GoGPT GoSearch New DOC New XLS New PPT

OffiDocs favicon

Purchase Order Electrical Engineer in Turkey Ankara –Free Word Template Download with AI

Professional Services Procurement Document

Electrical Engineer Consulting & Technical Services

Region: Turkey Ankara

Purchase Order No.: PO-ANK-2025-00472
Date of Issue: 14 June 2025
Valid Until: 14 September 2025
Priority: Standard
Project Reference: EEE-TRK-ANK-2025
Currency: TRY (Turkish Lira)
1. Buyer Information
Company Name: Anadolu Infrastructure Development A.Ş. Tax ID (VKN): 1234567890
Address: Kızılay Mahallesi, Atatürk Bulvarı No: 142, Çankaya, 06700 Ankara, Turkey Contact: [email protected]
Authorized Representative: Mr. Emre Yılmaz, Chief Procurement Officer Phone: +90 312 445 6789
2. Supplier / Service Provider Information
Company Name: Marmara Electrical Engineering Consultancy Ltd. Tax ID (VKN): 9876543210
Address: Tunalı Hilmi Caddesi No: 58, Çankaya, 06680 Ankara, Turkey Contact: [email protected]
Lead Electrical Engineer: Dr. Selin Kaya, P.E. (Licensed Electrical Engineer, TMMOB No. 45210) Phone: +90 312 223 4567
3. Scope of Work – Electrical Engineer Services in Turkey Ankara

This Purchase Order is issued by Anadolu Infrastructure Development A.Ş. to formally engage the services of a qualified Electrical Engineer and associated technical team for the design, review, and commissioning of electrical infrastructure systems for the new commercial and residential complex located in the Çankaya district of Turkey Ankara. The Electrical Engineer shall be responsible for all aspects of electrical system design in compliance with Turkish Electrical Installation Regulations (Elektrik Tesisleri Yönetmeliği), IEC standards, and local municipal requirements specific to the Turkey Ankara metropolitan area.

4. Line Items and Pricing
Item No. Description Quantity Unit Unit Price (TRY) Total (TRY)
01 Senior Electrical Engineer – Full system design (power distribution, lighting, grounding, and fire alarm systems) for the 12-story complex in Turkey Ankara 1 Project 485,000.00 485,000.00
02 Electrical Engineer – Site supervision and commissioning support during construction phase (minimum 6 months on-site in Turkey Ankara) 6 Months 92,500.00 555,000.00
03 Electrical Engineer – Regulatory compliance review and submission of technical documentation to Ankara Metropolitan Municipality (Büyükşehir Belediyesi) electrical inspection division 1 Package 78,000.00 78,000.00
04 Electrical Engineer – Energy efficiency audit and smart-grid integration design for the Turkey Ankara project site 1 Report 125,000.00 125,000.00
05 Electrical Engineer – Emergency response plan and safety protocol documentation per Turkish occupational health and safety law (6331) 1 Document 45,000.00 45,000.00
TOTAL PURCHASE ORDER VALUE (VAT 20% included) 1,288,000.00
5. Payment Terms
  • Advance Payment: 30% of the total Purchase Order value (TRY 386,400.00) shall be paid within 10 business days of the signed Purchase Order acknowledgment, via bank transfer to the supplier's account at Ziraat Bankası, Ankara branch.
  • Milestone Payment 1: 25% (TRY 322,000.00) upon completion and approval of the full electrical design package by the Buyer's internal review committee.
  • Milestone Payment 2: 25% (TRY 322,000.00) upon successful submission and acceptance of all documentation by the Turkey Ankara municipal electrical inspection authority.
  • Final Payment: 20% (TRY 257,600.00) upon completion of on-site commissioning, final inspection sign-off, and delivery of as-built drawings.
  • All payments are subject to the receipt of a valid fatura (invoice) and the applicable KDV (VAT) documentation as required by Turkish tax law.
6. Delivery and Execution Schedule
  • Design Phase: Commence within 15 calendar days of Purchase Order acceptance; deliverable within 90 calendar days.
  • Regulatory Submission: Within 30 calendar days of design approval.
  • Site Supervision: Aligned with the construction timeline in Turkey Ankara; minimum 6 consecutive months of on-site presence.
  • Commissioning & Handover: Within 15 calendar days of construction completion.
  • All deliverables must be submitted in both Turkish and English to satisfy the requirements of the Turkey Ankara project stakeholders and international investors.
7. Terms and Conditions
  • This Purchase Order is governed by the laws of the Republic of Turkey. Any disputes arising from this Purchase Order shall be resolved by the competent courts in Ankara, Turkey.
  • The Electrical Engineer engaged under this Purchase Order must hold a valid TMMOB (Turkish Chamber of Engineers) professional license and a minimum of 10 years of experience in commercial and residential electrical systems in Turkey Ankara or equivalent metropolitan areas.
  • The supplier shall maintain professional liability insurance with a minimum coverage of TRY 5,000,000 for the duration of the contract.
  • The Buyer reserves the right to request revisions to the electrical design at no additional cost, provided such revisions do not exceed 15% of the original scope defined in this Purchase Order.
  • Confidentiality: All technical drawings, system schematics, and proprietary data generated under this Purchase Order for the Turkey Ankara project shall remain the exclusive property of the Buyer. The Electrical Engineer and all sub-consultants shall sign a Non-Disclosure Agreement (NDA) prior to commencing work.
  • Force Majeure: Neither party shall be liable for delays caused by events beyond reasonable control, including but not limited to natural disasters, government-mandated shutdowns in Turkey Ankara, or pandemics, as defined under Turkish Civil Code Article 136.
  • Termination: Either party may terminate this Purchase Order with 30 days' written notice. In the event of termination, the Buyer shall pay for all services rendered up to the termination date, as documented in the Purchase Order line items.
  • The Electrical Engineer shall comply with all applicable environmental regulations of the Ankara Metropolitan Municipality and the Ministry of Environment, Urbanization and Climate Change of the Republic of Turkey.
8. Acceptance and Authorization

By signing below, both parties acknowledge and agree to all terms, conditions, and specifications outlined in this Purchase Order for the engagement of the Electrical Engineer for the specified project in Turkey Ankara. This document constitutes a binding agreement upon execution by both authorized representatives.

For the Buyer:
Anadolu Infrastructure Development A.Ş.

Name: Emre Yılmaz
Title: Chief Procurement Officer
Signature: _________________________
Date: _________________________

For the Supplier:
Marmara Electrical Engineering Consultancy Ltd.

Name: Dr. Selin Kaya
Title: Lead Electrical Engineer / Managing Director
Signature: _________________________
Date: _________________________

This Purchase Order (PO-ANK-2025-00472) is a controlled document issued for the procurement of Electrical Engineer professional services in Turkey Ankara. Unauthorized reproduction or distribution is prohibited. For inquiries, contact the Procurement Department at Anadolu Infrastructure Development A.Ş., Ankara, Turkey.

Document Version: 1.0 | Classification: Commercial in Confidence | Page 1 of 1

⬇️ Download as DOCX Edit online as DOCX

Create your own Word template with our GoGPT AI prompt:

GoGPT
×
Advertisement
❤️Shop, book, or buy here — no cost, helps keep services free.