Purchase Order Electrical Engineer in Nigeria Lagos –Free Word Template Download with AI
Meridian Infrastructure & Power Solutions Ltd.
14B Adeola Odeku Street, Victoria Island, Nigeria Lagos
RC No: 1487293 | VAT Reg: 10123456-0001 | Tel: +234 (0) 803 555 7214
Email: [email protected]
SUPPLIER / CONTRACTOR DETAILS| Company Name: VoltEdge Engineering & Consultancy Ltd. | Address: 22 Awolowo Road, Ikeja Industrial Estate, Nigeria Lagos |
| RC Number: 0987654 | VAT Registration: 20987654-0002 |
| Contact Person: Engr. Adewale Okafor, Lead Electrical Engineer | Phone / Email: +234 (0) 805 221 9934 / [email protected] |
| Bank Name: Zenith Bank Plc | Account No: 1012345678-01 |
| S/N | Description of Goods / Services | Qty | Unit (NGN) | Total (NGN) | Delivery Date |
|---|---|---|---|---|---|
| 1 | Professional services of a certified Electrical Engineer for the design, load calculation, and single-line diagram preparation of a 10 MVA substation at the Lekki Phase 1 commercial district, Nigeria Lagos | 1 | 4,500,000.00 | 4,500,000.00 | 30 June 2025 |
| 2 | Supply and installation of 3 × 250 kVA three-phase transformers (oil-immersed, 11/0.415 kV) including mounting structures, as specified by the assigned Electrical Engineer | 3 | 8,200,000.00 | 24,600,000.00 | 15 July 2025 |
| 3 | Supply of 11 kV and 0.415 kV switchgear panels (ABB or equivalent) with integrated protection relays, to be commissioned under the supervision of the project Electrical Engineer | 6 | 3,750,000.00 | 22,500,000.00 | 15 July 2025 |
| 4 | Supply and laying of 3-core 240 mm² XLPE armoured copper cable (11 kV) for underground feeder routes across the Nigeria Lagos site, including trenching, backfill, and cable protection ducts | 2,400 | 18,500.00 | 44,400,000.00 | 20 July 2025 |
| 5 | On-site commissioning, thermal imaging, and load-banking test conducted by the lead Electrical Engineer and a team of two (2) licensed technicians at the Nigeria Lagos project site | 1 | 2,800,000.00 | 2,800,000.00 | 25 July 2025 |
| 6 | Preparation of as-built drawings, O&M manuals, and statutory compliance documentation (NESREA, CAC, and Lagos State Ministry of Works) by the project Electrical Engineer | 1 | 1,200,000.00 | 1,200,000.00 | 28 July 2025 |
| Subtotal (NGN) | 100,000,000.00 | ||||
| VAT @ 7.5% (NGN) | 7,500,000.00 | ||||
| GRAND TOTAL (NGN) | 107,500,000.00 | ||||
- This Purchase Order constitutes a binding agreement between Meridian Infrastructure & Power Solutions Ltd. (hereinafter "the Buyer") and VoltEdge Engineering & Consultancy Ltd. (hereinafter "the Supplier") for the provision of Electrical Engineer professional services and associated electrical equipment for the Lekki Phase 1 substation project located in Nigeria Lagos.
- All services rendered by the Electrical Engineer shall comply with the Nigerian Electricity Regulatory Commission (NERC) standards, the Nigerian Code of Practice for Electrical Installations (NCEI), and all applicable regulations of the Lagos State Ministry of Works and Infrastructure.
- The Supplier shall assign a lead Electrical Engineer who holds a valid registration with the Council for the Regulation of Engineering in Nigeria (COREN) and a minimum of ten (10) years of experience in high-voltage substation design and commissioning in the Nigeria Lagos region.
- Delivery of all equipment and completion of all services shall be made at the project site in Nigeria Lagos, specifically at the Lekki Phase 1 commercial district coordinates provided in the annexed site plan. The Supplier bears all transportation, logistics, and customs clearance costs for imported materials.
- Payment shall be made in Nigerian Naira (NGN) via bank transfer to the account specified above within thirty (30) calendar days of receipt of a valid tax invoice and a signed certificate of completion issued by the Buyer's project manager. No payment shall be due until the Electrical Engineer has submitted all deliverables for the relevant line item.
- The Supplier warrants that all equipment supplied under this Purchase Order shall be new, of first quality, and free from defects for a period of twenty-four (24) months from the date of commissioning. Any defect discovered within the warranty period shall be rectified at the Supplier's sole cost.
- The Electrical Engineer and all personnel deployed to the Nigeria Lagos site shall comply with all occupational health and safety regulations, including but not limited to the Federal Ministry of Labour and Employment guidelines and the Lagos State Occupational Safety and Health Act.
- Any variation or amendment to this Purchase Order must be agreed upon in writing by both parties. Verbal instructions shall not constitute a valid amendment.
- In the event of a dispute arising from this Purchase Order, the parties shall first attempt to resolve the matter through good-faith negotiation. Failing resolution within fourteen (14) days, the dispute shall be referred to arbitration under the Arbitration and Conciliation Act (Cap A18, LFN 2004), with the seat of arbitration in Nigeria Lagos.
- This Purchase Order is governed by and shall be construed in accordance with the laws of the Federal Republic of Nigeria. The courts of Nigeria Lagos shall have exclusive jurisdiction over any matter not referred to arbitration.
- The Supplier shall maintain adequate professional indemnity and public liability insurance coverage for the duration of the project, with certificates of insurance to be provided to the Buyer prior to commencement of work at the Nigeria Lagos site.
For and on behalf of the Buyer:
Meridian Infrastructure & Power Solutions Ltd.
Name: Chiamaka Eze
Title: Head of Procurement
Signature: _________________________
Date: 12 June 2025
For and on behalf of the Supplier:
VoltEdge Engineering & Consultancy Ltd.
Name: Engr. Adewale Okafor
Title: Lead Electrical Engineer / Managing Director
Signature: _________________________
Date: _________________________