Purchase Order Electrical Engineer in Israel Jerusalem –Free Word Template Download with AI

Official Procurement Document — Electrical Engineer Professional Services — Israel Jerusalem

Issuing Organization (Buyer)

Jerusalem Municipal Infrastructure Authority

12 King George Street, Jerusalem 9100001, Israel

VAT No.: 51-234-567-8

Phone: +972-2-625-4300

Email: [email protected]

Authorized Representative: Mr. David Ben-Ami, Director of Procurement

Service Provider (Vendor)

Levantine Electrical Engineering Ltd.

45 Jaffa Road, Jerusalem 9100001, Israel

VAT No.: 51-876-543-2

Phone: +972-2-623-8899

Email: [email protected]

Lead Electrical Engineer: Ms. Sarah Cohen, P.E. (Licensed by the Israel Engineers Association)

Purchase Order No.: PO-JMI-2025-00487 Date of Issue: 14 June 2025
Project Reference: JMI-EE-2025-Phase3 Required Delivery Date: 30 September 2025
Work Location: Municipal Buildings, Old City District, Jerusalem, Israel
Currency: New Israeli Shekels (NIS / ILS) Payment Terms: Net 30 days from invoice acceptance
Governing Law: Laws of the State of Israel; Contract Law (Interpretation and Contracts) Law, 5733-1973

This Purchase Order is issued by the Jerusalem Municipal Infrastructure Authority to procure the professional services of a licensed Electrical Engineer and associated engineering team for the design, review, and commissioning of electrical infrastructure upgrades across three municipal buildings in the Old City District of Israel Jerusalem. The Electrical Engineer shall be fully licensed by the Israel Engineers Association (I.E.A.) and shall hold a valid Class A electrical design license as mandated by the Israeli Ministry of Energy and Water Resources. All work shall comply with the Israeli Electrical Standards (SII 230 series) and the Jerusalem Municipal Building Code.

No. Description of Service Quantity Unit Unit Price (NIS) Total (NIS)
1 Senior Electrical Engineer on-site supervision and design oversight for the Old City municipal complex electrical retrofit. Includes load calculations, single-line diagrams, and coordination with the Jerusalem Fire Brigade. 1 Full project (120 working days) 1,850,000.00 1,850,000.00
2 Preparation and submission of electrical design documentation for approval by the Jerusalem Planning and Building Committee. All drawings to be stamped by the licensed Electrical Engineer and submitted in both Hebrew and English per municipal requirements. 3 Building packages 48,500.00 145,500.00
3 Commissioning and testing of all electrical systems including switchgear, distribution panels, emergency lighting, and fire alarm integration. The Electrical Engineer shall issue a final commissioning certificate acceptable to the Israel Electricity Authority. 3 Buildings 32,000.00 96,000.00
4 Energy efficiency audit and sustainability report for the upgraded electrical infrastructure in Israel Jerusalem, aligned with the National Energy Plan and Jerusalem Green City Initiative. Report to include recommendations for solar PV integration on municipal rooftops. 1 Comprehensive report 78,000.00 78,000.00
5 Training sessions for municipal maintenance staff on the operation and safety protocols of the new electrical systems. Conducted by the lead Electrical Engineer and two junior engineers at the Jerusalem Municipal Training Center. 4 Half-day sessions 6,500.00 26,000.00
Subtotal: 2,195,500.00 NIS
VAT (18%): 395,190.00 NIS
Grand Total: 2,590,690.00 NIS
  1. Qualification Requirement: The Electrical Engineer assigned to this Purchase Order must hold an active license issued by the Israel Engineers Association and a valid electrical design permit from the Israeli Ministry of Energy. Proof of licensure shall be provided prior to commencement of work. The engineer must have a minimum of ten (10) years of experience in municipal and public infrastructure electrical projects within Israel.
  2. Compliance with Israeli Standards: All design, installation, and commissioning work shall strictly adhere to the Israeli Standards Institute (SII) codes, the Jerusalem Municipal Building Regulations, and the requirements of the Israel Electricity Authority. Any deviation must be approved in writing by the issuing authority of this Purchase Order.
  3. Work Location and Access: All services under this Purchase Order shall be performed at the designated municipal sites in Israel Jerusalem, specifically the Old City District buildings. The vendor shall coordinate access with the Jerusalem Police and the Old City Administration where applicable. Work hours shall comply with Jerusalem municipal operating schedules and Israeli labor regulations.
  4. Payment Schedule: Payment shall be made in three (3) installments: 30% upon acceptance of this Purchase Order and commencement of work; 40% upon completion of design documentation and receipt of Planning Committee approval; and 30% upon final commissioning, delivery of the energy audit report, and completion of all training sessions. Invoices shall be submitted in NIS and paid via bank transfer to the vendor's account in Israel within thirty (30) calendar days of invoice acceptance.
  5. Insurance and Liability: The vendor shall maintain comprehensive professional liability insurance with a minimum coverage of NIS 5,000,000, valid throughout the duration of this Purchase Order. The Electrical Engineer and all team members shall be covered under the vendor's workers' compensation policy as required by the Israeli National Insurance Institute (Bituach Leumi).
  6. Confidentiality and Data Protection: All technical drawings, load data, and infrastructure plans related to municipal buildings in Israel Jerusalem are classified as sensitive municipal records. The vendor and the Electrical Engineer shall comply with the Israeli Privacy Protection Law, 5741-1981, and the Jerusalem Municipal Data Security Policy. No documents shall be removed from municipal premises without written authorization.
  7. Dispute Resolution: Any dispute arising from this Purchase Order shall be resolved through binding arbitration in Jerusalem, Israel, in accordance with the Israeli Arbitration Law, 5728-1968. The arbitration shall be conducted in Hebrew, and the arbitrator's decision shall be final and enforceable in the Jerusalem District Court.
  8. Termination: Either party may terminate this Purchase Order with thirty (30) days' written notice. In the event of termination, the vendor shall be compensated for all work completed and documented up to the termination date, as verified by the project supervisor.
  9. Force Majeure: Neither party shall be liable for delays caused by events beyond reasonable control, including but not limited to natural disasters, government-mandated closures in Israel Jerusalem, or national security directives issued by the Israeli government.
  10. Warranty: The Electrical Engineer shall provide a two-year design warranty on all deliverables. Any design defect identified within this period shall be corrected at no additional cost to the issuing authority.

This Purchase Order becomes effective upon signature by both parties. The vendor acknowledges that acceptance of this Purchase Order constitutes a binding contractual obligation to deliver the Electrical Engineer services as specified herein, in full compliance with all applicable laws of the State of Israel and the regulations governing municipal procurement in Israel Jerusalem.

For the Issuing Organization:

Jerusalem Municipal Infrastructure Authority

Name: David Ben-Ami
Title: Director of Procurement
Signature: _________________________
Date: _______________

For the Service Provider:

Levantine Electrical Engineering Ltd.

Name: Sarah Cohen, P.E.
Title: Lead Electrical Engineer / Authorized Signatory
Signature: _________________________
Date: _______________

Purchase Order No. PO-JMI-2025-00487 | Issued in Jerusalem, Israel | This document is governed by the laws of the State of Israel

Jerusalem Municipal Infrastructure Authority — 12 King George Street, Jerusalem 9100001, Israel — All rights reserved

Document Classification: Official Municipal Procurement Record — Retain for a minimum of seven (7) years per Israeli Archives Law