Resume Welder in Uganda Kampala – Free Word Template Download with AI
Name: John M. Otieno
Email: [email protected]
Phone: +256 774 567 890
Location: Kampala, Uganda
A highly skilled and dedicated Welder with over 10 years of hands-on experience in construction, manufacturing, and industrial projects across Uganda. Specializing in gas welding, TIG (Tungsten Inert Gas), MIG (Metal Inert Gas), and arc welding techniques. Proficient in interpreting technical drawings, ensuring safety standards, and delivering high-quality workmanship. Committed to contributing to infrastructure development in Uganda Kampala by providing reliable welding solutions tailored to local needs.
Senior Welder
Kampala Engineering Solutions, Kampala, Uganda | January 2018 – Present
- Oversee and execute welding projects for construction firms, including steel frame assembly, pipeline installation, and structural reinforcement.
- Collaborate with engineers and project managers to ensure adherence to safety protocols and client specifications in Uganda Kampala.
- Mentor junior welders on advanced techniques such as stainless steel welding and precision cutting for industrial applications.
- Conduct regular equipment maintenance checks to ensure optimal performance of welding tools, reducing downtime and improving efficiency.
- Successfully completed 50+ projects in Kampala, including the fabrication of bridges, scaffolding systems, and commercial building components.
Journeyman Welder
Metro Fabrication Works, Kampala, Uganda | June 2015 – December 2017
- Performed various welding tasks for automotive and industrial clients, focusing on durability and precision in urban environments like Kampala.
- Utilized advanced welding equipment to create custom metal structures for local businesses, enhancing their operational capabilities.
- Ensured compliance with Ugandan safety regulations and international standards (e.g., AWS D1.1) during all projects in Kampala.
- Participated in training programs to stay updated on the latest welding technologies and techniques applicable to Uganda’s growing infrastructure sector.
Apprentice Welder
Kampala Technical Institute, Kampala, Uganda | January 2012 – May 2015
- Gained foundational knowledge in welding processes, including oxy-acetylene cutting and arc welding under the supervision of certified instructors.
- Completed coursework in metallurgy, blueprint reading, and safety practices specific to Uganda’s industrial landscape.
- Participated in community projects, such as constructing metal fencing for schools in Kampala, to apply theoretical learning practically.
- Technical Skills: Gas welding, TIG welding, MIG welding, arc welding, plasma cutting, and metal fabrication.
- Tools & Equipment: Arc welders, TIG/MIG machines, oxy-fuel torches, and measuring instruments (e.g., calipers).
- Software: Basic CAD (Computer-Aided Design) for reading blueprints and specifications.
- Safety Standards: Proficient in OSHA guidelines and Ugandan occupational health regulations.
- Soft Skills: Teamwork, problem-solving, attention to detail, and adaptability in fast-paced environments across Kampala.
Diploma in Welding Technology
Kampala Technical Institute, Uganda | 2015
Completed a comprehensive curriculum covering welding theory, practical training, and safety protocols tailored to Uganda’s industrial demands.
Certification in Advanced Welding Techniques
East African Welding Association (EAWA), Kampala, Uganda | 2019
Earned certification for mastering specialized welding methods, including pipe welding and structural steel joining, recognized by employers in Uganda Kampala.
OHSAS 18001 Occupational Health and Safety Certification
Uganda Safety Training Institute | 2020
Qualified to implement and maintain safety standards in welding operations, ensuring a secure work environment for teams in Kampala.
Kampala Central Bus Station Revamp (2021)
Played a key role in fabricating and installing metal structures for the expansion of the central bus station, enhancing transportation infrastructure in Kampala.
Industrial Pipeline Installation (2019)
Executed precision welding for a water treatment facility’s pipeline system, ensuring leak-proof connections and compliance with Ugandan engineering standards.
Kampala Urban Development Project (2020)
Contributed to the construction of elevated walkways and steel frameworks, supporting Kampala’s efforts to improve urban mobility and safety.
Languages: English, Luganda
Availability: Full-time (flexible hours for urgent projects in Kampala)
References: Available upon request.
Create your own Word template with our GoGPT AI prompt:
GoGPT