GoGPT GoSearch New DOC New XLS New PPT

OffiDocs favicon

Invoice Environmental Engineer in Myanmar Yangon –Free Word Template Download with AI

Specialized Environmental Engineering Firm

123 Bogyoke Aung San Road, Kamaryut Township

Yangon, Myanmar

Tax Registration No: 01-23456789

Email: [email protected] | Phone: +95 1 234 5678

Official Tax Invoice

Bill To:

Yangon Industrial Development Corp.

Attn: Procurement Department

45 Industrial Zone Road, Hlaing Tharyar Township

Yangon, Myanmar

Invoice Details:

Invoice Number: INV-2023-ENV-089

Date of Issue: October 24, 2023

Due Date: November 24, 2023

Project Reference: EIA-YGN-2023-04

Project Scope Overview

This invoice pertains to the comprehensive environmental engineering consultancy services rendered by Green Horizon Environmental Solutions for the proposed industrial expansion project located in Yangon, Myanmar. As a certified Environmental Engineer firm operating under the regulations of the Environmental Conservation Department (ECD) of Myanmar, we have conducted rigorous assessments to ensure compliance with the Environmental Policy of Myanmar and the Environmental Conservation Law (2012).

The services detailed below include the preparation of the Environmental Impact Assessment (EIA), baseline data collection regarding air quality and water resources in the Yangon region, and the formulation of an Environmental Management Plan (EMP). Our team of Environmental Engineers has worked diligently to mitigate potential ecological risks associated with the construction phase, ensuring sustainable development practices are upheld within the Yangon metropolitan area.

# Description of Environmental Engineering Services Quantity / Hours Unit Price (MMK) Total (MMK)
1 Phase I: Environmental Site Assessment & Baseline Study
Comprehensive field survey conducted by senior Environmental Engineers in Yangon. Includes soil sampling, groundwater analysis, and ambient noise level monitoring to establish baseline environmental conditions prior to construction.
1 Lot 4,500,000 4,500,000
2 Phase II: Environmental Impact Assessment (EIA) Report Preparation
Drafting of the full EIA report in accordance with Myanmar ECD guidelines. Analysis of potential impacts on local biodiversity, air quality, and community health in the Yangon region. Includes stakeholder consultation summaries.
1 Report 8,200,000 8,200,000
3 Phase III: Environmental Management Plan (EMP) Development
Creation of a strategic EMP to mitigate identified risks. Includes protocols for waste management, stormwater drainage design, and dust control measures specific to the Yangon climate and urban density.
1 Plan 5,500,000 5,500,000
4 Phase IV: Regulatory Submission & Liaison Services
Assistance with the submission of documents to the Yangon City Development Committee (YCDC) and the Environmental Conservation Department. Includes representation during technical review meetings.
40 Hours 150,000 6,000,000
5 Phase V: Laboratory Analysis Fees
Third-party accredited laboratory costs for chemical analysis of soil and water samples collected in Yangon. Includes heavy metal testing and biological oxygen demand (BOD) analysis.
15 Samples 120,000 1,800,000
Subtotal: 26,000,000 MMK VAT (5%): 1,300,000 MMK Stamp Duty: 50,000 MMK TOTAL AMOUNT DUE: 27,350,000 MMK

Amount in words: Twenty-Seven Million Three Hundred Fifty Thousand Myanmar Kyats only.

Payment Terms and Conditions

  • Payment Method: Bank Transfer to KBZ Bank (Kyaing Bank) or AYA Bank.
  • Bank Name: KBZ Bank
  • Account Name: Green Horizon Environmental Solutions Co., Ltd.
  • Account Number: 0123-4567-8901-2345
  • Branch: Yangon Central Branch
  • Due Date: Payment is due within 30 days from the date of this Invoice.
  • Late Fees: A late fee of 2% per month will be applied to overdue balances.
  • Disputes: Any discrepancies regarding this Invoice must be reported in writing within 7 days of receipt.

Legal Notice: This Invoice serves as an official record of the Environmental Engineering services provided. All work has been conducted in strict adherence to the professional standards expected of an Environmental Engineer in Myanmar. The client acknowledges receipt of the EIA and EMP documents referenced herein.

Authorized Signature

Dr. Aung Kyaw Min
Lead Environmental Engineer
Green Horizon Environmental Solutions

Thank you for choosing Green Horizon Environmental Solutions for your sustainability needs in Yangon, Myanmar.

Registered Office: 123 Bogyoke Aung San Road, Yangon, Myanmar | Email: [email protected]

© 2023 Green Horizon Environmental Solutions. All Rights Reserved.

⬇️ Download as DOCX Edit online as DOCX

Create your own Word template with our GoGPT AI prompt:

GoGPT
×
Advertisement
❤️Shop, book, or buy here — no cost, helps keep services free.