Invoice Electrical Engineer in France Lyon –Free Word Template Download with AI
Lead Electrical Engineer: Jean-Pierre Dubois, Ingénieur Conseil
15 Rue de la République, 69002 Lyon, France
Tel: +33 4 72 00 00 00 | Email: [email protected]
SIRET: 123 456 789 00012 | TVA Intracommunautaire: FR 12 123456789
Invoice Number: INV-2023-LY-089
Date of Issue: October 24, 2023
Due Date: November 24, 2023
Payment Terms: Net 30 Days
Bill To
Client Name: Rhône-Alpes Industrial Development Group
Attn: Procurement Department
45 Avenue Jean Jaurès
69007 Lyon, France
SIRET: 987 654 321 00056
Project Reference
Project Name: Smart Grid Integration & Automation Upgrade
Location: Lyon Confluence Business Park, France
Scope: High-voltage distribution analysis, PLC programming, and safety compliance audit for industrial facility expansion.
| # | Description of Electrical Engineering Services | Hours / Qty | Rate (EUR) | Amount (EUR) |
|---|---|---|---|---|
| 1 | Site Survey and Load Analysis: Comprehensive on-site assessment of existing electrical infrastructure at the Lyon facility. Included calculation of peak load requirements, harmonic distortion analysis, and verification of compliance with NF C 15-100 standards. | 12.0 | 180.00 | 2,160.00 |
| 2 | Schematic Design and CAD Drafting: Creation of detailed single-line diagrams, wiring schematics, and panel layouts using AutoCAD Electrical. Design optimized for energy efficiency and future scalability within the French regulatory framework. | 24.0 | 180.00 | 4,320.00 |
| 3 | PLC Programming and HMI Configuration: Development of control logic for Siemens S7-1500 PLCs. Configuration of Human-Machine Interface (HMI) screens for real-time monitoring of production lines. Integration with existing SCADA systems. | 40.0 | 200.00 | 8,000.00 |
| 4 | Protection Coordination Study: Analysis of protective device settings to ensure selective coordination. Prevention of nuisance tripping and minimization of downtime. Report generated in accordance with IEC 60909 standards. | 16.0 | 190.00 | 3,040.00 |
| 5 | Commissioning and Testing Support: On-site supervision during the installation phase. Verification of insulation resistance, continuity testing, and functional testing of all automated systems. Final handover documentation provided. | 20.0 | 175.00 | 3,500.00 |
| 6 | Regulatory Compliance Audit: Detailed review of the installation against French electrical safety regulations (Code du Travail) and European Low Voltage Directive. Preparation of the mandatory "Consuel" style inspection report for local authorities. | 8.0 | 185.00 | 1,480.00 |
| Subtotal (HT) | 22,500.00 EUR |
| VAT (TVA) @ 20% | 4,500.00 EUR |
| Total Due (TTC) | 27,000.00 EUR |
Payment Instructions
Please make payment via bank transfer (Virement Bancaire) to the following account:
Bank: Crédit Lyonnais, Lyon Part-Dieu Branch
IBAN: FR76 3000 4000 0000 0000 0000 123
BIC/SWIFT: CRLYFRPP
Reference: Please quote Invoice Number INV-2023-LY-089
Terms and Conditions
1. This invoice is issued in accordance with the French Commercial Code. Payment is due within 30 days of the invoice date unless otherwise agreed in writing.
2. Late payments will incur interest at the rate prescribed by Article L.441-6 of the French Commercial Code, plus a fixed indemnity of 40 euros for recovery costs.
3. All services provided by our Electrical Engineer are guaranteed to meet the specifications outlined in the project proposal and comply with current IEC and NF standards applicable in France.
4. Intellectual property rights for all designs, schematics, and code developed remain with Lyon Electrical Engineering Solutions until full payment is received.
5. Any disputes arising from this contract shall be subject to the jurisdiction of the Tribunal de Commerce de Lyon.
Authorized Signature (Provider)
Jean-Pierre Dubois
Lead Electrical Engineer
Accepted By (Client)
__________________________
Date: ______________________
⬇️ Download as DOCX Edit online as DOCXCreate your own Word template with our GoGPT AI prompt:
GoGPT