Purchase Order Electrical Engineer in Sudan Khartoum –Free Word Template Download with AI
Professional Services Procurement Document
Issued in Sudan Khartoum, Republic of the Sudan
PO No: SUD-KRT-2025-EE-0472
Date of Issue: 15 June 2025
Valid Until: 15 September 2025
1. Parties to This Purchase OrderPurchasing Party (Buyer)
Company: Nile Valley Infrastructure & Power Solutions Ltd.
Address: 42 Al-Murad Street, Omdurman District, Sudan Khartoum, Republic of the Sudan
Registration No: SUD-COM-2019-8834
Tax ID: 102-447-8821
Contact: Eng. Mahmoud El-Tahir, Procurement Director
Email: [email protected]
Phone: +249-183-445-672
Supplier / Service Provider (Seller)
Company: Khartoum Electrical Engineering Consultants (KEEC)
Address: 18 Al-Nil Road, Shambat Industrial Zone, Sudan Khartoum, Republic of the Sudan
Registration No: SUD-COM-2016-5521
Tax ID: 102-331-9904
Contact: Dr. Aisha Ibrahim Hassan, Managing Director
Email: [email protected]
Phone: +249-183-221-905
2. Description of Purchase Order ScopeThis Purchase Order is issued by Nile Valley Infrastructure & Power Solutions Ltd. to formally procure the professional services of a qualified Electrical Engineer for the duration of the Al-Nil Substation Expansion Project located in the Omdurman sector of Sudan Khartoum. The Electrical Engineer engaged under this Purchase Order shall be responsible for the design review, load calculation, protective relay coordination, and commissioning oversight of all medium-voltage and low-voltage electrical systems within the project scope. The Electrical Engineer must hold a valid professional license issued by the Sudanese Engineers Syndicate and possess a minimum of ten (10) years of documented experience in power distribution systems within the Sudan Khartoum metropolitan area and its surrounding industrial zones.
3. Line Items and Pricing| Item No. | Description of Service | Quantity | Unit | Unit Price (SDG) | Total (SDG) |
|---|---|---|---|---|---|
| 01 | Engagement of Senior Electrical Engineer for full project duration (design, review, and commissioning phases) | 1 | Professional | 1,250,000 | 1,250,000 |
| 02 | Electrical Engineer on-site supervision at Sudan Khartoum project site (minimum 5 days per week) | 12 | Months | 480,000 | 5,760,000 |
| 03 | Preparation of as-built electrical drawings and technical documentation by the Electrical Engineer | 1 | Lot | 320,000 | 320,000 |
| 04 | Protective relay setting calculations and coordination study performed by the Electrical Engineer | 1 | Study | 275,000 | 275,000 |
| 05 | Commissioning test reports and final handover documentation by the Electrical Engineer | 1 | Lot | 195,000 | 195,000 |
| Subtotal: | 7,800,000 | ||||
| VAT (10%): | 780,000 | ||||
| GRAND TOTAL (SDG): | 8,580,000 | ||||
- Governing Law: This Purchase Order shall be governed by and construed in accordance with the laws of the Republic of the Sudan, specifically the Sudanese Commercial Code and the Sudanese Engineers Syndicate regulations applicable to the practice of an Electrical Engineer within the jurisdiction of Sudan Khartoum.
- Payment Terms: Payment shall be made in three (3) equal installments: 30% upon execution of this Purchase Order, 40% upon completion of the design and review phase, and 30% upon final commissioning and handover. All payments shall be made via bank transfer to the account designated by KEEC in a Sudanese commercial bank operating in Sudan Khartoum.
- Qualification Requirement: The Electrical Engineer assigned to this Purchase Order must submit a certified copy of their professional license, academic credentials (minimum B.Sc. in Electrical Engineering from a recognized institution), and a detailed CV demonstrating relevant experience in power substation projects within Sudan Khartoum prior to commencing work.
- Project Duration: The engagement of the Electrical Engineer under this Purchase Order shall commence on 1 July 2025 and is expected to conclude by 30 June 2026, subject to project milestones and any mutually agreed extensions in writing.
- Site Location: All on-site duties of the Electrical Engineer shall be performed at the Al-Nil Substation site, Omdurman, Sudan Khartoum. The Purchasing Party shall provide safe access, personal protective equipment (PPE), and a designated workspace at the project site.
- Confidentiality: The Electrical Engineer shall treat all project data, system schematics, load profiles, and operational parameters as strictly confidential. This obligation survives the termination of this Purchase Order for a period of five (5) years.
- Termination: Either party may terminate this Purchase Order with thirty (30) days written notice. In the event of termination, the Electrical Engineer shall be compensated for all work completed and documented up to the date of termination.
- Dispute Resolution: Any dispute arising from this Purchase Order shall first be subject to amicable negotiation. Failing resolution within thirty (30) days, the matter shall be referred to the competent commercial court in Sudan Khartoum.
- Compliance: The Electrical Engineer shall comply with all applicable Sudanese electrical codes, the Sudanese Standards and Metrology Organization (SSMO) regulations, and all safety directives issued by the Ministry of Electricity and Energy in Sudan Khartoum.
By signing below, both parties acknowledge and agree to all terms, conditions, and obligations set forth in this Purchase Order for the engagement of the Electrical Engineer in Sudan Khartoum. This document constitutes a binding commercial agreement upon execution by both authorized representatives.
For and on behalf of the Purchasing Party:
Nile Valley Infrastructure & Power Solutions Ltd.
Eng. Mahmoud El-Tahir
Procurement Director
Date: _______________
For and on behalf of the Supplier:
Khartoum Electrical Engineering Consultants (KEEC)
Dr. Aisha Ibrahim Hassan
Managing Director
Date: _______________
⬇️ Download as DOCX Edit online as DOCXCreate your own Word template with our GoGPT AI prompt: