Invoice Architect in South Korea Seoul –Free Word Template Download with AI
123 Teheran-ro, Gangnam-gu, Seoul, South Korea
Tel: +82-2-555-0199 | Email: [email protected]
Business Registration No. 123-45-67890
Professional Architectural Services
Bill To: Seoul Urban Development Corp.Attn: Mr. Kim Min-jun
456 Samseong-dong, Gangnam-gu
Seoul, South Korea
VAT ID: KR-987-65-43210
| Description of Architectural Services | Hours / Units | Rate (KRW) | Amount (KRW) |
|---|---|---|---|
|
Phase 1: Conceptual Design & Site Analysis Comprehensive site analysis conducted in Seoul, South Korea, including topographical surveys, zoning regulation review under the Seoul Special City Building Ordinance, and initial massing studies. Development of three distinct conceptual design options focusing on sustainable urban integration. |
120 | 150,000 | 18,000,000 |
|
Phase 2: Schematic Design Development Refinement of the selected concept for the Gangnam project. Creation of detailed floor plans, elevations, and 3D renderings. Coordination with structural and MEP consultants to ensure feasibility within the dense urban context of South Korea Seoul. Client presentation and incorporation of feedback. |
180 | 150,000 | 27,000,000 |
|
Phase 3: Design Documentation & Permitting Preparation of comprehensive construction documents required for the Seoul Metropolitan Government building permit application. This includes detailed architectural drawings, material specifications, and energy efficiency calculations compliant with Korean Green Building Certification standards. |
250 | 160,000 | 40,000,000 |
|
Phase 4: Construction Administration On-site supervision during the initial construction phase in Seoul. Review of shop drawings, submittals, and RFIs. Monthly site visits to ensure the Architect's design intent is maintained and construction adheres to the approved plans and South Korean building codes. |
80 | 170,000 | 13,600,000 |
|
Specialized Services: BIM Modeling Advanced Building Information Modeling (BIM) coordination to detect clashes and optimize building systems. Essential for complex high-rise projects in South Korea Seoul to ensure precision and reduce construction waste. |
60 | 180,000 | 10,800,000 |
Terms and Conditions
1. Payment Terms: Payment is due within 30 days of the invoice date. Late payments may incur a penalty interest rate of 1.5% per month as per standard commercial practices in South Korea.
2. Currency: All amounts are quoted in South Korean Won (KRW).
3. Scope of Work: This Invoice covers the architectural services rendered by Seoul Horizon Architects for the specified project located in Seoul, South Korea. Any additional services requested outside the original scope will be billed separately.
4. Regulatory Compliance: All designs and documentation provided by the Architect comply with the current Building Act of the Republic of Korea and local Seoul Metropolitan Government regulations.
5. Bank Details: Please remit payment to the following account:
Bank: Shinhan Bank
Branch: Gangnam Branch
Account Name: Seoul Horizon Architects Co., Ltd.
Account Number: 100-000-000000
6. Dispute Resolution: Any disputes arising from this Invoice or the associated services shall be resolved through arbitration in Seoul, South Korea, in accordance with the rules of the Korean Commercial Arbitration Board.
Seoul Horizon Architects Signature / Date ⬇️ Download as DOCX Edit online as DOCX
Create your own Word template with our GoGPT AI prompt:
GoGPT