Quotation Estimate Petroleum Engineer in Egypt Cairo –Free Word Template Download with AI
12 Tahrir Square, Downtown, Egypt Cairo, 11514
Tel: +20 2 2577 8899 | Email: [email protected]
Commercial Registration No. 458210 | Tax ID: 552-881-334
Quotation EstimateQuotation Details
Quotation No.: QTE-2025-0472
Date of Issue: 14 June 2025
Valid Until: 14 July 2025 (30 days)
Currency: Egyptian Pound (EGP) / USD
Client Information
Prepared For: [Client Company Name]
Address: [Client Address], Egypt Cairo
Attn: [Contact Person], Project Director
Reference: [Client Project Ref. No.]
1. Scope of Services – Petroleum Engineer Assignment in Egypt CairoThis Quotation Estimate is issued by Nile Delta Petroleum Consulting Co. to provide the services of a qualified Petroleum Engineer for a period of twelve (12) months, commencing upon the client's written acceptance of this document. The Petroleum Engineer will be based in our Egypt Cairo office and will be deployed to the client's designated operational sites within the Greater Cairo region, including but not limited to the Nile Delta basin, the Western Desert concessions, and the offshore Mediterranean platforms as required by the project scope.
The Petroleum Engineer engaged under this Quotation Estimate shall hold a minimum of a Bachelor's degree in Petroleum Engineering from an accredited Egyptian or international university, with no fewer than eight (8) years of progressive experience in reservoir engineering, well planning, production optimization, and completion design. The candidate must be fluent in both Arabic and English and must possess a valid professional license issued by the Egyptian Engineers Syndicate, Cairo Branch.
2. Itemized Cost Breakdown| No. | Description of Service / Item | Quantity | Unit | Unit Price (EGP) | Total (EGP) |
|---|---|---|---|---|---|
| 1 | Monthly professional fee – Senior Petroleum Engineer (reservoir & production engineering) | 12 | Month | 85,000 | 1,020,000 |
| 2 | Monthly professional fee – Junior Petroleum Engineer (data analysis & reporting) | 12 | Month | 42,000 | 504,000 |
| 3 | Well completion design and optimization study (per well) | 6 | Well | 120,000 | 720,000 |
| 4 | Reservoir simulation and performance forecasting (per field) | 2 | Field | 350,000 | 700,000 |
| 5 | Monthly site supervision and operational support in Egypt Cairo area | 12 | Month | 28,000 | 336,000 |
| 6 | Technical report preparation and regulatory compliance documentation | 12 | Report | 15,000 | 180,000 |
| 7 | Emergency call-out and after-hours Petroleum Engineer availability (standby) | 12 | Month | 8,000 | 96,000 |
| 8 | Travel, accommodation, and per diem for field deployments outside Egypt Cairo | 12 | Month | 12,000 | 144,000 |
| 9 | Software licenses (Petrel, Eclipse, CMG) – annual subscription | 1 | Year | 180,000 | 180,000 |
| 10 | Project management, coordination, and quality assurance overhead | 1 | Lot | 250,000 | 250,000 |
| Subtotal | 4,130,000 | ||||
| VAT (14% – Egyptian Tax Authority) | 578,200 | ||||
| Grand Total (EGP) | 4,708,200 | ||||
| Grand Total (USD – approx. at EGP 48.50/USD) | 97,076.29 | ||||
Payment against this Quotation Estimate shall be made in accordance with the following schedule, all amounts due within thirty (30) days of invoice date:
| Milestone | Percentage | Amount (EGP) | Due Date |
|---|---|---|---|
| Advance payment upon contract signing | 20% | 941,640 | Within 7 days of acceptance |
| Quarterly progress payments (Q1–Q4) | 20% each | 941,640 / quarter | End of each quarter |
| Final payment upon project completion and handover | 20% | 941,640 | Within 15 days of final report |
4.1 This Quotation Estimate is valid for thirty (30) calendar days from the date of issue. Beyond this period, pricing may be subject to revision based on market conditions in Egypt Cairo and fluctuations in the EGP/USD exchange rate.
4.2 The Petroleum Engineer assigned under this engagement shall comply with all regulations set forth by the Egyptian General Petroleum Authority (EGPA) and the Egyptian Engineers Syndicate, Cairo Branch.
4.3 Any change in scope, additional wells, or extended field deployments beyond the quantities stated in this Quotation Estimate shall be subject to a supplementary quotation and written approval by both parties.
4.4 The client shall provide all necessary work permits, site access, and safety clearances required for the Petroleum Engineer to perform duties at operational locations in and around Egypt Cairo.
4.5 All intellectual property, technical reports, and reservoir models generated under this engagement shall become the sole property of the client upon full payment.
4.6 Disputes arising from this Quotation Estimate shall be resolved through arbitration in accordance with the rules of the Egyptian Arbitration Center, Cairo, under the jurisdiction of the Egyptian courts.
4.7 This Quotation Estimate does not constitute a binding contract until countersigned by both parties and accompanied by the advance payment.
By signing below, both parties acknowledge and agree to the terms, conditions, and pricing outlined in this Quotation Estimate for the Petroleum Engineer services to be rendered in Egypt Cairo.
For Nile Delta Petroleum Consulting Co.Name: Eng. Mahmoud El-Sayed
Title: Managing Director
Date: _______________ For the Client
Name: _________________________
Title: _________________________
Date: _______________ ⬇️ Download as DOCX Edit online as DOCX
Create your own Word template with our GoGPT AI prompt:
GoGPT