GoGPT GoSearch New DOC New XLS New PPT

OffiDocs favicon

Purchase Order Electrical Engineer in Singapore Singapore –Free Word Template Download with AI

Professional Services Procurement — Electrical Engineer Engagement

Jurisdiction: Singapore Singapore

Purchase Order No.: PO-SG-2025-04782
Date of Issue: 14 June 2025
Valid Until: 14 July 2025
Payment Terms: Net 30 Days
Currency: Singapore Dollars (SGD)
Incoterms: DAP Singapore Singapore
Parties to This Purchase Order

Purchaser (Buyer)

Company: Meridian Infrastructure Solutions Pte. Ltd.

Address: 12 Marina Boulevard, Level 34, Singapore Singapore 018982

UEN: 2019334567

Contact: Mr. Tan Wei Ming, Procurement Director

Email: [email protected]

Phone: +65 6842 7731

Supplier (Seller)

Company: VoltEdge Engineering Consultants Pte. Ltd.

Address: 88 Ayer Rajah Crescent, #05-12, Singapore Singapore 139953

UEN: 2017228901

Contact: Ms. Lim Siew Lan, Account Manager

Email: [email protected]

Phone: +65 6291 4458

Scope of Engagement — Electrical Engineer Services

This Purchase Order is issued by Meridian Infrastructure Solutions Pte. Ltd. (hereinafter referred to as the "Purchaser") to VoltEdge Engineering Consultants Pte. Ltd. (hereinafter referred to as the "Supplier") for the provision of professional Electrical Engineer services in connection with the design, review, and commissioning of the electrical infrastructure for the Meridian Logistics Hub Project located at Jurong East, Singapore Singapore. The Electrical Engineer engaged under this Purchase Order shall be a Chartered Engineer registered with the Professional Engineers Board (PEB) of Singapore Singapore and shall hold a valid Professional Engineer (PE) licence in the discipline of Electrical Engineering.

Line Items & Pricing
No. Description of Electrical Engineer Service Quantity Unit (Hours/Days) Unit Rate (SGD) Amount (SGD)
1 Senior Electrical Engineer — Preliminary design and load calculations for 3-phase power distribution system (415V/240V) 1 120 hours SGD 185.00 SGD 22,200.00
2 Electrical Engineer — Detailed design of switchgear, MCC panels, and transformer specifications per SS 352 and IEC 61439 standards 1 160 hours SGD 165.00 SGD 26,400.00
3 Electrical Engineer — Lightning protection and earthing system design in compliance with SS 586 and IEC 62305 1 80 hours SGD 165.00 SGD 13,200.00
4 Electrical Engineer — Fire alarm and emergency lighting system design per SS 452 and NFPA 72 1 60 hours SGD 155.00 SGD 9,300.00
5 Electrical Engineer — Site supervision, commissioning, and handover documentation at project site, Singapore Singapore 1 25 days SGD 1,200.00 SGD 30,000.00
6 Electrical Engineer — Preparation of as-built drawings, O&M manuals, and statutory submission documents for BCA and PUB, Singapore Singapore 1 40 hours SGD 155.00 SGD 6,200.00
Subtotal SGD 107,300.00
GST @ 9% (Singapore Singapore) SGD 9,657.00
TOTAL AMOUNT DUE SGD 116,957.00
Terms and Conditions
  1. This Purchase Order shall be governed by and construed in accordance with the laws of the Republic of Singapore Singapore. Any disputes arising from this Purchase Order shall be resolved through arbitration under the rules of the Singapore International Arbitration Centre (SIAC).
  2. The Electrical Engineer assigned to this engagement must hold a valid Professional Engineer (PE) licence issued by the Professional Engineers Board of Singapore Singapore and must maintain professional indemnity insurance of no less than SGD 2,000,000 per occurrence for the duration of the contract.
  3. All deliverables under this Purchase Order shall comply with the Singapore Standards (SS), the Electricity Act 1965 of Singapore Singapore, and the relevant guidelines issued by the Energy Market Authority (EMA) and the Building and Construction Authority (BCA) of Singapore Singapore.
  4. Payment shall be made within thirty (30) calendar days from the date of receipt of a valid tax invoice from the Supplier. Late payments shall attract interest at the rate of 5% per annum as stipulated under the Late Payment of Interest on Debts Act of Singapore Singapore.
  5. The Supplier warrants that all Electrical Engineer services rendered under this Purchase Order shall be performed with due professional care, skill, and diligence in accordance with the standards of practice of the Institution of Engineers, Singapore Singapore (IES).
  6. Any variation or amendment to the scope of this Purchase Order must be agreed upon in writing by both parties. No verbal instructions shall constitute a valid variation to the Electrical Engineer engagement.
  7. The Supplier shall not subcontract any portion of the Electrical Engineer services without prior written consent from the Purchaser. Any approved subcontractor shall be bound by the same terms and conditions as set forth in this Purchase Order.
  8. All intellectual property rights in the design documents, calculations, and reports produced by the Electrical Engineer under this Purchase Order shall vest in the Purchaser upon full payment of the total amount due.
  9. The Supplier shall comply with all applicable data protection requirements under the Personal Data Protection Act (PDPA) of Singapore Singapore in handling any personal data received in the course of this engagement.
  10. This Purchase Order becomes effective upon signature by both parties and shall remain in force until all obligations, including warranty and defect liability periods, have been fully discharged.
Acceptance & Authorization

By signing below, both parties acknowledge and agree to all terms, conditions, and specifications set forth in this Purchase Order for the engagement of Electrical Engineer services in Singapore Singapore.

For and on behalf of the Purchaser
Meridian Infrastructure Solutions Pte. Ltd.

Name: Tan Wei Ming
Title: Procurement Director
Date: _______________
For and on behalf of the Supplier
VoltEdge Engineering Consultants Pte. Ltd.

Name: Lim Siew Lan
Title: Account Manager
Date: _______________

This Purchase Order (PO-SG-2025-04782) is issued for the procurement of Electrical Engineer professional services in Singapore Singapore. This document is the property of Meridian Infrastructure Solutions Pte. Ltd. and shall not be reproduced or distributed without written consent. All references to Singapore Singapore denote the jurisdiction and operational base for this engagement. Document generated in accordance with the Companies Act 2015 and the Professional Engineers Act 2002 of Singapore Singapore.

⬇️ Download as DOCX Edit online as DOCX

Create your own Word template with our GoGPT AI prompt:

GoGPT
×
Advertisement
❤️Shop, book, or buy here — no cost, helps keep services free.