GoGPT GoSearch New DOC New XLS New PPT

OffiDocs favicon

Invoice Electrical Engineer in Myanmar Yangon –Free Word Template Download with AI

Lead Electrical Engineer: U Aung Kyaw (B.Sc. Electrical Engineering)

123 Bogyoke Aung San Road, Kamayut Township

Yangon, Myanmar

Tax Registration No: 01-23456789

Email: [email protected]

Phone: +95 9 123 456 789

Professional Services

Bill To:

Myanmar Industrial Development Corp.

Attn: Procurement Department

45 Industrial Zone Road, Hlaing Tharyar Township

Yangon, Myanmar

Invoice Details:

Invoice Number: YPS-INV-2023-089

Date of Issue: October 24, 2023

Due Date: November 24, 2023

Project Reference: High-Voltage Grid Upgrade - Phase II

Description of Engineering Services Rendered

This Invoice represents the professional fees charged by the Lead Electrical Engineer for the design, consultation, and oversight of electrical infrastructure projects located within the Yangon metropolitan area. All calculations adhere to the Myanmar Electrical Code (MEC) and international safety standards.

# Description of Service Quantity / Hours Unit Rate (MMK) Total (MMK)
1 High-Voltage System Design & Load Analysis
Comprehensive load flow analysis and short-circuit calculation for the new substation in Yangon. Includes single-line diagram creation and transformer sizing specifications.
40 Hours 150,000 6,000,000
2 Electrical Safety Audit & Compliance Inspection
On-site inspection of existing wiring and grounding systems to ensure compliance with Myanmar Yangon municipal electrical regulations. Detailed hazard report provided.
1 Project 2,500,000 2,500,000
3 PLC Programming & Automation Control
Configuration of Programmable Logic Controllers for the automated manufacturing line. Includes ladder logic programming and HMI interface design.
60 Hours 175,000 10,500,000
4 Project Management & Site Supervision
Oversight of electrical installation teams in Yangon. Coordination with civil engineers and procurement of electrical components.
20 Days 300,000 6,000,000
5 Technical Documentation & As-Built Drawings
Preparation of final electrical schematics and maintenance manuals for the client's engineering archive.
1 Lot 1,500,000 1,500,000
Subtotal: 26,500,000 MMK VAT (5%): 1,325,000 MMK Total Amount Due: 27,825,000 MMK

Amount in words: Twenty-Seven Million, Eight Hundred Twenty-Five Thousand Myanmar Kyats only.

Terms and Conditions

  1. Payment Method: Payment is to be made via bank transfer to KBZ Bank, Account Name: Yangon Power Solutions, Account No: 0123-4567-8901.
  2. Due Date: Payment is due within 30 days of the Invoice date. Late payments may incur a penalty of 2% per month.
  3. Scope of Work: This Invoice covers the professional services of the Electrical Engineer as detailed above. It does not include the cost of raw materials or hardware unless explicitly stated.
  4. Liability: Yangon Power Solutions guarantees the accuracy of the engineering calculations and designs provided. Liability is limited to the value of the professional fees paid.
  5. Dispute Resolution: Any disputes arising from this Invoice shall be settled under the laws of the Republic of the Union of Myanmar.

Authorized Signature

U Aung Kyaw

Lead Electrical Engineer

Received By (Client)

Date: _______________

Signature: _______________

Thank you for your business. Yangon Power Solutions is committed to providing top-tier electrical engineering excellence in Myanmar.

This is a computer-generated Invoice and does not require a physical stamp to be valid.

⬇️ Download as DOCX Edit online as DOCX

Create your own Word template with our GoGPT AI prompt:

GoGPT
×
Advertisement
❤️Shop, book, or buy here — no cost, helps keep services free.