Purchase Order Environmental Engineer in Argentina Buenos Aires –Free Word Template Download with AI
| Company Name | Grupo Ambiental del Plata S.A. |
|---|---|
| CUIT | 30-71234567-8 |
| Address | Av. Corrientes 2340, Piso 12, C1043AAC, Argentina Buenos Aires |
| Contact Person | Ing. María Elena Rodríguez – Procurement Director |
| Email / Phone | [email protected] / +54 11 4321-5678 |
| Professional Name | Ing. Carlos Alberto Fernández – Environmental Engineer |
|---|---|
| Professional Registration | Matrícula Profesional N° 12.345 – Colegio de Ingenieros de la Provincia de Buenos Aires |
| CUIL | 20-12345678-9 |
| Office Address | Calle Sarmiento 876, Piso 5, C1083AAE, Argentina Buenos Aires |
| Specialization | Environmental Impact Assessment, Water Quality Management, Waste Treatment Systems, Regulatory Compliance (Ley 25.675) |
This Purchase Order is issued by Grupo Ambiental del Plata S.A. to formally engage the services of a qualified Environmental Engineer for the execution of environmental compliance and sustainability projects located in Argentina Buenos Aires. The Environmental Engineer shall provide the following professional services as detailed in the line items below. All work shall be performed in strict accordance with the environmental regulations established by the National Environment Ministry of Argentina, the Buenos Aires City Environmental Agency (Agencia de Protección Ambiental de la Ciudad de Buenos Aires), and applicable international standards.
4. Line Items and Pricing| Item | Description of Service | Duration | Unit Price (ARS) | Amount (ARS) |
|---|---|---|---|---|
| 01 | Environmental Impact Assessment (EIA) for the industrial facility located in the Puerto Madero district, Argentina Buenos Aires. Includes baseline environmental data collection, impact prediction modeling, and mitigation strategy development. | 90 days | 1,250,000 | 1,250,000 |
| 02 | Water quality monitoring and treatment system design for the Río de la Plata shoreline operations in Argentina Buenos Aires. The Environmental Engineer shall conduct quarterly sampling, laboratory analysis coordination, and produce compliance reports. | 12 months | 875,000 | 875,000 |
| 03 | Waste management and disposal compliance audit for three (3) commercial sites in the City of Buenos Aires, Argentina. The Environmental Engineer shall prepare a comprehensive audit report aligned with Ley 24.051 (National Waste Law). | 45 days | 620,000 | 620,000 |
| 04 | Regulatory permitting support and liaison with the Buenos Aires City Environmental Agency. The Environmental Engineer shall prepare, submit, and follow up on all environmental permits required for the project expansion in Argentina Buenos Aires. | Ongoing (6 months) | 450,000 | 450,000 |
| 05 | Environmental management system (EMS) implementation and ISO 14001 certification preparation for the corporate headquarters in Argentina Buenos Aires. Includes staff training sessions (minimum 4 workshops). | 6 months | 980,000 | 980,000 |
| TOTAL AMOUNT (in Argentine Pesos – ARS): | 4,175,000 | |||
| VAT (IVA 21%): | 876,750 | |||
| GRAND TOTAL (ARS): | 5,051,750 | |||
- Payment Terms: Payment shall be made in three (3) equal installments: 40% upon execution of this Purchase Order, 40% upon completion of the mid-project milestone review, and 20% upon final delivery and acceptance of all deliverables. Payments shall be processed via bank transfer to the account designated by the Environmental Engineer.
- Deliverables: The Environmental Engineer shall submit all reports, assessments, and documentation in both Spanish and English. All deliverables must be provided in digital (PDF) format and, where required, in three (3) hard-bound copies.
- Compliance: The Environmental Engineer warrants that all services rendered under this Purchase Order shall comply with the environmental legislation of Argentina, including but not limited to Ley 25.675 (General Environmental Regime), Ley 24.051 (National Waste Law), and all decrees and resolutions issued by the Buenos Aires City Environmental Agency.
- Confidentiality: The Environmental Engineer agrees to maintain strict confidentiality regarding all proprietary data, trade secrets, and operational information of Grupo Ambiental del Plata S.A. This obligation shall survive the termination of this Purchase Order for a period of five (5) years.
- Insurance: The Environmental Engineer shall maintain professional liability insurance with a minimum coverage of ARS 10,000,000 for the duration of the engagement. A certificate of insurance shall be provided prior to commencement of work.
- Termination: Either party may terminate this Purchase Order with thirty (30) days written notice. In the event of termination, the Environmental Engineer shall be compensated for all services rendered up to the date of termination, plus reasonable costs incurred in the wind-down of ongoing activities in Argentina Buenos Aires.
- Dispute Resolution: Any dispute arising from this Purchase Order shall be resolved through mediation in accordance with the rules of the Buenos Aires Chamber of Commerce. If mediation fails, the matter shall be submitted to the competent civil and commercial courts of Argentina Buenos Aires.
- Governing Law: This Purchase Order shall be governed by and construed in accordance with the laws of the Argentine Republic, with specific reference to the commercial and civil codes applicable in the jurisdiction of Argentina Buenos Aires.
- Force Majeure: Neither party shall be liable for delays or failures in performance resulting from events beyond reasonable control, including but not limited to natural disasters, government actions, or public health emergencies affecting the Argentina Buenos Aires metropolitan area.
By signing below, both parties acknowledge and agree to all terms, conditions, and obligations set forth in this Purchase Order. The undersigned Environmental Engineer confirms acceptance of the scope of work, timeline, and compensation structure as outlined herein for the project located in Argentina Buenos Aires.
For: Grupo Ambiental del Plata S.A.Ing. María Elena Rodríguez
Procurement Director
Date: _______________ For: Environmental Engineer (Vendor)
Ing. Carlos Alberto Fernández
Matrícula N° 12.345
Date: _______________ ⬇️ Download as DOCX Edit online as DOCX
Create your own Word template with our GoGPT AI prompt:
GoGPT