GoGPT GoSearch New DOC New XLS New PPT

OffiDocs favicon

Invoice Civil Engineer in Pakistan Islamabad –Free Word Template Download with AI

Registered Office: F-7/2, Markaz, Islamabad, Pakistan

Phone: +92 51 1234567 | Mobile: +92 300 9876543

Email: [email protected]

NTN: 1234567-8 | STN: ISB-987654321

PEC Registration: 123456 (Professional Engineering Council)

Invoice No: INV-2023-089

Date: October 24, 2023

Due Date: November 24, 2023

Project Ref: ISB-HIGHWAY-EXP-2023

Bill To:

Islamabad Development Authority (IDA)

Engineering Department, Sector G-9/4

Islamabad, Pakistan

Attn: Mr. Ahmed Khan, Chief Engineer

Project Site: New Expressway Extension, Islamabad Capital Territory

This invoice represents professional services rendered by a licensed Civil Engineer in accordance with the standards set by the Pakistan Engineering Council (PEC) and the specific requirements of the Islamabad Capital Territory development projects. The following services include structural analysis, site supervision, and material testing for the ongoing infrastructure development in Islamabad.

# Description of Civil Engineering Services Quantity / Hours Rate (PKR) Amount (PKR)
1 Structural Design & Analysis: Detailed structural design for the new flyover interchange in Islamabad. Includes load calculations, seismic analysis compliant with Pakistan Building Code (PBC-2018), and reinforcement detailing for concrete structures. 1 Lot 450,000 450,000
2 Site Supervision & Inspection: On-site supervision of civil works at the Islamabad Expressway project. Monitoring of excavation, foundation laying, and concrete pouring to ensure adherence to technical specifications and safety standards. 160 Hours 2,500 400,000
3 Geotechnical Investigation Report: Review and analysis of soil testing data for the Islamabad sector. Recommendations for foundation types based on soil bearing capacity and groundwater levels specific to the Islamabad region. 1 Report 120,000 120,000
4 Quantity Surveying & Estimation: Preparation of detailed Bill of Quantities (BOQ) for the upcoming phase of the Islamabad housing scheme. Includes estimation of concrete, steel, and labor costs based on current market rates in Pakistan. 1 Lot 85,000 85,000
5 Drainage System Design: Design of stormwater drainage systems for the new Islamabad commercial zone. Ensuring compliance with environmental regulations and flood mitigation strategies required for the region. 1 Lot 150,000 150,000
Subtotal: PKR 1,205,000.00 Withholding Tax (1.5% as per FBR rules): PKR (18,075.00) Professional Tax (Islamabad): PKR (6,025.00) Grand Total: PKR 1,180,900.00

Payment Information:

Bank Name: Habib Bank Limited (HBL)

Branch: Blue Area, Islamabad

Account Title: Apex Civil Engineering Solutions

Account Number: 0123-4567890123-45

IBAN: PK36HABB0012345678901234

SWIFT Code: HABBPKKA

Please quote the Invoice Number INV-2023-089 in the payment remarks.

Terms and Conditions:

  1. Payment is due within 30 days of the invoice date.
  2. Late payments will incur a penalty of 2% per month on the outstanding amount.
  3. All services are provided in accordance with the Pakistan Engineering Council (PEC) code of ethics and professional conduct.
  4. This invoice is subject to the jurisdiction of the courts in Islamabad, Pakistan.
  5. Withholding tax has been deducted as per the Federal Board of Revenue (FBR) regulations applicable to professional services in Pakistan.
  6. Any disputes regarding the quality of civil engineering services must be raised within 14 days of project completion.
  7. This document serves as an official record of financial transaction for the civil engineering services rendered in Islamabad.

Authorized Signature

Eng. Muhammad Ali

Senior Civil Engineer

Apex Civil Engineering Solutions

Received By

__________________________

Name & Designation

Date

⬇️ Download as DOCX Edit online as DOCX

Create your own Word template with our GoGPT AI prompt:

GoGPT
×
Advertisement
❤️Shop, book, or buy here — no cost, helps keep services free.