GoGPT GoSearch New DOC New XLS New PPT

OffiDocs favicon

Invoice Civil Engineer in Bangladesh Dhaka –Free Word Template Download with AI

Professional Civil Engineering Services

House #45, Road #12, Dhanmondi R/A

Dhaka-1205, Bangladesh

Tel: +880 2 9123456 | Email: [email protected]

TIN: 123456789012 | BIN: 123456789012

Date: October 24, 2023

Due Date: November 07, 2023

Bill To:

Green Valley Developers Ltd.

Attn: Mr. Rafiqul Islam (Project Director)

Level 14, Bashundhara City Tower A

Plot #12, Block #A, Bashundhara R/A

Dhaka-1229, Bangladesh

Project Details:

Project Name: High-Rise Residential Complex Phase II

Location: Gulshan-2, Dhaka, Bangladesh

Invoice Number: INV-2023-10-089

Reference: Contract Agreement #DHK-CE-2023-04

This invoice represents professional fees for Civil Engineering consultancy, structural design, and site supervision services rendered in Dhaka, Bangladesh, during the period of September 1, 2023, to September 30, 2023.

# Description of Civil Engineering Services Hours / Units Rate (BDT) Amount (BDT)
1 Structural Analysis & Design: Detailed load analysis and structural design for the 20-story residential tower using ETABS and SAFE software. Includes foundation design suitable for the soil conditions of Dhaka. 120 Hrs 2,500 300,000.00
2 Site Supervision & Quality Control: On-site supervision by senior Civil Engineers to ensure compliance with Bangladesh National Building Code (BNBC) 2020 standards during the piling and footing construction phase. 30 Days 8,000 240,000.00
3 Soil Investigation Report Review: Technical review of geotechnical data provided by third-party labs to determine safe bearing capacity and pile depth requirements for the Gulshan site. 1 Lot 45,000 45,000.00
4 Construction Drawings & BOQ: Preparation of detailed structural drawings, reinforcement detailing, and Bill of Quantities (BOQ) for the main building and parking structure. 1 Lot 150,000 150,000.00
5 Regulatory Consultation: Assistance with documentation and technical submissions required by the Dhaka North City Corporation (DNCC) for building plan approval. 15 Hrs 2,000 30,000.00
6 Material Testing Coordination: Coordination and witnessing of concrete cube tests and steel tensile tests at the site laboratory to ensure material quality standards. 10 Tests 1,500 15,000.00
Subtotal: 780,000.00 BDT VAT (5%): 39,000.00 BDT Advance Payment Deducted: (100,000.00) BDT Total Due: 719,000.00 BDT

Terms and Conditions:

  • Payment Method: Please make payment via Bank Transfer to Dhaka Bank PLC, Branch: Dhanmondi, Account Name: Dhaka Structural Solutions Ltd., Account No: 1234-5678-9012.
  • Due Date: Payment is due within 14 days of the invoice date. Late payments may incur a penalty of 2% per month.
  • Scope: This invoice covers only the professional engineering services. It does not include costs for construction materials, labor, or third-party testing fees unless specified.
  • Validity: This invoice is valid for the project located in Dhaka, Bangladesh, as per the signed contract agreement.
  • Disputes: Any discrepancies regarding this invoice must be reported within 7 days of receipt.

Authorized by:

Engr. Kamal Hossain
Chief Civil Engineer
Dhaka Structural Solutions Ltd.

Received by:

______________________
Name & Signature
Green Valley Developers Ltd.

Thank you for choosing Dhaka Structural Solutions Ltd. for your Civil Engineering needs in Bangladesh.

This is a computer-generated invoice and does not require a physical stamp.

⬇️ Download as DOCX Edit online as DOCX

Create your own Word template with our GoGPT AI prompt:

GoGPT
×
Advertisement
❤️Shop, book, or buy here — no cost, helps keep services free.