Invoice Marine Engineer in Pakistan Karachi –Free Word Template Download with AI
Specialized Marine Engineering Services
Office #402, Sea View Plaza, Clifton Block 5
Off Sea View Drive, Karachi, Sindh, Pakistan
Tax Registration Number (TRN): 1234567-8
Email: [email protected] | Phone: +92-21-3587-XXXX
Invoice Number: IME-2023-089
Date of Issue: October 24, 2023
Due Date: November 24, 2023
Service Location: Karachi Port Trust (KPT)
Bill To:Global Shipping Logistics (Pvt) Ltd.
Head Office, Port Qasim Industrial Area
Plot 45-A, Karachi, Sindh, Pakistan
Attn: Mr. Ahmed Khan, Fleet Manager
Phone: +92-21-3456-XXXX
Pay From:Indus Marine Engineering Solutions
Account Name: Indus Marine Engineering Solutions
Bank: Meezan Bank Limited
Branch: Clifton Branch, Karachi
Account Type: Current Account
Description of Marine Engineering Services RenderedThe following invoice details the professional services provided by our certified Marine Engineers regarding the maintenance, inspection, and repair of the vessel "MV Ocean Star" docked at Karachi Port. All work was conducted in accordance with the International Maritime Organization (IMO) standards and local regulations enforced by the Pakistan Maritime Security Agency (PMSA).
| # | Description of Service | Hours / Qty | Rate (PKR) | Amount (PKR) |
|---|---|---|---|---|
| 1 | Comprehensive Engine Room Inspection: Detailed diagnostic assessment of the main propulsion diesel engine and auxiliary generators. This includes vibration analysis, oil sampling, and thermal imaging of critical components to ensure compliance with safety standards in Pakistan Karachi waters. | 12 Hrs | 15,000 | 180,000 |
| 2 | Overhaul of Fuel Injection System: Disassembly, cleaning, and recalibration of fuel injectors for the main engine. Replacement of worn seals and gaskets to optimize fuel efficiency and reduce emissions, adhering to MARPOL Annex VI regulations. | 1 Job | 250,000 | 250,000 |
| 3 | Hydraulic Steering Gear Maintenance: Inspection and repair of the hydraulic steering gear system. Replacement of hydraulic hoses and filters to ensure precise vessel maneuverability within the busy Karachi Port channels. | 8 Hrs | 12,000 | 96,000 |
| 4 | Emergency Generator Testing: Load bank testing of the emergency diesel generator to verify reliability during power failures. Includes battery bank testing and charging system verification. | 4 Hrs | 10,000 | 40,000 |
| 5 | Technical Consultation & Reporting: Preparation of detailed engineering reports for the vessel's classification society. Consultation on long-term maintenance strategies tailored for the operational environment of the Arabian Sea. | 5 Hrs | 20,000 | 100,000 |
- Payment is due within 30 days from the date of this invoice.
- All services were performed by certified Marine Engineers licensed by the Directorate General of Shipping, Pakistan.
- Late payments will incur an interest charge of 2% per month on the outstanding balance.
- This invoice is valid for tax deduction purposes in Pakistan.
- Any disputes regarding the services rendered must be raised within 7 days of receiving this invoice.
Bank Name: Meezan Bank Limited
Branch: Clifton Branch, Karachi
Account Title: Indus Marine Engineering Solutions
Account Number: 0123456789012
IBAN: PK36MEZN0000001234567890
Contact for Queries:Accounts Department:
Email: [email protected]
Phone: +92-21-3587-XXXX
Address: Clifton Block 5, Karachi, Pakistan
Authorized Signature
Capt. Rizwan AliChief Marine Engineer
Indus Marine Engineering Solutions ⬇️ Download as DOCX Edit online as DOCX
Create your own Word template with our GoGPT AI prompt:
GoGPT