Invoice Petroleum Engineer in Indonesia Jakarta –Free Word Template Download with AI
Professional Petroleum Engineering Services
Jl. Jend. Sudirman Kav. 52-53, SCBD Lot 11
Indonesia Jakarta, 12190
Tax ID (NPWP): 01.234.567.8-901.000
Email: [email protected]
Phone: +62 21 5555 8888
| Invoice Number: | INV-JKT-2023-0892 |
| Date Issued: | October 15, 2023 |
| Due Date: | November 15, 2023 |
| Project Reference: | CEU-2023-Phase-4 |
Bill To:
PT Nusantara Energi Utama
Attn: Director of Operations
Jl. Gatot Subroto Kav. 37
Indonesia Jakarta, 12710
Tax ID (NPWP): 98.765.432.1-012.000
Project Location:
Cepu Field Operations Center
Jawa Tengah, Indonesia
Site Manager: Budi Santoso
Contact: +62 812 3456 7890
Scope of Work Summary
This Invoice covers professional consulting and technical execution services provided by our team of senior Petroleum Engineer specialists. The services were rendered in accordance with the Master Service Agreement (MSA) signed on January 10, 2023, specifically for the Enhanced Oil Recovery (EOR) optimization project located in the Cepu Basin. All technical assessments, reservoir simulations, and field supervision activities were conducted while adhering to the strict regulatory standards mandated by the Ministry of Energy and Mineral Resources of the Republic of Indonesia. The operational base for this engagement was established in Indonesia Jakarta, serving as the central hub for data analysis, reporting, and client coordination before deployment to the field site.
| # | Description of Services | Quantity | Unit Rate (IDR) | Total Amount (IDR) |
|---|---|---|---|---|
| 1 |
Reservoir Characterization & Simulation Comprehensive static and dynamic modeling performed by Lead Petroleum Engineer. Includes history matching of production data from 2018-2023, geological uncertainty analysis, and forecasting of future production profiles under various water injection scenarios. |
1 | 150,000,000 | 150,000,000 |
| 2 |
Well Performance Analysis & Optimization Detailed nodal analysis for 12 producing wells. Identification of artificial lift inefficiencies and recommendation of ESP upgrades. This service was executed by a Senior Petroleum Engineer specializing in production engineering. |
12 | 8,500,000 | 102,000,000 |
| 3 |
Field Supervision & Technical Support On-site supervision during the workover operations at Block C. Includes daily technical reporting, safety compliance checks (K3), and real-time troubleshooting of drilling parameters. Personnel deployed from our Jakarta office. |
15 | 12,000,000 | 180,000,000 |
| 4 |
Enhanced Oil Recovery (EOR) Feasibility Study Technical and economic evaluation of CO2 injection potential. Includes phase behavior analysis, pilot design, and risk assessment. Prepared by a team of three Petroleum Engineers based in Indonesia Jakarta. |
1 | 225,000,000 | 225,000,000 |
| 5 |
Regulatory Compliance & Reporting Preparation of mandatory technical reports for SKK Migas submission. Ensuring all engineering data meets the latest Indonesian upstream regulations. |
1 | 45,000,000 | 45,000,000 |
| Subtotal: | IDR 702,000,000 |
| VAT (PPN) 11%: | IDR 77,220,000 |
| Withholding Tax (PPh 23) 2%: | - IDR 14,040,000 |
| Net Payable Amount: | IDR 765,180,000 |
Payment Terms & Conditions:
- Payment is due within 30 days from the date of this Invoice.
- Please reference Invoice Number INV-JKT-2023-0892 on all payments.
- Late payments will incur a penalty of 2% per month on the outstanding balance.
Bank Transfer Details:
Bank Name: Bank Central Asia (BCA)
Account Name: PT Sumatra Energy Solutions
Account Number: 123-456-7890
Branch: Indonesia Jakarta - Sudirman Branch
SWIFT Code: CENAIDJA
Important Notes:
This document serves as an official Invoice for professional services rendered by qualified Petroleum Engineer personnel. All calculations regarding reservoir volume, production forecasts, and economic evaluations are based on the best available data as of the reporting date. Sumatra Energy Solutions guarantees the technical integrity of the work performed in accordance with industry standards (SPE/IPT) and local regulations in Indonesia Jakarta. Please contact our finance department immediately if you have any discrepancies regarding the line items or tax calculations.
Authorized By:
Dr. Andi Wijaya, P.E.
Chief Technical Officer
Sumatra Energy Solutions
Received By:
__________________________
Name & Signature
PT Nusantara Energi Utama
⬇️ Download as DOCX Edit online as DOCXCreate your own Word template with our GoGPT AI prompt:
GoGPT