Invoice Civil Engineer in Myanmar Yangon –Free Word Template Download with AI
Professional Civil Engineering Services
No. 124, Pyay Road, Kamayut Township
Yangon, Myanmar
Tax Registration No: 0123456789
Email: [email protected] | Phone: +95 9 123 456 789
Date: October 24, 2023
Due Date: November 24, 2023
Bill To:
Golden Land Development Corp.
Attn: Mr. Aung Kyaw (Project Director)
Plot 45, New Yangon Township
Shwe Pyi Thar, Yangon, Myanmar
| # | Description of Civil Engineering Services | Quantity / Hours | Unit Rate (MMK) | Total Amount (MMK) |
|---|---|---|---|---|
| 1 |
Geotechnical Site Investigation & Soil Analysis Comprehensive soil sampling and laboratory testing conducted at the Insein site to determine bearing capacity and foundation requirements. Includes preparation of the Geotechnical Report compliant with Myanmar Building Code standards. |
1 Lot | 1,500,000 | 1,500,000 |
| 2 |
Structural Design & Load Calculations Detailed structural engineering design for the 15-story residential tower. Includes seismic load analysis specific to the Yangon region, wind load calculations, and reinforcement detailing for concrete structures. |
120 Hrs | 25,000 | 3,000,000 |
| 3 |
Foundation Engineering & Piling Design Design of deep foundation systems (bored piles) suitable for the local soil conditions in Yangon. Includes calculation of pile capacity, layout optimization, and specification of concrete grades and reinforcement ratios. |
1 Lot | 2,200,000 | 2,200,000 |
| 4 |
Construction Supervision & Quality Assurance On-site supervision by senior Civil Engineers during the foundation pouring phase. Includes daily site logs, concrete slump tests, rebar inspection, and verification of construction against approved structural drawings. |
22 Days | 80,000 | 1,760,000 |
| 5 |
Drainage & Stormwater Management Plan Design of the site drainage system to manage monsoon rainfall typical of Yangon. Includes calculation of runoff coefficients, sizing of storm drains, and integration with the municipal sewerage system. |
1 Lot | 950,000 | 950,000 |
| 6 |
Regulatory Compliance & Permitting Support Preparation of technical documentation required for submission to the Yangon City Development Committee (YCDC). Includes structural safety certificates and engineering affidavits. |
1 Lot | 600,000 | 600,000 |
Payment Terms & Conditions:
1. Payment is due within 30 days of the invoice date. Late payments may incur a penalty interest of 2% per month.
2. Please make payments via bank transfer to the following account:
Bank: KBZ Bank
Account Name: Yangon Structural Solutions Ltd.
Account Number: 0123-4567-8901-2345
SWIFT Code: KBZBMMKY
3. All services provided are subject to the professional standards of the Institution of Engineers (Myanmar).
4. This Invoice serves as a formal request for payment for Civil Engineering consultancy and supervision services rendered in Yangon, Myanmar.
Authorized Signature
U. Min Thu
Chief Civil Engineer
Yangon Structural Solutions Ltd.
Received By (Client)
__________________________
Date: ____________________
⬇️ Download as DOCX Edit online as DOCXCreate your own Word template with our GoGPT AI prompt:
GoGPT