Invoice Welder in Indonesia Jakarta –Free Word Template Download with AI
Jl. Raya Industri No. 45, Cakung Industrial Estate
Jakarta Timur, Indonesia Jakarta 13910
Tel: +62 21 4601 8892 | Email: [email protected]
NPWP: 01.234.567.8-451.000
Welder Services
Invoice No: INV-JKT-2025-00847
Date: 15 June 2025
Due Date: 30 June 2025
Billed To (Client)
PT. Artha Konstruksi Indonesia
Jl. Jend. Sudirman Kav. 88, SCBD District
Jakarta Selatan, Indonesia Jakarta 12190
Attn: Mr. Budi Santoso, Procurement Manager
Client Ref: AKI-PO-2025-0312
Project Details
Project: Steel Structure Fabrication – Phase 2
Location: Cakung Industrial Zone, Indonesia Jakarta
Welder Team: 4 Certified Welders (AWS D1.1)
Period: 1 June 2025 – 14 June 2025
Contract No: CTR-WLD-JKT-2025-019
| No. | Description of Welder Service | Welder Grade | Qty / Hours | Rate (IDR) | Amount (IDR) |
|---|---|---|---|---|---|
| 1 | Structural Steel Welding – GMAW (MIG) Process for I-Beam and H-Beam Assembly, Indonesia Jakarta Site | Welder Level 3 (Senior) | 120 hrs | 285,000 | 34,200,000 |
| 2 | Pipeline Welding – SMAW (Stick) Process for Carbon Steel Piping, 6-inch Diameter, Indonesia Jakarta | Welder Level 3 (Senior) | 96 hrs | 310,000 | 29,760,000 |
| 3 | TIG Welding (GTAW) – Stainless Steel 304L Fixtures and Handrails, Indonesia Jakarta Facility | Welder Level 2 (Intermediate) | 80 hrs | 245,000 | 19,600,000 |
| 4 | Welding Inspection & NDT (Non-Destructive Testing) – Radiographic and Ultrasonic Testing per AWS D1.1 Standard | Welder Inspector (Level II) | 40 hrs | 350,000 | 14,000,000 |
| 5 | Welding Consumables & Gas Supply – ER70S-6 Wire, E7018 Electrodes, Argon & CO2 Shielding Gas for Indonesia Jakarta Operations | Material Supply | 1 lot | 8,750,000 | 8,750,000 |
| 6 | Welder PPE & Safety Equipment – Welding Helmets, Leather Aprons, Respirators, and Fire-Resistant Clothing for Indonesia Jakarta Site Compliance | Safety Supply | 4 sets | 1,250,000 | 5,000,000 |
| 7 | Welder Travel & Accommodation – Mobilization of 4 Welder Team from Surabaya to Indonesia Jakarta (Round Trip) | Logistics | 4 pax | 2,800,000 | 11,200,000 |
| 8 | Welding Procedure Qualification (WPQR) & Welder Performance Qualification (WPS) Documentation per SNI 7389:2014 | Engineering | 1 package | 6,500,000 | 6,500,000 |
| Subtotal | 128,010,000 |
| PPN (VAT) 11% – Indonesia Jakarta Tax | 14,081,100 |
| Withholding Tax (PPh 23) 2% | (2,560,200) |
| GRAND TOTAL (IDR) | 139,530,900 |
Invoice Notes & Welder Service Terms
This Invoice is issued by PT. Nusantara Welding Solutions for professional Welder services rendered at the Indonesia Jakarta project site. All welding operations were performed in strict accordance with AWS D1.1 Structural Welding Code and SNI 7389:2014 Indonesian National Standards for Welding Procedures.
- All Welder personnel assigned to this Indonesia Jakarta project hold valid AWS and SNI certifications. Welder qualification records are available upon request and are attached as Appendix A to this Invoice.
- The Welder team operated under full compliance with K3 (Keselamatan dan Kesehatan Kerja) regulations mandated by the Indonesian Ministry of Manpower for all industrial operations in Indonesia Jakarta.
- Welding consumables listed in this Invoice were sourced from approved Indonesian suppliers and meet SNI material specifications. Certificates of Material Analysis (CMA) are available for the client's quality records.
- Payment for this Invoice is due within 14 (fourteen) calendar days from the Invoice date. Late payments will incur a penalty of 1% per month as stipulated in the Indonesia Jakarta service contract.
- This Invoice covers all Welder labor, supervision, consumables, and mobilization costs for the period specified. Any additional Welder hours or scope changes beyond the contracted Indonesia Jakarta deliverables will be invoiced separately.
- Welding defect rectification (if any) within 30 days of completion at the Indonesia Jakarta site is included at no additional charge under the warranty clause of the master agreement.
Payment Instructions – Indonesia Jakarta
Bank: Bank Central Asia (BCA)
Account Name: PT. Nusantara Welding Solutions
Account No: 512-3456-789-01
SWIFT Code: BCAKIDJA
Branch: Cakung, Indonesia Jakarta
Invoice Issued By
Name: Sari Wulandari, Finance Manager
Signature: _________________________
Date: 15 June 2025
Stamp: [Company Seal]
⬇️ Download as DOCX Edit online as DOCXCreate your own Word template with our GoGPT AI prompt:
GoGPT