GoGPT GoSearch New DOC New XLS New PPT

OffiDocs favicon

Invoice Plumber in Uganda Kampala –Free Word Template Download with AI

Licensed Plumber & Water Systems Specialist

P.O. Box 4521, Plot 17, Kampala Road

Kampala, Uganda

Tel: +256 772 345 678 | Email: [email protected]

Uganda Revenue Authority TIN: 100234567-000045

Invoice No: KFPL-2025-00847

Date Issued: 14 June 2025

Due Date: 28 June 2025

Bill To

M/s. Nakivubo Heights Residential Estate

Attn: Mr. David Okello, Estate Manager

Plot 23, Nakivubo Road, Kampala

Kampala, Uganda

TIN: 100987654-000012

Email: [email protected]

Job Details

Project: Full Plumbing Overhaul & Water Supply Upgrade

Location: Nakivubo Heights, Kampala, Uganda

Plumber Assigned: Eng. Samuel Mugisha (Lead Plumber)

Team Size: 4 Licensed Plumbers

Duration: 10 June 2025 – 13 June 2025

# Description of Plumbing Service Quantity Unit Rate (UGX) Amount (UGX) Date
1 Complete inspection and diagnostic assessment of all plumbing infrastructure across 12 residential units. The Plumber team identified 34 points of failure in the water supply network. 12 units 150,000 1,800,000 10 Jun 2025
2 Replacement of corroded galvanized steel pipes (25mm and 40mm) with high-grade PPR plumbing pipes throughout the main water distribution lines in Kampala. 320 meters 85,000 27,200,000 10–12 Jun 2025
3 Installation of new 5,000-litre elevated water storage tanks (2 units) with overflow protection, anti-contamination covers, and UV-resistant cladding suitable for Uganda Kampala climate conditions. 2 tanks 1,850,000 3,700,000 11–12 Jun 2025
4 Replacement of 48 faulty ceramic and brass plumbing fixtures including washbasins, WC pans, showerheads, and kitchen sinks across all residential units. 48 fixtures 220,000 10,560,000 11–13 Jun 2025
5 Installation of a new 3-phase submersible water pump (2.5 HP) with automatic pressure control system and float switch for reliable water supply in the Kampala area. 1 set 2,400,000 2,400,000 12 Jun 2025
6 Complete re-plumbing of the communal laundry area including drainage channels, floor waste traps, and backflow prevention valves compliant with Uganda National Plumbing Code. 1 area 1,200,000 1,200,000 13 Jun 2025
7 Pressure testing, leak detection, and final commissioning of the entire upgraded plumbing system. The Plumber team conducted 72-hour continuous pressure monitoring to certify all joints and connections. 1 system 800,000 800,000 13 Jun 2025
8 Provision of written warranty documentation, as-built plumbing drawings, and a 12-month maintenance schedule for the estate management team in Kampala, Uganda. 1 package 350,000 350,000 13 Jun 2025
Subtotal 48,010,000 UGX
VAT (18%) 8,641,800 UGX
Uganda Revenue Authority Withholding Tax (6%) (2,880,600) UGX
GRAND TOTAL PAYABLE 53,771,200 UGX

Payment Instructions

Bank: Stanbic Bank Uganda Ltd., Kampala Main Branch

Account Name: Kampala FlowMaster Plumbing Ltd.

Account Number: 0012345678901

SWIFT Code: STBBUGKA

Mobile Money (MTN/Airtel): +256 772 345 678

Please reference Invoice No. KFPL-2025-00847 in all payment communications.

Terms, Conditions & Notes

1. This Invoice is issued by Kampala FlowMaster Plumbing Ltd., a registered Plumber and water services company operating in Kampala, Uganda, under the Uganda Companies Act, 2012 (Registration No. 100456789).

2. Payment is due within fourteen (14) calendar days from the date of this Invoice. Late payments shall attract a penalty of 2% per month as stipulated under the Uganda Contract Act.

3. All plumbing materials and workmanship are covered under a 12-month warranty from the date of final commissioning. The Plumber team shall attend to any warranty claims within 48 hours of notification.

4. This Invoice is subject to the Uganda National Plumbing Code and the standards set by the Uganda National Bureau of Standards (UNBS). All materials used comply with UNBS certification requirements for plumbing products in Uganda Kampala.

5. The Plumber services described herein were performed in full compliance with the Occupational Safety and Health Act, 2006, and all local Kampala City Council by-laws governing plumbing works and water infrastructure modifications.

6. Any disputes arising from this Invoice shall be resolved through arbitration in Kampala, Uganda, in accordance with the Arbitration Act, 2000.

7. This Invoice constitutes the final and complete statement of all plumbing services rendered. No additional charges shall apply beyond the amounts stated herein unless a written variation order is executed by both parties.

Kampala FlowMaster Plumbing Ltd. | Licensed Plumber | Kampala, Uganda

Uganda Revenue Authority TIN: 100234567-000045 | URA Tax Clearance: Active

Uganda National Plumbing Association (UNPA) Member No. UNPA-KAL-2019-0342

This Invoice is valid for 30 days from the date of issue. Please retain for your records.

Thank you for choosing Kampala FlowMaster Plumbing Ltd. as your trusted Plumber in Uganda Kampala. We are committed to delivering excellence in every plumbing project.

⬇️ Download as DOCX Edit online as DOCX

Create your own Word template with our GoGPT AI prompt:

GoGPT
×
Advertisement
❤️Shop, book, or buy here — no cost, helps keep services free.