Purchase Order Chemical Engineer in Italy Milan –Free Word Template Download with AI
Date of Issue: 14 June 2025 | Valid Until: 14 September 2025
Purchasing Party (Buyer)
Chimica Industriale S.r.l.
Via Paolo Sarpi, 21
20154 Milan (MI), Italy
VAT: IT02458710963
Chamber of Commerce: MI-1234567
Contact: Dott. Marco Bellini, Procurement Director
Email: [email protected]
Phone: +39 02 4567 8901
Supplier / Service Provider
Ing. Elena Ferraro – Chemical Engineering Consultant
Via Torino, 88, Studio 4
20122 Milan (MI), Italy
VAT: IT03891240965
Professional Registration: Albo Ingegneri di Milano, No. 15872
Contact: Ing. Elena Ferraro, Chemical Engineer
Email: [email protected]
Phone: +39 02 8765 4321
Description of Purchase Order – Chemical Engineer Services in Italy MilanThis Purchase Order is issued by Chimica Industriale S.r.l. to formally engage the services of a qualified Chemical Engineer for the design, optimization, and regulatory compliance of industrial chemical processing facilities located in Italy Milan and its metropolitan area. The scope of work encompasses process engineering, safety assessments, environmental impact analysis, and technical supervision of ongoing production lines in accordance with Italian and European regulatory frameworks.
Line Items and Scope of Work| Ref. | Description of Service | Qty / Duration | Unit Rate (EUR) | Total (EUR) | Location |
|---|---|---|---|---|---|
| 01 | Process design and P&ID development for a new catalytic reactor unit. The Chemical Engineer shall prepare complete process flow diagrams, heat and mass balance calculations, and equipment sizing documentation. | 1 project (120 hrs) | €145.00 / hr | €17,400.00 | Milan, Italy |
| 02 | Hazard and Operability (HAZOP) study and risk assessment for existing petrochemical storage facilities. The Chemical Engineer shall conduct on-site inspections, prepare risk matrices, and issue corrective action recommendations per D.Lgs. 81/2008. | 1 study (80 hrs) | €155.00 / hr | €12,400.00 | Milan, Italy |
| 03 | Environmental compliance audit and emission reduction strategy. The Chemical Engineer shall evaluate current VOC and particulate emissions, model dispersion scenarios, and propose abatement technologies aligned with EU Directive 2010/75/EU. | 1 audit (60 hrs) | €150.00 / hr | €9,000.00 | Milan, Italy |
| 04 | Technical supervision and on-site support during commissioning of the new reactor unit. The Chemical Engineer shall be present at the facility in Italy Milan for a minimum of 15 working days to oversee start-up procedures, validate process parameters, and sign off on operational readiness. | 15 days | €1,200.00 / day | €18,000.00 | Milan, Italy |
| 05 | Preparation of technical documentation package for submission to the Milan Metropolitan City (Città Metropolitana di Milano) environmental authority, including the AIA (Autorizzazione Integrata Ambientale) application support. | 1 deliverable (40 hrs) | €140.00 / hr | €5,600.00 | Milan, Italy |
| 06 | Monthly technical advisory retainer for ongoing process optimization, troubleshooting, and regulatory updates. The Chemical Engineer shall provide remote and on-site support as needed throughout the contract period in Italy Milan. | 12 months | €3,500.00 / month | €42,000.00 | Milan, Italy |
| Subtotal: | €104,400.00 | ||||
| VAT (22% – Italian Standard Rate): | €22,968.00 | ||||
| TOTAL AMOUNT DUE (EUR): | €127,368.00 | ||||
- Acceptance: This Purchase Order shall become a binding contract upon written acceptance by the Chemical Engineer, Ing. Elena Ferraro, within ten (10) business days of the date of issue. Acceptance must be confirmed in writing via email or signed copy returned to the Purchasing Party.
- Place of Performance: All services described in this Purchase Order shall be performed at the facilities of Chimica Industriale S.r.l. located in Italy Milan, or at such other locations within the Milan metropolitan area as mutually agreed in writing. The Chemical Engineer shall bear responsibility for travel within the city of Milan.
- Payment Terms: Invoices shall be submitted monthly in arrears. Payment shall be made within thirty (30) days of receipt of a valid invoice via bank transfer to the account specified by the Chemical Engineer. Late payments shall accrue interest at the rate prescribed by Italian Civil Code Article 1284.
- Professional Standards: The Chemical Engineer shall perform all services in full compliance with the professional code of conduct of the Albo degli Ingegneri della Provincia di Milano, applicable Italian legislation (including D.Lgs. 81/2008 on workplace safety, D.Lgs. 152/2006 on environmental protection), and relevant European Union directives.
- Intellectual Property: All designs, calculations, reports, and documentation produced under this Purchase Order shall become the exclusive property of Chimica Industriale S.r.l. upon full payment. The Chemical Engineer retains the right to reference the project in professional portfolios with prior written consent.
- Confidentiality: The Chemical Engineer shall maintain strict confidentiality regarding all proprietary processes, trade secrets, and operational data encountered during the engagement in Italy Milan. This obligation shall survive the termination of this Purchase Order for a period of five (5) years.
- Insurance: The Chemical Engineer shall maintain professional liability insurance (RC Professionale) with a minimum coverage of €1,000,000 per occurrence, valid throughout the duration of this Purchase Order.
- Termination: Either party may terminate this Purchase Order with thirty (30) days written notice. In the event of termination, the Chemical Engineer shall be compensated for all services rendered up to the effective date of termination, plus a reasonable wind-down period.
- Governing Law and Jurisdiction: This Purchase Order shall be governed by and construed in accordance with the laws of the Italian Republic. Any disputes arising herefrom shall be subject to the exclusive jurisdiction of the Tribunale di Milano, Italy Milan.
- Force Majeure: Neither party shall be liable for delays or failures in performance resulting from events beyond reasonable control, including but not limited to natural disasters, government actions, or public health emergencies affecting the Italy Milan region.
For and on behalf of Chimica Industriale S.r.l. (Buyer)
Dott. Marco BelliniProcurement Director
Date: _______________
For and on behalf of Ing. Elena Ferraro (Chemical Engineer / Supplier)
Ing. Elena FerraroChemical Engineer – Albo Ingegneri MI No. 15872
Date: _______________ ⬇️ Download as DOCX Edit online as DOCX
Create your own Word template with our GoGPT AI prompt:
GoGPT