duties, Customs Clearance & VAT on Electronic Components | 1 lot | 3,100.00 | 3,100.00 |
| TOTAL ESTIMATED COST (USD) | $62,330.00 | |||
The Electronics Engineer shall complete all phases of this project within a total duration of ten (10) weeks from the date of contract signing. The audit and design phase is estimated at three weeks, procurement and component delivery at two weeks, installation and commissioning at three weeks, and training plus final documentation at two weeks. All timelines are subject to the operational conditions and security situation prevailing in Afghanistan Kabul at the time of execution.
- This Quotation Estimate is valid for thirty (30) calendar days from the date of issue. Any request for a revised Quotation Estimate after this period will be subject to re-evaluation of material and labor costs in Afghanistan Kabul.
- Payment shall be structured as follows: 30% advance upon contract signing, 40% upon completion of installation and commissioning, and 30% upon final acceptance and handover of documentation.
- All electronic components and materials specified in this Quotation Estimate shall be new, unused, and sourced from certified manufacturers. The Electronics Engineer guarantees a minimum 6-month warranty on all installed hardware.
- The client shall provide secure access to the project site in Afghanistan Kabul, including necessary permits, local coordination, and a safe working environment for the Electronics Engineer and support staff.
- Any changes to the scope of work must be documented in a formal change order and may result in an updated Quotation Estimate.
- This Quotation Estimate does not constitute a binding contract until both parties have signed and returned the acceptance section below.
- All disputes arising from the execution of this project shall be resolved through amicable negotiation, with the governing law being that of the Islamic Republic of Afghanistan.
By signing below, both parties acknowledge that they have read, understood, and agree to all terms, conditions, and cost figures presented in this Quotation Estimate for the engagement of an Electronics Engineer to deliver the specified services in Afghanistan Kabul.
Prepared By (Service Provider)
Eng. Karim Rahimi
Senior Electronics Engineer
Technical Services Division
Accepted By (Client)
Mr. Ahmad Wali
Procurement Officer
Ministry of Communications & IT, Kabul
Create your own Word template with our GoGPT AI prompt:
GoGPT