GoGPT GoSearch New DOC New XLS New PPT

OffiDocs favicon

Invoice Architect in United Kingdom Manchester –Free Word Template Download with AI

Registered Office: 45 Deansgate, Manchester, M3 2BW, United Kingdom

Company No: 12345678 | VAT No: GB 999 888 777

Email: [email protected]

Tel: +44 (0)161 123 4567

Invoice No: INV-2023-10-042

Date: 24 October 2023

Due Date: 24 November 2023

Bill To

Mr. James Sterling

Sterling Residential Developments

12 Spinningfields Square

Manchester, M3 3JE

United Kingdom

Project Details

Project Name: The Spinningfields Loft Conversion & Extension

Site Address: 88 Portland Street, Manchester, M1 4GX, United Kingdom

Scope: RIBA Stage 3 (Developed Design) and Stage 4 (Technical Design) Architectural Services.

Description of Architectural Services Hours / Qty Rate (£) Amount (£)
Consultation and Site Analysis (Manchester Context)
Comprehensive site survey and analysis of the existing structure in Manchester. This includes assessing the impact of local planning policies specific to the City of Manchester Council, evaluating heritage constraints, and conducting a topographical survey to ensure the proposed extension aligns with the surrounding urban fabric.
12.0 150.00 1,800.00
Concept Design Development
Development of initial architectural concepts for the loft conversion. This phase involved creating 3D visualizations and preliminary floor plans to demonstrate spatial flow and aesthetic integration with the existing Victorian property. Meetings held at our Manchester office to review client feedback and refine the architectural vision.
20.0 150.00 3,000.00
Planning Application Drawings
Preparation of detailed architectural drawings required for submission to the local planning authority. This includes site location plans, block plans, existing and proposed floor plans, elevations, and sections. All drawings are formatted to meet the specific submission standards required for planning applications in the United Kingdom.
35.0 150.00 5,250.00
Building Regulations Compliance Strategy
Architectural assessment of the design against UK Building Regulations (Part A, Part B, Part L, etc.). This service ensures that the structural integrity, fire safety, and energy efficiency of the proposed Manchester extension meet current statutory requirements. Coordination with structural engineers and energy assessors included.
15.0 150.00 2,250.00
Technical Design and Construction Documentation
Production of full technical architectural drawings for construction. This includes detailed joinery schedules, window specifications, and material schedules tailored to the Manchester climate. These documents serve as the primary instruction set for the main contractor to execute the build accurately.
45.0 150.00 6,750.00
Client Liaison and Site Visits
Time spent attending site meetings in Manchester to discuss progress with the contractor and resolve on-site queries. This ensures the architectural intent is maintained throughout the construction phase and that any unforeseen issues are addressed promptly in accordance with the design specifications.
8.0 150.00 1,200.00
Subtotal £20,250.00 VAT (20%) £4,050.00 TOTAL DUE £24,300.00 Payment Instructions

Please make payment within 30 days of the invoice date. Late payments may incur interest charges in accordance with the Late Payment of Commercial Debts (Interest) Act 1998.

Bank Transfer Details:

Bank Name: HSBC UK Bank plc

Account Name: Manchester Urban Architects Ltd.

Sort Code: 40-05-18

Account Number: 12345678

IBAN: GB29 HSBK 4005 1812 3456 78

Reference: INV-2023-10-042

Terms and Conditions

1. Professional Services: The services provided by Manchester Urban Architects Ltd. are professional in nature. We do not guarantee that planning permission or building regulations approval will be granted, as these are at the discretion of the relevant authorities in the United Kingdom.

2. Intellectual Property: All architectural drawings, designs, and specifications remain the intellectual property of Manchester Urban Architects Ltd. until full payment of this invoice has been received.

3. Changes to Scope: Any significant changes to the project scope requested by the client after the commencement of work may result in additional charges, which will be invoiced separately.

4. Dispute Resolution: Any disputes arising from this invoice shall be subject to the jurisdiction of the courts of England and Wales.

5. Thank You: We appreciate your business and look forward to continuing our collaboration on this exciting Manchester development project.

⬇️ Download as DOCX Edit online as DOCX

Create your own Word template with our GoGPT AI prompt:

GoGPT
×
Advertisement
❤️Shop, book, or buy here — no cost, helps keep services free.