Purchase Order Civil Engineer in Spain Valencia –Free Word Template Download with AI
PO Number: PO-2025-VAL-04782 | Date of Issue: 14 June 2025
Valid Until: 14 July 2025 | Currency: EUR (€)
SPAIN VALENCIA
Company Name: Infraestructuras del Mediterráneo S.L.
Address: Av. del Puerto, 45, 46022 Valencia, Spain
VAT Number (NIF): B-98765432
Contact Person: Mr. Alejandro Ferrer, Procurement Director
Email: [email protected]
Phone: +34 963 456 789
Project Reference: PM-VAL-2025-011
Project Name: Valencia Coastal Infrastructure Rehabilitation
Site Location: Valencia, Spain (Province of Valencia, Comunitat Valenciana)
Contract Authority: Ayuntamiento de Valencia – Dirección de Obras Públicas
Regulatory Framework: Ley 9/2017 del Sector Público (Spain)
Professional Name: Ing. Carmen Solís Navarro
Professional Title: Licensed Civil Engineer (Ingeniero Civil)
Registration: COICV (Colegio Oficial de Ingenieros Civiles de Valencia), No. 12847
Address: Calle de la Marina, 12, 3.ºB, 46003 Valencia, Spain
VAT Number (NIF): 28456789K
Specialization: Structural Engineering, Geotechnical Analysis, Hydraulic Systems
Professional Liability Insurance: Mapfre Seguros, Policy No. ML-2025-88341
Bank Account (IBAN): ES91 2100 0418 4502 0005 1332
Email: [email protected]
Phone: +34 612 345 678
This Purchase Order is issued by Infraestructuras del Mediterráneo S.L. to formally engage the services of a qualified Civil Engineer for the execution of structural design, geotechnical assessment, and hydraulic infrastructure planning for the Valencia Coastal Infrastructure Rehabilitation project. The Civil Engineer shall perform all professional duties in strict compliance with the Spanish Building Code (Código Técnico de la Edificación – CTE), the European Norms (EN) applicable in Spain, and the specific technical requirements established by the Ayuntamiento de Valencia for public works in the Spain Valencia region.
| Ref. | Description of Civil Engineer Services | Quantity | Unit | Unit Price (€) | Total (€) |
|---|---|---|---|---|---|
| 01 | Structural design and load analysis for the Valencia coastal promenade reinforcement (Civil Engineer – structural calculations, FEM modelling, and material specifications) | 1 | Lump Sum | 18,500.00 | 18,500.00 |
| 02 | Geotechnical investigation supervision and soil stability assessment for the Spain Valencia shoreline works (Civil Engineer – field supervision, borehole interpretation, and geotechnical report) | 1 | Lump Sum | 12,300.00 | 12,300.00 |
| 03 | Hydraulic drainage system design for Valencia urban flood mitigation (Civil Engineer – hydraulic modelling, pipe sizing, and stormwater management plan) | 1 | Lump Sum | 9,750.00 | 9,750.00 |
| 04 | On-site technical supervision and quality control during construction phase (Civil Engineer – weekly site visits, progress reports, and non-conformance documentation) | 24 | Weeks | 1,200.00 | 28,800.00 |
| 05 | Final as-built documentation, compliance certification, and handover report to the Ayuntamiento de Valencia (Civil Engineer – stamped drawings, technical dossier, and legal certification) | 1 | Lump Sum | 6,450.00 | 6,450.00 |
| Subtotal | 75,800.00 | ||||
| VAT (IVA) – 21% (Spain) | 15,918.00 | ||||
| GRAND TOTAL (EUR) | 91,718.00 | ||||
- Scope of Work: The Civil Engineer shall deliver all professional services exclusively for the project located in Spain Valencia, specifically within the municipal boundaries of the city of Valencia, Comunitat Valenciana. No services shall be rendered outside this geographical scope without prior written amendment to this Purchase Order.
- Payment Terms: Payment shall be made within thirty (30) calendar days from the date of invoice receipt. Invoices must reference this Purchase Order number (PO-2025-VAL-04782) and include the Civil Engineer's NIF and IBAN. Payment shall be executed via bank transfer to the account specified in Section 2.
- Professional Liability: The Civil Engineer shall maintain valid professional liability insurance with a minimum coverage of €1,000,000 per claim throughout the duration of this Purchase Order. Proof of insurance shall be provided prior to commencement of work.
- Regulatory Compliance: All deliverables produced by the Civil Engineer must comply with the Spanish Building Code (CTE), the applicable European Standards transposed into Spanish law, and the specific technical regulations of the Generalitat Valenciana and the Ayuntamiento de Valencia. The Civil Engineer is responsible for obtaining all necessary professional stamps (sello profesional) and registrations with the COICV.
- Intellectual Property: All drawings, calculations, reports, and technical documentation produced under this Purchase Order shall become the exclusive property of Infraestructuras del Mediterráneo S.L. and the Ayuntamiento de Valencia upon full payment. The Civil Engineer retains the right to reference the project in professional portfolios subject to confidentiality agreements.
- Confidentiality: The Civil Engineer shall treat all project data, site plans, and proprietary information as strictly confidential. This obligation survives the termination of this Purchase Order for a period of five (5) years.
- Termination: Either party may terminate this Purchase Order with thirty (30) days' written notice. In the event of termination, the Civil Engineer shall be compensated for all services rendered up to the termination date, plus a 10% administrative fee on the remaining contract value.
- Governing Law and Jurisdiction: This Purchase Order shall be governed by the laws of Spain. Any disputes arising from this Purchase Order shall be subject to the exclusive jurisdiction of the courts of Valencia, Spain.
- Force Majeure: Neither party shall be liable for delays caused by events beyond reasonable control, including but not limited to natural disasters, government-mandated work stoppages in Spain Valencia, or public health emergencies.
| Milestone | Deliverable | Target Date |
|---|---|---|
| Milestone 1 | Structural design package and geotechnical report (Civil Engineer) | 31 July 2025 |
| Milestone 2 | Hydraulic system design and drainage plan (Civil Engineer) | 15 September 2025 |
| Milestone 3 | On-site supervision – 24 weeks (Civil Engineer) | 15 September 2025 – 15 March 2026 |
| Milestone 4 | Final as-built documentation and handover (Civil Engineer) | 30 April 2026 |
This Purchase Order is hereby authorized and approved for the engagement of the Civil Engineer for the Valencia Coastal Infrastructure Rehabilitation project in Spain Valencia. By signing below, both parties acknowledge and agree to all terms, conditions, and obligations set forth in this document.
For Infraestructuras del Mediterráneo S.L. (Buyer)Name: Alejandro Ferrer
Title: Procurement Director
Date: _______________ For Ing. Carmen Solís Navarro (Civil Engineer – Supplier)
Name: Carmen Solís Navarro
Title: Licensed Civil Engineer, COICV No. 12847
Date: _______________ ⬇️ Download as DOCX Edit online as DOCX
Create your own Word template with our GoGPT AI prompt:
GoGPT