Quotation Details

Quotation Estimate No.: QTE-2025-SH-0472

Date of Issue: 14 June 2025

Valid Until: 14 September 2025 (90 days)

Project Location: China Shanghai, Pudong New Area

Currency: Chinese Yuan (CNY / RMB)

Client Information

Prepared For: Shanghai Riverside Industrial Park Development Co., Ltd.

Attn: Mr. Wei Zhang, Director of Facilities & Compliance

Address: 560 Binjiang Avenue, Pudong, China Shanghai

Contact: +86-21-6333-9900 | [email protected]

1. SCOPE OF WORK – ENVIRONMENTAL ENGINEER SERVICES IN CHINA SHANGHAI

This Quotation Estimate is issued by GreenScape Environmental Consulting Co., Ltd. to provide comprehensive Environmental Engineer services for the Shanghai Riverside Industrial Park Development project located in the Pudong New Area of China Shanghai. The scope encompasses environmental impact assessment (EIA), wastewater treatment system design, air quality monitoring, soil remediation planning, and ongoing regulatory compliance support in accordance with the Environmental Protection Law of the People's Republic of China (2014 revision) and all applicable local ordinances issued by the Shanghai Municipal Environmental Protection Bureau.

The designated Environmental Engineer assigned to this engagement will hold a valid Class-1 Registered Environmental Engineer (一级注册环保工程师) certification issued by the Ministry of Housing and Urban-Rural Development of China, with a minimum of twelve (12) years of professional experience in industrial environmental projects within the China Shanghai metropolitan region.

2. LINE-ITEM COST BREAKDOWN
No. Description of Environmental Engineer Service Unit Quantity Unit Price (CNY) Total (CNY)
1 Environmental Impact Assessment (EIA) report preparation and submission to the Shanghai Municipal Development and Reform Commission for the industrial park expansion zone in China Shanghai Lump Sum 1 480,000.00 480,000.00
2 Wastewater treatment plant (WWTP) process design – 15,000 m³/day capacity, including hydraulic modelling, equipment specification, and construction drawings compliant with GB 8978-1996 discharge standards Lump Sum 1 1,250,000.00 1,250,000.00
3 Ambient air quality monitoring and dispersion modelling (VOCs, NOx, PM2.5) for a 12-month baseline period across 8 monitoring stations within the China Shanghai project boundary Month 12 38,500.00 462,000.00
4 Soil and groundwater contamination investigation and remediation design for the 42-hectare brownfield parcel, including Phase I and Phase II site assessments per HJ 25.1-2019 Lump Sum 1 620,000.00 620,000.00
5 Environmental compliance audit and annual reporting – preparation of the Annual Environmental Protection Report (年度环境保护报告) and coordination with the Pudong District Ecology and Environment Bureau Year 3 95,000.00 285,000.00
6 Stormwater management and non-point source pollution control design for the 1.2 km² park area, incorporating green infrastructure and low-impact development (LID) strategies suited to the subtropical climate of China Shanghai Lump Sum 1 340,000.00 340,000.00
7 On-site supervision by the lead Environmental Engineer during construction phase – minimum 200 person-days of resident engineering oversight Person-Day 200 2,800.00 560,000.00
8 Environmental management plan (EMP) development, staff training workshops (4 sessions), and emergency response protocol for chemical spill scenarios Lump Sum 1 175,000.00 175,000.00
SUBTOTAL 4,172,000.00
VAT (Value Added Tax) at 6% 250,320.00
GRAND TOTAL (CNY) 4,422,320.00
3. PAYMENT SCHEDULE
Milestone Percentage Amount (CNY) Trigger
Advance Payment20%884,464.00Upon signed contract and receipt of Quotation Estimate acceptance
Design Completion30%1,326,696.00Submission and approval of all design documents by the client
Construction Supervision30%1,326,696.00Monthly progress billing based on Environmental Engineer site logs
Final Handover20%884,464.00Completion of all deliverables and issuance of the final compliance certificate
4. TERMS AND CONDITIONS

4.1 This Quotation Estimate is valid for a period of ninety (90) calendar days from the date of issue. Any request for a revised Quotation Estimate beyond this period shall be subject to re-evaluation of material and labour costs prevailing in China Shanghai at that time.

4.2 All prices are quoted in Chinese Yuan (CNY) and are inclusive of the Environmental Engineer's professional fees, travel within the China Shanghai municipality, and standard field equipment. Costs for travel outside the Shanghai municipal boundary shall be billed at actuals with prior written approval.

4.3 The Environmental Engineer shall maintain professional indemnity insurance with a minimum coverage of CNY 10,000,000 per occurrence throughout the duration of the engagement.

4.4 All deliverables, including EIA reports, design drawings, monitoring data, and compliance filings, shall be submitted in both Simplified Chinese and English to satisfy the requirements of the Shanghai Municipal Environmental Protection Bureau and the client's international stakeholders.

4.5 Intellectual property rights in all documents produced under this Quotation Estimate shall vest in the client upon full payment. The Environmental Engineer retains the right to reference the project in professional portfolios with the client's written consent.

4.6 Force majeure events, including but not limited to government-mandated environmental shutdowns, typhoon-related work stoppages common to the China Shanghai coastal region, or changes in national environmental legislation, shall extend the project timeline on a day-for-day basis without penalty to either party.

4.7 Disputes arising from this Quotation Estimate shall be resolved through arbitration under the Shanghai International Arbitration Center (SHIAC) in accordance with its rules of procedure.

5. ASSUMPTIONS AND EXCLUSIONS

This Quotation Estimate assumes that the client will provide timely access to the project site in China Shanghai, furnish all existing geological and hydrological data, and obtain any necessary permits prior to the commencement of fieldwork. The following are excluded from the scope: construction of the WWTP, procurement of monitoring instruments, legal representation in environmental litigation, and any remediation works exceeding the design parameters specified herein. Additional Environmental Engineer services beyond the stated scope will be quoted separately via a supplementary Quotation Estimate.

For and on behalf of
GreenScape Environmental Consulting Co., Ltd.

______________________________

Dr. Liang Chen, P.E.
Lead Environmental Engineer
Registration No. 3101-2013-00847

Date: _______________

Accepted by
Shanghai Riverside Industrial Park Development Co., Ltd.

______________________________

Mr. Wei Zhang
Director of Facilities & Compliance

Date: _______________

Note: This Quotation Estimate document is a formal commercial proposal and does not constitute a binding contract until countersigned by both parties. The Environmental Engineer services described herein are subject to the final project brief and any amendments agreed upon in writing. All regulatory references pertain to the laws and standards in force in China Shanghai as of the date of issue.

GreenScape Environmental Consulting Co., Ltd. | 1288 Century Avenue, Pudong New Area, China Shanghai 200122

Quotation Estimate No. QTE-2025-SH-0472 | Page 1 of 1 | Generated: 14 June 2025

⬇️ Download as DOCX Edit online as DOCX

Create your own Word template with our GoGPT AI prompt:

GoGPT
×
Advertisement
❤️Shop, book, or buy here — no cost, helps keep services free.