GoGPT GoSearch New DOC New XLS New PPT

OffiDocs favicon

Invoice Electrical Engineer in South Korea Seoul –Free Word Template Download with AI

Address: 123 Gangnam-daero, Gangnam-gu, Seoul, South Korea

Phone: +82-2-1234-5678

Email: [email protected]

Business Registration No: 123-45-67890

VAT Registration No: 123-45-67890

Invoice Number: INV-2023-SE-0098

Date of Issue: October 24, 2023

Due Date: November 24, 2023

Bill To:

Client Name: Han River Commercial Complex Development

Attn: Mr. Kim Min-jun, Project Director

Address: 45 Yeouido-saenggeun-ro, Yeongdeungpo-gu, Seoul, South Korea

Email: [email protected]

Project Location:

Site: New Tower Construction Site B

Location: Mapo-gu, Seoul, South Korea

Reference: Electrical Infrastructure Upgrade Phase 2

Subject: Professional Services Rendered by Licensed Electrical Engineer

This Invoice details the comprehensive engineering services provided by our senior Electrical Engineer team for the specified project located in South Korea Seoul. The services encompass high-voltage system design, safety compliance auditing according to Korean Electrical Safety Act, and on-site supervision of installation works.

# Description of Services Hours / Qty Rate (KRW) Amount (KRW)
1 Electrical System Design & Load Analysis
Detailed schematic design for the main distribution board and sub-panels. Load flow analysis conducted to ensure stability for the commercial complex in Seoul.
40 150,000 6,000,000
2 Regulatory Compliance Audit (Korean Standards)
Review of existing plans against the Korean Electrical Wiring Standards (KEWS) and local Seoul Metropolitan Government regulations.
15 180,000 2,700,000
3 On-Site Supervision & Inspection
Physical inspection of cabling, grounding systems, and switchgear installation at the Mapo-gu site by a certified Electrical Engineer.
20 160,000 3,200,000
4 Technical Documentation & Reporting
Preparation of final technical reports, as-built drawings, and safety certification documents required for occupancy permits in South Korea Seoul.
10 140,000 1,400,000
5 Emergency Power System Consultation
Design review of the Uninterruptible Power Supply (UPS) and generator integration for critical infrastructure.
5 200,000 1,000,000
Subtotal: 14,300,000 KRW VAT (10%): 1,430,000 KRW Discount (Early Payment): 0 KRW TOTAL DUE: 15,730,000 KRW

Payment Instructions:

Please remit payment within 30 days of the invoice date. Late payments may incur a penalty interest rate of 1.5% per month as per standard commercial practices in South Korea.

Bank Transfer Details:

  • Bank Name: Shinhan Bank
  • Branch: Gangnam Branch, Seoul
  • Account Name: Seoul Power Systems & Engineering Co., Ltd.
  • Account Number: 100-000-000000
  • SWIFT Code: SHBKKRSE

Terms and Conditions:

  1. All services provided by the Electrical Engineer are subject to the professional standards and ethics mandated by the Korean Society of Electrical Engineers.
  2. This Invoice is valid for payment processing only upon receipt of the signed service completion certificate.
  3. Any disputes regarding the services rendered in South Korea Seoul shall be settled under the jurisdiction of the Seoul Central District Court.
  4. Prices are quoted in Korean Won (KRW) and are inclusive of all applicable local taxes unless otherwise stated.
  5. Intellectual property rights for all designs and schematics remain with Seoul Power Systems until full payment is received.

Authorized Signature (Provider)

Seoul Power Systems & Engineering Co., Ltd.

Chief Electrical Engineer

Received By (Client)

Han River Commercial Complex Development

Date of Receipt:

⬇️ Download as DOCX Edit online as DOCX

Create your own Word template with our GoGPT AI prompt:

GoGPT
×
Advertisement
❤️Shop, book, or buy here — no cost, helps keep services free.