Purchase Order Electrician in Egypt Cairo –Free Word Template Download with AI

Professional Electrician Services — Egypt Cairo

PO No. EGY-CAI-2025-04782

Date of Issue: 15 June 2025
Valid Until: 15 July 2025
Currency: Egyptian Pound (EGP)
Payment Terms: Net 30 Days
Delivery Location: Cairo, Egypt
Priority: Standard
1. Purchasing Party (Buyer)
Company Name Nile Delta Construction & Development Co.
Address 142 El Tahrir Street, Downtown District, Cairo, Egypt 11511
Tax Registration No. 552-883-1047
Contact Person Eng. Mahmoud El-Sayed, Project Manager
Email / Phone [email protected] / +20 2 2574 8831
2. Supplier / Service Provider (Electrician Contractor)
Company Name Cairo Volt Electrical Services & Maintenance LLC
Address 28 Gamet El-Debbab Street, Maadi District, Cairo, Egypt 12577
Tax Registration No. 771-204-5593
Licence No. Electrical Contractor Licence ELC-2019-4482 (Issued by Cairo Governorate)
Contact Person Mr. Khaled Ibrahim, Lead Electrician & Operations Director
Email / Phone [email protected] / +20 2 2523 6610
3. Scope of Work & Line Items

This Purchase Order authorizes the above-named Electrician contractor to perform comprehensive electrical installation, inspection, and maintenance services at the buyer's commercial premises located in the New Cairo Business Park, Cairo, Egypt. All work shall comply with the Egyptian Electrical Code (EEC), IEC 60364 standards, and the regulations enforced by the Egyptian Electricity Holding Company (EEHC).

Item # Description of Electrician Service Qty Unit Unit Price (EGP) Total (EGP)
01 Full electrical wiring installation for a 4,200 sqm commercial office building, including conduit routing, cable pulling, and junction box installation 1 Lot 385,000.00 385,000.00
02 Installation and commissioning of three (3) industrial-grade distribution panels (630A) with protective relays and circuit breakers 3 Units 42,500.00 127,500.00
03 Emergency backup generator connection (250 kVA) including transfer switch installation and load balancing 1 Lot 98,000.00 98,000.00
04 LED lighting retrofit for all floors (approximately 1,850 fixtures) including dimmer controls and motion sensors 1,850 Fixtures 1,250.00 2,312,500.00
05 Thermal imaging inspection and thermographic report of existing electrical infrastructure 1 Report 18,500.00 18,500.00
06 Earthing and lightning protection system installation per Egyptian Civil Defence requirements 1 Lot 76,000.00 76,000.00
07 Annual preventive maintenance contract for all electrical systems (12 months, quarterly visits) 4 Visits 12,000.00 48,000.00
Subtotal 2,965,500.00
VAT (14% — Egyptian Tax Authority) 415,170.00
GRAND TOTAL 3,380,670.00
4. Delivery & Schedule
Milestone Target Completion Date Location
Site survey and preliminary inspection 22 June 2025 New Cairo Business Park, Cairo, Egypt
Wiring and conduit installation (Items 01, 06) 15 August 2025 New Cairo Business Park, Cairo, Egypt
Panel and generator installation (Items 02, 03) 30 August 2025 New Cairo Business Park, Cairo, Egypt
Lighting retrofit (Item 04) 20 September 2025 New Cairo Business Park, Cairo, Egypt
Final inspection, testing, and handover 5 October 2025 New Cairo Business Park, Cairo, Egypt
5. Terms & Conditions
  1. Compliance: The Electrician contractor shall ensure all work performed under this Purchase Order adheres to the Egyptian Electrical Code, IEC 60364, and all applicable regulations of the Cairo Governorate and the Egyptian Electricity Holding Company. Non-compliance shall result in immediate work stoppage at the contractor's expense.
  2. Warranty: All electrical materials and workmanship are covered by a minimum two-year warranty from the date of final acceptance. The Electrician shall rectify any defects arising within this period at no additional cost to the buyer.
  3. Payment Schedule: 30% advance payment upon signing this Purchase Order; 40% upon completion of wiring and panel installation; 30% upon final inspection and handover. All payments shall be made via bank transfer to the supplier's account registered with the Egyptian Tax Authority.
  4. Insurance: The Electrician contractor shall maintain comprehensive liability insurance and workers' compensation coverage for all personnel operating in Cairo, Egypt, with a minimum coverage of EGP 5,000,000 per occurrence.
  5. Permits & Approvals: The supplier is responsible for obtaining all necessary electrical work permits from the Cairo Governorate and the local EEHC branch prior to commencing any installation work.
  6. Penalties: For each calendar day of delay beyond the agreed completion date, the Electrician contractor shall pay a penalty of 0.5% of the total Purchase Order value per day, capped at 10% of the total value.
  7. Dispute Resolution: Any disputes arising from this Purchase Order shall be resolved through arbitration in Cairo, Egypt, in accordance with the rules of the Egyptian Arbitration Centre, and the governing law shall be the laws of the Arab Republic of Egypt.
  8. Force Majeure: Neither party shall be liable for delays caused by events beyond reasonable control, including but not limited to natural disasters, government-mandated shutdowns, or civil unrest in the Cairo metropolitan area.
  9. Confidentiality: Both parties agree to maintain strict confidentiality regarding the terms of this Purchase Order and any proprietary information exchanged during the course of the Electrician services engagement.
6. Authorization & Signatures

For the Purchasing Party (Buyer)

Nile Delta Construction & Development Co.

Eng. Mahmoud El-Sayed
Project Manager
Date: _______________

For the Supplier (Electrician Contractor)

Cairo Volt Electrical Services & Maintenance LLC

Mr. Khaled Ibrahim
Lead Electrician & Operations Director
Date: _______________

This Purchase Order (PO No. EGY-CAI-2025-04782) is issued for Electrician services to be executed in Egypt Cairo and is governed by the laws of the Arab Republic of Egypt. This document is valid only when signed and stamped by both authorized parties. Any amendments must be made in writing and countersigned by both parties. © 2025 Nile Delta Construction & Development Co. All rights reserved.