Invoice Plumber in Kuwait Kuwait City –Free Word Template Download with AI
Licensed Plumber & Sanitation Specialist
Street 42, Block 7, Salmiya, Kuwait Kuwait City
Phone: +965-2244-7890 | Email: [email protected]
Commercial Registration No: 184729-KW
Ministry of Commerce & Industry License: PLB-2024-00382
Invoice No: INV-KW-2025-04871
Date of Issue: 15 June 2025
Due Date: 30 June 2025
Service Location: Kuwait Kuwait City
| # | Plumbing Service Description | Plumber / Technician | Qty | Unit Price (KWD) | Amount (KWD) |
|---|---|---|---|---|---|
| 1 | Emergency pipe burst repair on 5th floor, including replacement of 12 meters of copper piping and installation of new shut-off valves. Plumber performed full pressure testing after repair. | Eng. Salem Al-Mutairi | 1 | 485.000 | 485.000 |
| 2 | Complete overhaul of the commercial kitchen drainage system on the 3rd floor. Plumber removed corroded PVC pipes, installed new 110mm drainage lines, and fitted a grease trap unit compliant with Kuwait Kuwait City municipal regulations. | Eng. Salem Al-Mutairi | 1 | 1,240.000 | 1,240.000 |
| 3 | Installation of 8 new ceramic toilet units and 4 wall-mounted washbasins on the 7th floor. Plumber handled all water supply connections, waste pipe routing, and final commissioning. | Technician Abdulrahman Al-Sabah | 1 | 2,360.000 | 2,360.000 |
| 4 | Annual preventive maintenance of the building's central water pumping station. Plumber inspected all 4 pumps, replaced worn gaskets, calibrated pressure sensors, and serviced the automated control panel. | Eng. Salem Al-Mutairi | 1 | 620.000 | 620.000 |
| 5 | Supply and installation of 2 new 500-liter hot water storage tanks with thermostatic mixing valves for the 5th and 7th floor restrooms. Plumber ensured proper insulation and anti-scald protection per Kuwait building codes. | Technician Abdulrahman Al-Sabah | 2 | 875.000 | 1,750.000 |
| 6 | Water leak detection and thermal imaging survey across all three serviced floors. Plumber identified 3 minor seepage points behind partition walls and performed targeted repairs with epoxy sealant. | Eng. Salem Al-Mutairi | 1 | 395.000 | 395.000 |
| 7 | Replacement of 14 corroded brass faucets and 6 shower mixer valves throughout the 7th floor. Plumber matched existing fixture specifications and performed final water flow calibration. | Technician Abdulrahman Al-Sabah | 1 | 540.000 | 540.000 |
| 8 | Supply of all materials, fittings, gaskets, Teflon tape, pipe clamps, and consumables used during the above plumbing works. All materials sourced from approved suppliers in Kuwait Kuwait City. | N/A | 1 | 1,125.000 | 1,125.000 |
| Subtotal | 8,515.000 KWD |
| VAT (14%) | 1,192.100 KWD |
| Emergency Call-Out Surcharge (applied to Item 1) | 75.000 KWD |
| Discount – Long-Term Client (5%) | -425.750 KWD |
| Grand Total Due | 9,356.350 KWD |
Payment Terms & Invoice Conditions
This Invoice must be settled in full within fourteen (14) calendar days from the date of issue, no later than 30 June 2025. Payment is to be made via bank transfer to Al-Nakheel Plumbing Services, Bank of Kuwait, Account No. 0045-8821-7734, SWIFT: BKWKKWKW.
Overdue payments on this Invoice will incur a late fee of 2% per month as stipulated under Kuwaiti commercial law. The Plumber reserves the right to suspend ongoing or future plumbing services until all outstanding Invoice balances are cleared.
All work performed by our Plumber team in Kuwait Kuwait City is covered by a 12-month workmanship warranty. This warranty does not cover damage caused by misuse, natural wear, or unauthorized modifications to the plumbing system.
Plumber's Notes & Recommendations
The undersigned Plumber, Engineer Salem Al-Mutairi, wishes to note the following observations made during the service visit in Kuwait Kuwait City:
1. The building's main water inlet pipe (showing 22 years of service) is approaching the end of its recommended lifespan. We strongly advise scheduling a full replacement within the next 12–18 months to avoid a catastrophic failure.
2. The grease trap installed on the 3rd floor should be professionally cleaned every 90 days to maintain compliance with Kuwait Kuwait City environmental bylaws and to prevent blockages in the municipal sewer line.
3. Two of the four central pumps showed early signs of bearing wear. A follow-up inspection by our Plumber team is recommended within 6 months.
4. All new fixtures and piping installed under this Invoice are registered in the client's property maintenance log for future reference.
Authorized Signature – Plumber
Eng. Salem Al-Mutairi
Licensed Plumber, Al-Nakheel Plumbing Services
Client Acknowledgment
Mr. Faisal Al-Harbi
Al-Rashid Real Estate Management LLC
⬇️ Download as DOCX Edit online as DOCXCreate your own Word template with our GoGPT AI prompt:
GoGPT