GoGPT GoSearch New DOC New XLS New PPT

OffiDocs favicon

Purchase Order Carpenter in Sudan Khartoum –Free Word Template Download with AI

Al-Nile Construction & Interiors Ltd.

Office 14, El-Khatib Street, Omdurman, Sudan Khartoum

Tel: +249-183-456-789 | Email: [email protected]

Commercial Registration No. 10245789 | VAT Reg. No. 840215673

Purchase Order No.: PO-2025-KH-0472

Date of Issue: 15 June 2025

Required Completion Date: 30 August 2025

Project Reference: KH-RES-2025-019

Payment Terms: 30% Advance / 40% Midpoint / 30% Completion

Validity Period: 60 days from date of issue

Supplier / Contractor Details
Field Details
Contractor Name Master Carpenter Ibrahim El-Tayeb Workshop
Business Address Workshop 22, Industrial Area, El-Mograg, Sudan Khartoum
Contact Person Ibrahim El-Tayeb (Lead Carpenter)
Phone / Email +249-911-234-567 / [email protected]
Trade License No. SD-KH-TRD-2019-3342 (Issued by Khartoum State Trade Authority)
Specialization Custom Carpentry, Joinery, Woodwork Installation, and Furniture Fabrication
Description of Purchase Order Scope

This Purchase Order is issued by Al-Nile Construction & Interiors Ltd. to engage the services of a qualified Carpenter and his workshop team for the complete carpentry and joinery works associated with the residential development project located in the Shambat district of Sudan Khartoum. The scope of work encompasses the fabrication, finishing, and on-site installation of all wooden interior elements as specified in the architectural drawings and technical annexures attached to this Purchase Order. The Carpenter shall be responsible for sourcing all raw timber materials, adhesives, hardware, and finishing agents unless otherwise stated in the line-item schedule below. All work must comply with the building codes and standards enforced by the Ministry of Housing and Urban Planning in Sudan Khartoum.

Line Items and Schedule of Works
Item No. Description of Carpenter Work / Materials Quantity Unit Unit Price (SDG) Total (SDG)
01 Fabrication and installation of solid teak entrance doors (3-panel, 900mm x 2100mm) including ironmongery, hinges, and security locks for 12 residential units 12 Doors 85,000 1,020,000
02 Custom-built kitchen cabinetry (upper and lower units) with granite countertop integration, soft-close mechanisms, and brass handles for 12 units 12 Sets 220,000 2,640,000
03 Master bedroom wardrobes with sliding doors, internal shelving, and mirror panels (cedar wood, 2400mm x 2000mm x 600mm) 12 Units 145,000 1,740,000
04 Interior wall paneling and decorative mouldings (oak veneer) for living rooms and corridors, including skirting boards and ceiling cove trim 1,850 Sq. Meters 3,200 5,920,000
05 Staircase balustrade and handrail fabrication (solid mahogany, 1200mm height) for the central staircase of the main building 1 Set 480,000 480,000
06 Site supervision, quality inspection, and final finishing by the lead Carpenter and two assistant carpenters over a 10-week period 10 Weeks 35,000 350,000
07 Supply of all raw timber (teak, cedar, oak, mahogany), plywood sheets, wood adhesives, sandpaper, varnish, and hardware as required for items 01–05 1 Lump Sum 1,200,000 1,200,000
Subtotal (SDG) 13,350,000
VAT @ 10% (SDG) 1,335,000
Grand Total (SDG) 14,685,000
Terms and Conditions
  1. This Purchase Order constitutes a binding agreement between Al-Nile Construction & Interiors Ltd. and the named Carpenter contractor upon signature by both parties. All work shall be executed at the project site in Shambat, Sudan Khartoum, unless otherwise directed in writing by the project manager.
  2. The Carpenter shall provide a detailed work schedule within five (5) business days of accepting this Purchase Order, outlining the sequence of fabrication, delivery, and installation phases. Any deviation from the approved schedule must be communicated in writing at least 48 hours in advance.
  3. All timber and wood products supplied under this Purchase Order must be sourced from licensed suppliers operating within Sudan Khartoum or its immediate hinterland, and must carry valid phytosanitary certificates where applicable. The use of illegally harvested timber is strictly prohibited and will result in immediate termination of this Purchase Order.
  4. Payment shall be disbursed as follows: 30% advance payment upon execution of this Purchase Order; 40% upon completion and inspection of all off-site fabrication (items 01–05); and the remaining 30% upon final sign-off after on-site installation, finishing, and a 7-day defect-liability period.
  5. The Carpenter is responsible for all safety measures at the Sudan Khartoum project site, including but not limited to personal protective equipment, dust extraction, and fire prevention. The contractor shall maintain valid workers' compensation insurance for all personnel engaged under this Purchase Order.
  6. Any variation or change order to the scope defined in this Purchase Order must be agreed upon in writing by both parties before additional work commences. Verbal instructions shall not be binding.
  7. Disputes arising from this Purchase Order shall be resolved through amicable negotiation. Should negotiation fail, the matter shall be referred to the Commercial Arbitration Centre in Sudan Khartoum in accordance with the Sudanese Arbitration Act.
  8. This Purchase Order is governed by the laws of the Republic of the Sudan. All communications regarding this document shall be directed to the procurement office of Al-Nile Construction & Interiors Ltd. in Sudan Khartoum.
Acceptance and Authorization

For and on behalf of Al-Nile Construction & Interiors Ltd. (Buyer)

Name: Eng. Salma Abdelrahman

Title: Procurement Director

Signature: _________________________

Date: _________________________

For and on behalf of Master Carpenter Ibrahim El-Tayeb Workshop (Supplier)

Name: Ibrahim El-Tayeb

Title: Lead Carpenter / Owner

Signature: _________________________

Date: _________________________

This Purchase Order (PO-2025-KH-0472) was prepared and issued in Sudan Khartoum. It is valid for sixty (60) calendar days from the date of issue. Unauthorized reproduction or distribution of this document is prohibited. For queries, contact the Procurement Department at Al-Nile Construction & Interiors Ltd., El-Khatib Street, Sudan Khartoum.

⬇️ Download as DOCX Edit online as DOCX

Create your own Word template with our GoGPT AI prompt:

GoGPT
×
Advertisement
❤️Shop, book, or buy here — no cost, helps keep services free.