GoGPT GoSearch New DOC New XLS New PPT

OffiDocs favicon

Invoice Electrical Engineer in Philippines Manila –Free Word Template Download with AI

Professional Electrical Engineering Services

Unit 402, Ayala Tower One, Makati Avenue

Makati City, Metro Manila, Philippines 1226

Tel: +63 (2) 8888-9999 | Email: [email protected]

TIN: 123-456-789-000 | BIR Certificate of Registration No. 000-000-000-000

Invoice #: INV-2023-10-045

Date: October 24, 2023

Due Date: November 24, 2023

Project Ref: MNL-HV-UPGRADE-2023

Bill To:

Green Archipelago Development Corp.

Attn: Mr. Juan Dela Cruz, Chief Operations Officer

10th Floor, Ortigas Center Tower, Ortigas Avenue

Pasig City, Metro Manila, Philippines 1605

TIN: 987-654-321-000

This document serves as the official Invoice for professional services rendered by a licensed Electrical Engineer in the Philippines Manila region. The services detailed below were executed in strict accordance with the Philippine Electrical Code (PEC), the National Building Code of the Philippines, and the standards set forth by the Professional Regulation Commission (PRC).

Description of Services Hours / Qty Rate (PHP) Amount (PHP)
Site Inspection & Load Analysis
Comprehensive assessment of existing electrical infrastructure at the client's facility in Manila. This includes verifying compliance with local Manila Electric Company (Meralco) requirements and calculating peak load demands.
12 Hrs 2,500.00 30,000.00
Electrical System Design & Schematics
Preparation of detailed single-line diagrams, wiring layouts, and panel schedules. The design ensures redundancy and safety for high-voltage applications typical in Metro Manila commercial zones.
40 Hrs 3,000.00 120,000.00
Permitting & Regulatory Compliance
Filing of electrical plans with the Local Government Unit (LGU) of Manila and coordination with the Bureau of Fire Protection (BFP) for electrical safety clearance.
1 Lot 25,000.00 25,000.00
Project Supervision & Quality Assurance
On-site supervision of electrical installation to ensure adherence to the engineered plans. Includes weekly progress reports and safety audits.
20 Hrs 2,800.00 56,000.00
Final Testing & Commissioning
Execution of insulation resistance tests, continuity checks, and load testing. Issuance of the Certificate of Completion required for Meralco connection.
16 Hrs 3,200.00 51,200.00
Subtotal: 282,200.00 PHP VAT (12%): 33,864.00 PHP Total Due: 316,064.00 PHP

Payment Terms & Conditions

Payment is due within 30 days from the date of this Invoice. Please make checks payable to "Manila Power Systems Engineering" or utilize bank transfer to the following account:

Bank: BDO Unibank
Branch: Manila Central Branch
Account Name: Manila Power Systems Engineering Inc.
Account No: 1234-5678-9012

Late payments will incur a penalty interest of 1.5% per month on the outstanding balance. This Invoice is valid for tax purposes in the Philippines and complies with Bureau of Internal Revenue (BIR) regulations.

Technical Notes

The services provided by this Electrical Engineer are critical for the safety and efficiency of the facility. All designs have been optimized for the specific environmental conditions of Manila, including humidity and voltage fluctuations. The client acknowledges that the electrical system has been designed to meet the current Philippine National Standards (PNS).

Issued By:

Engr. Maria Santos, R.E.E.

Principal Electrical Engineer

PRC License No. 123456

Received By:

__________________________

Name & Signature

Date Received

⬇️ Download as DOCX Edit online as DOCX

Create your own Word template with our GoGPT AI prompt:

GoGPT
×
Advertisement
❤️Shop, book, or buy here — no cost, helps keep services free.