GoGPT GoSearch New DOC New XLS New PPT

OffiDocs favicon

Quotation Estimate Environmental Engineer in Turkey Istanbul –Free Word Template Download with AI

GreenSolutions Environmental Consulting Ltd.

Address: Levent Business District, Büyükdere Caddesi No. 255, 34394 Istanbul, Turkey

Tel: +90 212 555 0147 | Email: [email protected]

Tax ID (VKN): 1234567890 | Chamber of Commerce: Istanbul Ticaret Odası No. 45678

Quotation Details

Quotation Estimate No.: QE-2025-IST-00847

Date of Issue: 14 June 2025

Valid Until: 14 July 2025 (30 calendar days)

Project Location: Turkey Istanbul, European Side

Currency: Turkish Lira (TRY) / USD

Client Information

Client Name: [Client Company Name]

Address: [Client Address], Istanbul, Turkey

Contact Person: [Name & Title]

Email: [[email protected]]

Phone: [Client Phone Number]

1. SCOPE OF WORK – ENVIRONMENTAL ENGINEER SERVICES IN TURKEY ISTANBUL

This Quotation Estimate is prepared by GreenSolutions Environmental Consulting Ltd. to provide comprehensive Environmental Engineer professional services for the client's industrial and commercial development project located in Turkey Istanbul. The scope encompasses all regulatory compliance, environmental impact assessment, waste management planning, air and water quality monitoring, and sustainability consulting required under the Republic of Turkey's Ministry of Environment, Urbanization and Climate Change (Çevre, Şehircilik ve İklim Değişikliği Bakanlığı) regulations and applicable European Union environmental directives as adopted in Turkish law.

The designated Environmental Engineer will hold a valid professional license (Mühendislik Odası Kaydı) registered with the Istanbul Chamber of Engineers (İstanbul Mühendis ve Mimar Odaları Birliği – İMMO) and will possess a minimum of ten (10) years of experience in environmental consulting within the Turkey Istanbul metropolitan region. All services will be delivered in accordance with Turkish Environmental Law No. 2872, the Environmental Impact Assessment Regulation (ÇED Yönetmeliği), and relevant municipal bylaws of the Istanbul Metropolitan Municipality (İstanbul Büyükşehir Belediyesi).

