Invoice Welder in Australia Sydney –Free Word Template Download with AI
ABN: 48 215 673 901
Unit 7, 142 Industrial Avenue, Wetherill Park NSW 2164
Phone: +61 2 9634 7821 | Email: [email protected]
Service Area: Australia Sydney Metropolitan Region
Invoice No: IFW-2025-0487
Date Issued: 14 June 2025
Due Date: 28 June 2025
Payment Due in 14 Days
Bill To
Harbour City Construction Group
Attn: Mr. David Chen, Project Manager
Level 12, 88 George Street, Sydney NSW 2000
ABN: 12 345 678 901
Phone: +61 2 9200 4455
Email: [email protected]
Project Details
Project: Sydney Harbour Bridge Maintenance – Sector 4
Location: Australia Sydney, NSW 2000
Contract Ref: HCC-2025-0092
Welder Assigned: Senior Welder – J. Okafor (Cert. AWS D1.1)
Work Period: 2 June 2025 – 13 June 2025
| # | Description of Welder Services | Date | Qty | Rate (AUD) | Amount (AUD) |
|---|---|---|---|---|---|
| 1 | Structural Steel Welding – MIG (GMAW) – Fabrication and repair of load-bearing girders, Sector 4, Sydney Harbour Bridge. Performed by certified Welder J. Okafor in compliance with AS/NZS 1554.1. | 02–05 Jun 2025 | 4 days | $1,250.00 | $5,000.00 |
| 2 | TIG (GTAW) Precision Welding – Stainless steel handrail fabrication and installation, pedestrian walkway, Australia Sydney site. Includes pre-weld preparation, grinding, and post-weld finishing. | 06–08 Jun 2025 | 3 days | $1,100.00 | $3,300.00 |
| 3 | Underwater Welding Assessment – Diver-Welder joint inspection of submerged structural joints, Sydney Harbour, Australia Sydney. Includes NDT (Non-Destructive Testing) via ultrasonic and magnetic particle methods. | 09 Jun 2025 | 1 day | $2,400.00 | $2,400.00 |
| 4 | Aluminium Welding – 5083-H321 marine-grade aluminium panel repair, dockside facility, Australia Sydney. Welder operated TIG and MIG processes with argon shielding gas. | 10–11 Jun 2025 | 2 days | $1,350.00 | $2,700.00 |
| 5 | Welding Consumables & Materials – Electrodes (E7018), MIG wire (ER70S-6), TIG filler rods (ER308L), shielding gas (Argon/CO2 mix), grinding discs, and safety PPE supplied for the duration of the project in Australia Sydney. | 02–13 Jun 2025 | 1 lot | $1,875.00 | $1,875.00 |
| 6 | Welder Supervision & Quality Assurance – On-site supervision by Lead Welder and QA Inspector, daily weld log documentation, weld map updates, and compliance reporting for the Australia Sydney project authority. | 02–13 Jun 2025 | 12 days | $450.00 | $5,400.00 |
| 7 | Mobile Welding Unit Deployment – Transport and setup of mobile welding workshop, fume extraction systems, and hot-work permits for the Australia Sydney metropolitan construction zone. | 02 Jun 2025 | 1 day | $650.00 | $650.00 |
| Subtotal (AUD) | $21,325.00 |
| GST @ 10% (AUD) | $2,132.50 |
| Total Amount Due (AUD) | $23,457.50 |
Payment Terms & Instructions
This Invoice is payable within fourteen (14) calendar days from the date of issue, i.e., no later than 28 June 2025. Payment is to be made via Electronic Funds Transfer (EFT) to the following account:
Bank: Australia and New Zealand Banking Group (ANZ)
Account Name: IronForge Welding Solutions Pty Ltd
BSB: 012-345 | Account No: 1234 5678
Reference: IFW-2025-0487
Please quote the Invoice number on all correspondence and remittances. A late payment fee of 1.5% per month will be applied to any outstanding balance after the due date, in accordance with the terms of the master services agreement executed on 15 May 2025.
Notes & Compliance Statement
All welding services described in this Invoice were performed by a qualified and certified Welder holding current Australian Welding Council (AWC) certifications and AWS D1.1 structural welding qualifications. The Welder operated in full compliance with the Australian Standard AS/NZS 1554.1 (Welding, Fabricating and Siting of Steel Structures) and all applicable New South Wales Work Health and Safety regulations.
This Invoice covers all labour, materials, equipment, and supervision costs associated with the welding works carried out at the specified project site in Australia Sydney. No additional charges will be incurred beyond the amounts stated herein unless a formal variation order is executed in writing by both parties.
All welds have been inspected and passed non-destructive testing (NDT) in accordance with the project quality plan. Certified weld maps and NDT reports are available upon request and have been lodged with the project file at Harbour City Construction Group, Sydney NSW 2000.
IronForge Welding Solutions Pty Ltd maintains full public liability insurance (A$20,000,000) and workers' compensation coverage as required for all operations within Australia Sydney and the broader New South Wales jurisdiction.
⬇️ Download as DOCX Edit online as DOCXCreate your own Word template with our GoGPT AI prompt:
GoGPT