Purchase OrderPurchase Order Details
Purchase Order No: PO-EIDC-2025-0047
Date of Issue: 15 June 2025
Valid Until: 15 July 2025
Payment Terms: Net 30 Days
Project Reference: AAB-GRID-EXP-2025
Supplier / Service Provider
Name: Addis Electrical Engineering Consultants PLC
Address: 5th Avenue, CMC Building, 4th Floor, Megenagna, Addis Ababa, Ethiopia
Contact Person: Eng. Dawit Tadesse
TIN: 0098765432
Bank: Commercial Bank of Ethiopia, Branch: Bole
Account No: 1001-2345-6789-01
Buyer / Requisitioning Department
Department: Power Distribution & Grid Expansion Division
Requisitioned By: Mr. Samuel Bekele, Senior Project Manager
Approved By: Dr. Hanna Alemu, Chief Executive Officer
Project Location
Primary Site: Addis Ababa Light Rail Transit Corridor, Bole to CMC Section
Secondary Site: Ethiopian Electric Utility Substation, Arada Woreda, Addis Ababa
Country: Ethiopia
| Item No. | Description | Quantity | Unit | Unit Price (ETB) | Total Price (ETB) |
|---|---|---|---|---|---|
| 01 | Senior Electrical Engineer – Full-time engagement for grid expansion design, load analysis, and system integration for the Addis Ababa metropolitan power distribution network | 1 | Professional (12 months) | 1,850,000.00 | 1,850,000.00 |
| 02 | Mid-level Electrical Engineer – Support for substation equipment commissioning, protective relay coordination, and cable routing surveys across Addis Ababa districts | 2 | Professional (12 months) | 920,000.00 | 1,840,000.00 |
| 03 | Electrical Engineering Technical Reports – Comprehensive feasibility studies, single-line diagrams, and compliance documentation aligned with Ethiopian National Electrical Code and Ethiopian Electric Utility standards | 6 | Report | 185,000.00 | 1,110,000.00 |
| 04 | On-site Supervision and Quality Assurance – Daily presence at construction sites in Addis Ababa to ensure all electrical installations meet the specifications outlined in this Purchase Order | 240 | Working Days | 8,500.00 | 2,040,000.00 |
| 05 | Training and Capacity Building – Workshops for local Ethiopian technicians on modern electrical engineering practices, safety protocols, and smart grid technologies | 4 | Workshop Sessions | 320,000.00 | 1,280,000.00 |
| Grand Total (ETB) | 8,120,000.00 | ||||
| VAT (15% – Ethiopian Revenue Authority) | 1,218,000.00 | ||||
| Grand Total Including VAT (ETB) | 9,338,000.00 | ||||
1. Scope of Engagement: This Purchase Order authorizes the procurement of professional Electrical Engineer services to be rendered exclusively within the administrative boundaries of Addis Ababa, Ethiopia. All engineering work, site inspections, design reviews, and technical consultations shall be conducted in accordance with the Ethiopian National Electrical Code, the regulations of the Ethiopian Electric Utility (EEU), and the directives of the Ministry of Water and Energy of the Federal Democratic Republic of Ethiopia.
2. Commencement and Duration: The Electrical Engineer personnel engaged under this Purchase Order shall commence their duties no later than 1 July 2025. The engagement period shall be twelve (12) calendar months, subject to satisfactory performance reviews conducted quarterly by the Ethiopian Infrastructure Development Corporation's Project Management Office located in Addis Ababa.
3. Payment Schedule: Payment shall be processed in four equal quarterly installments of ETB 2,334,500.00 (inclusive of VAT) each, remitted via bank transfer to the Commercial Bank of Ethiopia account specified above. Invoices must be submitted to the procurement department no later than the last business day of each quarter. Late payments beyond the Net 30-day window shall accrue interest at the rate prescribed by the National Bank of Ethiopia.
4. Compliance and Licensing: All Electrical Engineer professionals assigned to this project must hold valid professional licenses issued by the Ethiopian Engineers Association and must be registered with the relevant professional body in Ethiopia. The supplier shall provide copies of all licenses, certificates of competency, and proof of professional indemnity insurance prior to the commencement date.
5. Deliverables and Reporting: The Electrical Engineer team shall submit monthly progress reports, updated single-line diagrams, load flow analyses, and risk assessment documents to the Project Manager. All deliverables must be submitted in both Amharic and English to ensure accessibility for all stakeholders operating within Addis Ababa municipal and federal agencies.
6. Health, Safety, and Environmental Compliance: All work performed under this Purchase Order in Addis Ababa shall strictly adhere to the Occupational Safety and Health Proclamation of Ethiopia (Proclamation No. 596/2003) and the environmental regulations enforced by the Environmental Protection Authority of Ethiopia. The supplier shall maintain a minimum of ETB 5,000,000.00 in professional liability insurance throughout the contract period.
7. Termination: Either party may terminate this Purchase Order with thirty (30) days written notice. In the event of termination for cause, the Ethiopian Infrastructure Development Corporation reserves the right to withhold payment for any incomplete or non-conforming deliverables. All intellectual property generated during the engagement within Addis Ababa shall remain the property of the Corporation.
8. Governing Law: This Purchase Order shall be governed by and construed in accordance with the Civil Code of Ethiopia and applicable commercial laws of the Federal Democratic Republic of Ethiopia. Any disputes arising from this Purchase Order shall be resolved through arbitration in Addis Ababa in accordance with the Ethiopian Arbitration and Conciliation Proclamation.
For and on behalf of the Buyer:
Ethiopian Infrastructure Development Corporation
Name: Dr. Hanna AlemuTitle: Chief Executive Officer
Signature: _________________________
Date: 15 June 2025
For and on behalf of the Supplier:
Addis Electrical Engineering Consultants PLC
Name: Eng. Dawit TadesseTitle: Managing Director
Signature: _________________________
Date: 15 June 2025 ⬇️ Download as DOCX Edit online as DOCX
Create your own Word template with our GoGPT AI prompt:
GoGPT