2. ITEMIZED COST BREAKDOWN
No. Description of Environmental Engineer Service Unit Quantity Unit Price (TRY) Total (TRY)
1 Preparation of Environmental Impact Assessment (EIA / ÇED) Report for the project site in Turkey Istanbul, including baseline environmental surveys, stakeholder consultation, and public hearing coordination Lot 1 485,000.00 485,000.00
2 Air Quality Monitoring and Dispersion Modelling (Gaussian Plume Model) for a 12-month period at the Turkey Istanbul project location, including quarterly reporting to the Istanbul Provincial Directorate of Environment Month 12 32,500.00 390,000.00
3 Surface Water and Groundwater Quality Assessment, sampling, and laboratory analysis (ISO 17025 accredited lab) for the Bosphorus-adjacent water bodies in Turkey Istanbul Lot 1 210,000.00 210,000.00
4 Waste Management and Hazardous Waste Disposal Plan preparation, including registration with the Istanbul Provincial Directorate of Environment and coordination with licensed waste transport operators Lot 1 95,000.00 95,000.00
5 Environmental Compliance Auditing and Ongoing Regulatory Reporting (quarterly) for the first 24 months of project operation in Turkey Istanbul Quarter 8 48,000.00 384,000.00
6 Soil Contamination Investigation and Remediation Strategy for the Turkey Istanbul site, including Phase I and Phase II Environmental Site Assessments Lot 1 175,000.00 175,000.00
7 Environmental Management System (EMS) Design and ISO 14001:2015 Certification Support for the client's operations in Turkey Istanbul Lot 1 145,000.00 145,000.00
8 On-site Supervision by a Senior Environmental Engineer (minimum 3 days per week) during the construction phase in Turkey Istanbul Month 18 55,000.00 990,000.00
9 Ecological Restoration and Green Infrastructure Plan for the Turkey Istanbul project area, including native species planting and biodiversity offset strategy Lot 1 120,000.00 120,000.00
10 Final Environmental Closure Report and Post-Project Monitoring Protocol (12 months) for the Turkey Istanbul site Lot 1 88,000.00 88,000.00
SUBTOTAL 3,082,000.00
VAT (KDV) – 20% 616,400.00
GRAND TOTAL (TRY) 3,698,400.00
GRAND TOTAL (USD – approx. at 32.50 TRY/USD) 113,800.00
3. PAYMENT SCHEDULE
Milestone Percentage Amount (TRY) Due Date
Contract Signing and Mobilization20%739,680.00Within 10 business days of contract execution
EIA Report Submission to Ministry25%924,600.00Upon official submission receipt
Mid-Project Progress (Month 9)25%924,600.00Upon completion of Month 9 deliverables
Project Completion and Final Report25%924,600.00Within 15 business days of final acceptance
Post-Project Monitoring (12 months)5%184,920.00Upon completion of 12-month monitoring period
4. TERMS AND CONDITIONS
  1. This Quotation Estimate is valid for thirty (30) calendar days from the date of issue. After the expiry date, all prices and terms are subject to revision based on prevailing market conditions in Turkey Istanbul.
  2. All services shall be performed by a qualified and licensed Environmental Engineer or a team of environmental engineers under the direct supervision of the Lead Environmental Engineer designated by GreenSolutions Environmental Consulting Ltd.
  3. The client shall provide timely access to the project site in Turkey Istanbul, all necessary permits, and relevant project documentation within five (5) business days of a written request.
  4. Any change in scope, site conditions, or regulatory requirements in Turkey Istanbul that materially affects the work described in this Quotation Estimate shall be subject to a formal Change Order signed by both parties.
  5. All laboratory analyses shall be conducted by ISO 17025:2017 accredited laboratories operating within the Republic of Turkey. Results shall be reported in Turkish and English.
  6. The Environmental Engineer team shall comply with all occupational health and safety regulations (İş Sağlığı ve Güvenliği Kanunu No. 6331) while working on-site in Turkey Istanbul.
  7. Confidentiality: All data, reports, and findings generated under this Quotation Estimate shall remain the exclusive property of the client. GreenSolutions shall not disclose any project-specific information to third parties without written consent.
  8. Force Majeure: Neither party shall be liable for delays caused by events beyond reasonable control, including but not limited to natural disasters, government-imposed restrictions, or pandemics affecting operations in Turkey Istanbul.
  9. Disputes arising from this Quotation Estimate shall be resolved through arbitration in Istanbul, Turkey, in accordance with the rules of the Istanbul Arbitration Centre (ISTAC).
  10. This Quotation Estimate does not constitute a binding contract until a formal Service Agreement is executed by both parties. Upon acceptance, this document shall serve as the technical and commercial annex to the master contract.
5. ACCEPTANCE AND AUTHORIZATION

By signing below, the client acknowledges receipt of this Quotation Estimate and agrees to the scope, pricing, and terms outlined herein for the engagement of Environmental Engineer services in Turkey Istanbul.

For GreenSolutions Environmental Consulting Ltd.
Name: Dr. Ahmet Yılmaz, P.Eng.
Title: Lead Environmental Engineer / Managing Director
Date: _______________
For the Client
Name: ___________________________
Title: ___________________________
Date: _______________

GreenSolutions Environmental Consulting Ltd. | Levent, Istanbul, Turkey | VKN: 1234567890

This Quotation Estimate document is generated electronically and is valid without a physical stamp. | Page 1 of 1

⬇️ Download as DOCX Edit online as DOCX

Create your own Word template with our GoGPT AI prompt:

GoGPT
×
Advertisement
❤️Shop, book, or buy here — no cost, helps keep services free.