GoGPT GoSearch New DOC New XLS New PPT

OffiDocs favicon

Quotation Estimate Petroleum Engineer in Spain Valencia –Free Word Template Download with AI

Carrer de la Mar, 142, 46003 Valencia, Spain

Tel: +34 963 555 210 | Email: [email protected]

NIF: B-98765432 | Registered in the Commercial Registry of Valencia

Document Ref: QTE-2025-VAL-0047

Version: 1.0

Professional Services – Petroleum Engineer – Spain Valencia Region

Quotation Estimate No. QTE-2025-VAL-0047 Date of Issue 15 June 2025
Valid Until 15 September 2025 (90 days) Currency Euro (EUR)
Client Mediterranean Energy Resources S.A. Client Address Av. del Puerto, 88, 46022 Valencia, Spain
Project Location Offshore Platform Site – Valencia Coastal Zone, Spain Project Duration 12 months (estimated)

1. Purpose of This Quotation Estimate

This Quotation Estimate is issued by Iberia Petroleum Consulting S.L. to formally present the scope, schedule, and financial breakdown for the engagement of a senior Petroleum Engineer to support the client's subsurface evaluation and production optimisation programme in the Spain Valencia region. This document constitutes a binding commercial proposal upon written acceptance by the client and remains valid for the period stated above. All pricing is inclusive of applicable Spanish Value Added Tax (VAT – IVA 21%) unless otherwise noted.

2. Scope of Work – Petroleum Engineer Services

The Petroleum Engineer engaged under this Quotation Estimate shall deliver the following professional services tailored to the operational requirements of the Spain Valencia offshore and onshore assets:

  • Reservoir Characterisation and Modelling: Development and calibration of 3D numerical reservoir models for the target formations in the Valencia Basin, incorporating geological, geophysical, and petrophysical data.
  • Production Forecasting and Decline Analysis: Preparation of detailed production forecasts, water-oil ratio projections, and ultimate recovery estimates for existing and planned wells.
  • Well Performance Evaluation: Analysis of well test data, nodal analysis, and inflow performance relationships to identify bottlenecks and recommend optimisation measures.
  • Enhanced Oil Recovery (EOR) Feasibility: Preliminary assessment of waterflood efficiency, gas injection potential, and thermal recovery options specific to the reservoir conditions in the Spain Valencia area.
  • Regulatory Compliance Reporting: Preparation of technical documentation required by the Spanish Ministry for Ecological Transition and the Directorate General for Energy Policy, including annual reservoir performance reports.
  • Site Inspections and Field Support: A minimum of six (6) on-site visits per quarter to the Valencia coastal operations, including platform walkdowns, data acquisition, and coordination with the onshore operations team.
  • Monthly Technical Reporting: Submission of detailed monthly progress reports, KPI dashboards, and executive summaries to the client's technical management in Valencia.

3. Financial Breakdown

Ref Description of Service Duration / Qty Unit Rate (EUR) Amount (EUR)
01 Senior Petroleum Engineer – Monthly Professional Fee (includes all modelling, analysis, and reporting) 12 months €18,500.00 €222,000.00
02 Reservoir Modelling Software Licence (Petrel / Eclipse) – Annual Subscription 1 year €12,400.00 €12,400.00
03 On-Site Field Visits – Travel, Accommodation, and Per Diem (Valencia Coastal Zone) 24 visits €850.00 €20,400.00
04 Regulatory Filing and Compliance Documentation (Spanish Energy Authority) 4 filings €3,200.00 €12,800.00
05 EOR Feasibility Study – Dedicated Deliverable 1 study €28,000.00 €28,000.00
06 Emergency / After-Hours Technical Support (estimated 40 hours) 40 hours €185.00 €7,400.00
Subtotal (excl. VAT) €303,000.00
VAT – IVA 21% (Spain) €63,630.00
TOTAL AMOUNT DUE (incl. VAT) €366,630.00

4. Payment Schedule

This Quotation Estimate provides for the following payment milestones, all payable within thirty (30) calendar days of invoice receipt:

  • Milestone 1 – Mobilisation (30%): €109,989.00 – Due upon contract signature and commencement of the Petroleum Engineer's onboarding in Valencia.
  • Milestone 2 – Mid-Project (40%): €146,652.00 – Due upon delivery of the calibrated reservoir model and the first six-month technical report.
  • Milestone 3 – Completion (30%): €109,989.00 – Due upon final delivery of the EOR Feasibility Study, final regulatory filings, and the closing project report.

5. Terms and Conditions

5.1 This Quotation Estimate is valid for ninety (90) days from the date of issue. Any acceptance beyond this period requires written reconfirmation of pricing by Iberia Petroleum Consulting S.L.

5.2 The Petroleum Engineer assigned to this engagement shall hold a minimum of ten (10) years of professional experience in reservoir engineering and shall be registered with the Spanish Official College of Engineers (COIIM – Colegio Oficial de Ingenieros Industriales de Madrid) or the equivalent Valencian professional body.

5.3 All work performed under this Quotation Estimate shall comply with the Spanish Hydrocarbons Law (Ley 34/1998), the applicable regulations of the Directorate General for Energy Policy, and all environmental directives in force in the Spain Valencia region.

5.4 The client shall provide timely access to all subsurface data, well records, and operational information necessary for the Petroleum Engineer to perform the services described herein. Delays in data provision shall extend the project timeline proportionally without additional cost to the client.

5.5 Intellectual property generated specifically for the client under this engagement shall vest in the client upon full payment. General methodologies, templates, and pre-existing tools remain the property of Iberia Petroleum Consulting S.L.

5.6 Disputes arising from this Quotation Estimate or the resulting contract shall be resolved by the competent courts of Valencia, Spain, in accordance with Spanish civil and commercial law.

5.7 This Quotation Estimate does not constitute a guarantee of specific production outcomes. The Petroleum Engineer's deliverables are advisory and technical in nature and do not replace the client's operational decision-making authority.

6. Acceptance and Authorisation

By signing below, the client acknowledges receipt of this Quotation Estimate and authorises Iberia Petroleum Consulting S.L. to proceed with the engagement of the Petroleum Engineer for the services described in the Spain Valencia project scope.

For Iberia Petroleum Consulting S.L.

Authorised Signatory

Name: _________________________
Title: Director of Engineering
Date: _________________________

For Mediterranean Energy Resources S.A.

Client Authorised Representative

Name: _________________________
Title: _________________________
Date: _________________________
Important Notice: This Quotation Estimate (Ref. QTE-2025-VAL-0047) is a commercial document issued by Iberia Petroleum Consulting S.L. for the specific engagement of a Petroleum Engineer in the Spain Valencia region. It is not a contract until countersigned by both parties. All figures are in Euros (EUR) and include Spanish VAT at the standard rate of 21%. For queries regarding this estimate, please contact our Valencia office at +34 963 555 210 or [email protected].
⬇️ Download as DOCX Edit online as DOCX

Create your own Word template with our GoGPT AI prompt:

GoGPT
×
Advertisement
❤️Shop, book, or buy here — no cost, helps keep services free.