GoGPT GoSearch New DOC New XLS New PPT

OffiDocs favicon

Quotation Estimate Environmental Engineer in Iraq Baghdad –Free Word Template Download with AI

Office: Al-Mansour District, Baghdad, Iraq | Tel: +964-770-123-4567 | Email: [email protected]

Commercial Registration No. 4521-887 | VAT No. IQ-2019-004521

Quotation Estimate

Quotation Details

Quotation No.: GSEC-2025-00347

Date of Issue: 15 June 2025

Valid Until: 15 July 2025 (30 days)

Project Location: Iraq Baghdad – Al-Mansour, Al-Karrada & Al-Rusafa Districts

Prepared By: Dr. Hassan Al-Rashid, Lead Environmental Engineer

Client Information

Client Name: Baghdad Municipal Development Authority

Attention: Eng. Layla Al-Hussein, Procurement Director

Address: 14th Ramadan Street, Baghdad, Iraq

Contact: +964-771-987-6543

Reference No.: BMDA-ENV-2025-112

This Quotation Estimate is issued by GreenSolutions Environmental Consulting Co. in response to the formal request for proposal submitted by the Baghdad Municipal Development Authority. The scope of work outlined herein pertains to the provision of a qualified Environmental Engineer and a supporting technical team to conduct comprehensive environmental impact assessments, pollution monitoring, and regulatory compliance audits across multiple municipal zones in Iraq Baghdad. All pricing, deliverables, and timelines presented in this document are binding for the validity period stated above.

1. Scope of Services – Environmental Engineer Engagement

The primary objective of this engagement is to deploy a senior Environmental Engineer with a minimum of fifteen (15) years of professional experience in industrial and municipal environmental management. The Environmental Engineer shall be responsible for the following activities within the Iraq Baghdad metropolitan area:

  • Conducting a full Environmental Impact Assessment (EIA) for the proposed Al-Karrada wastewater treatment expansion project, in compliance with the Iraqi Environmental Protection Authority (EPA) regulations and the 2015 Iraqi Environmental Law No. 27.
  • Performing quarterly air quality monitoring at twelve (12) fixed stations distributed across Al-Mansour, Al-Karrada, and Al-Rusafa districts in Iraq Baghdad, measuring PM2.5, PM10, SO₂, NO₂, CO, and O₃ concentrations.
  • Executing soil and groundwater contamination surveys at four (4) former industrial sites in the southern industrial corridor of Iraq Baghdad, including laboratory analysis of heavy metals, hydrocarbons, and volatile organic compounds.
  • Preparing a Municipal Solid Waste Management Plan for the city of Baghdad, including waste characterization studies, landfill capacity assessments, and a 10-year waste diversion roadmap.
  • Providing regulatory compliance audits for a minimum of twenty (20) industrial facilities operating in Iraq Baghdad, verifying adherence to discharge permit conditions and emission standards.
  • Delivering two (2) capacity-building workshops for municipal environmental officers on monitoring protocols, data reporting, and the use of GIS-based environmental management tools.
2. Itemized Cost Breakdown
No. Description of Service / Item Quantity Unit Unit Price (USD) Total (USD)
1Senior Environmental Engineer – Full-time on-site supervision and technical leadership (Iraq Baghdad)1Person8,500.008,500.00
2Environmental Impact Assessment (EIA) – Al-Karrada Wastewater Treatment Expansion1Project42,000.0042,000.00
3Air Quality Monitoring – Quarterly field campaigns (12 stations, 4 quarters)4Quarters6,800.0027,200.00
4Soil & Groundwater Contamination Survey – 4 industrial sites (field + lab)4Sites5,400.0021,600.00
5Municipal Solid Waste Management Plan – 10-year roadmap for Baghdad1Deliverable35,000.0035,000.00
6Regulatory Compliance Audits – 20 industrial facilities in Iraq Baghdad20Facilities1,200.0024,000.00
7Capacity-Building Workshops for Municipal Officers (2 sessions)2Workshops3,500.007,000.00
8Field Equipment, Sampling Kits, and Laboratory Analysis Fees1Lump Sum12,500.0012,500.00
9Local Transportation, Permits, and Logistics within Iraq Baghdad1Lump Sum4,800.004,800.00
10Project Management, Reporting, and Administrative Overhead (12%)1Lump Sum15,924.0015,924.00
SUBTOTAL198,524.00
VAT (0% – Exempt under Iraqi Public Procurement Law)0.00
GRAND TOTAL (USD)198,524.00
3. Project Timeline
PhaseActivityDurationTarget Completion
Phase 1Site mobilization, baseline data collection, and EIA scoping in Iraq BaghdadWeeks 1–4July 2025
Phase 2Air quality monitoring (Q3) and soil/groundwater field samplingWeeks 5–10September 2025
Phase 3Regulatory compliance audits and waste characterization studiesWeeks 11–16November 2025
Phase 4Report compilation, EIA finalization, and waste management plan draftingWeeks 17–22January 2026
Phase 5Capacity-building workshops, final review, and handover to clientWeeks 23–26February 2026
4. Terms and Conditions
  1. This Quotation Estimate is valid for thirty (30) calendar days from the date of issue. Any acceptance beyond this period requires written reconfirmation of pricing by GreenSolutions Environmental Consulting Co.
  2. Payment terms: 30% advance mobilization payment upon contract signature; 40% upon completion of Phase 2 deliverables; 30% upon final acceptance of all reports and the handover meeting in Iraq Baghdad.
  3. All invoices shall be issued in United States Dollars (USD). Payment shall be made via bank transfer to the account specified in the contract annex within fifteen (15) business days of invoice receipt.
  4. The Environmental Engineer and all supporting personnel shall comply with all applicable Iraqi federal and Baghdad municipal regulations, including work permits, safety protocols, and data protection requirements.
  5. Any change in scope, additional monitoring stations, or extended fieldwork beyond the parameters defined in this Quotation Estimate shall be subject to a formal change order and a revised cost schedule agreed upon by both parties.
  6. Intellectual property rights for all reports, data sets, and plans produced under this engagement shall vest in the Baghdad Municipal Development Authority upon full payment. GreenSolutions retains the right to reference the project in professional portfolios with client written consent.
  7. Force majeure events, including but not limited to civil unrest, natural disasters, or government-imposed restrictions in Iraq Baghdad, shall suspend project timelines without penalty to either party.
  8. Disputes arising from this Quotation Estimate or the resulting contract shall be resolved through amicable negotiation, failing which they shall be referred to arbitration under the rules of the Iraqi Chamber of Commerce in Baghdad.
5. Acceptance and Authorization

By signing below, the client acknowledges receipt of this Quotation Estimate and agrees to the scope, pricing, and terms outlined herein for the engagement of the Environmental Engineer and associated services in Iraq Baghdad.

For GreenSolutions Environmental Consulting Co.

Dr. Hassan Al-Rashid
Lead Environmental Engineer & Managing Director
Date: _______________

For Baghdad Municipal Development Authority

Eng. Layla Al-Hussein
Procurement Director
Date: _______________

GreenSolutions Environmental Consulting Co. | Al-Mansour District, Baghdad, Iraq | CR: 4521-887 | This Quotation Estimate is a controlled document. Unauthorized reproduction is prohibited.

Page 1 of 1 | Document Ref: GSEC-2025-00347

⬇️ Download as DOCX Edit online as DOCX

Create your own Word template with our GoGPT AI prompt:

GoGPT
×
Advertisement
❤️Shop, book, or buy here — no cost, helps keep services free.