Purchase Order Firefighter in Turkey Ankara –Free Word Template Download with AI
Firefighter Equipment & Protective Gear Procurement
Republic of Turkey — Ankara Metropolitan Fire Department
| Role | Entity | Address | Contact |
|---|---|---|---|
| Buyer (Purchasing Authority) | Ankara Metropolitan Fire Department (Ankara Büyükşehir Belediyesi Çevre Koruma ve Kontrol Daire Baškanlíçí – Çevre Yönetimi & Yangín Müdürlüüü) | Atatürk Bulvarı No: 105, 06040 Kâğıthane, Ankara, Turkey | [email protected] +90 312 445 6789 |
| Supplier (Vendor) | ProShield Firefighter Equipment Ltd. (ProShield Yangín Güvenlik Ekipmanları A.Ş.) | Organize Sanayi Bölgesi 12. Cadde No: 44, 06420 Sincan, Ankara, Turkey | [email protected] +90 312 876 5432 |
This Purchase Order is issued by the Ankara Metropolitan Fire Department to procure a comprehensive set of Firefighter personal protective equipment (PPE), structural firefighting gear, and operational accessories. The entire procurement is intended for deployment and daily operational use by Firefighter personnel stationed across all fire stations in Turkey Ankara, including the central command post in Kâğıthane, the Sincan industrial zone station, the Etimesgut airport support unit, and the Gölbaší rural fire brigade. This Purchase Order supersedes all prior quotations and informal agreements between the parties and constitutes the sole binding document governing the transaction described herein.
| Item No. | Description | Specification / Standard | Qty | Unit Price (TRY) | Line Total (TRY) |
|---|---|---|---|---|---|
| 01 | Firefighter Structural Turnout Jacket (NOMEX/ARONIC blend, 3-layer) | EN 469:2020, NFPA 2112 compliant | 250 | 18,500.00 | 4,625,000.00 |
| 02 | Firefighter Structural Turnout Trousers (NOMEX/ARONIC blend, 3-layer) | EN 469:2020, NFPA 2112 compliant | 250 | 16,200.00 | 4,050,000.00 |
| 03 | Firefighter Helmet (5-point, with face shield and neck curtain) | EN 443:2008, NFPA 1971 compliant | 250 | 7,800.00 | 1,950,000.00 |
| 04 | Firefighter Self-Contained Breathing Apparatus (SCBA), 30-min, 300 bar | EN 137:2006, NFPA 1981 compliant | 120 | 42,000.00 | 5,040,000.00 |
| 05 | Firefighter Thermal Imaging Camera (TIC), 640×480 resolution | EN 60950-1, IP67 rated | 40 | 38,500.00 | 1,540,000.00 |
| 06 | Firefighter Protective Gloves (3-layer, heat-resistant to 350°C) | EN 407:2018, EN 420:2003 | 500 | 2,400.00 | 1,200,000.00 |
| 07 | Firefighter Safety Boots (steel toe, metatarsal guard, heat-resistant sole) | EN ISO 20345:2011 S3, EN 469:2020 | 250 | 6,900.00 | 1,725,000.00 |
| 08 | Firefighter Proximity & Gas Detector (multi-gas, 4-sensor) | EN 60079-0, ATEX Zone 1 | 200 | 12,300.00 | 2,460,000.00 |
| 09 | Firefighter Emergency Escape Breathing Apparatus (EEBA), 10-min | EN 137:2006 | 250 | 9,800.00 | 2,450,000.00 |
| 10 | Firefighter Radio Communication Set (UHF/VHF, IP68, 20 km range) | ETSI EN 300 221, EN 301 489 | 250 | 8,200.00 | 2,050,000.00 |
| SUBTOTAL | 27,090,000.00 | ||||
| VAT (KDV) – 20% | 5,418,000.00 | ||||
| GRAND TOTAL (TRY) | 32,508,000.00 | ||||
All Firefighter equipment listed in this Purchase Order shall be delivered, fully packaged, labeled, and ready for immediate operational deployment to the Ankara Metropolitan Fire Department central warehouse located at Atatürk Bulvarı No: 105, Kâğıthane, Turkey Ankara. The supplier shall bear all transportation, insurance, and customs clearance costs (if applicable for imported components) up to the point of delivery in Turkey Ankara. Delivery must be completed no later than 15 August 2025. Partial deliveries are permitted provided that each shipment is accompanied by a packing list, certificate of conformity, and a copy of this Purchase Order reference number. The supplier must ensure that all Firefighter gear is stored in climate-controlled conditions during transit to prevent degradation of protective materials.
Payment for this Purchase Order shall be made in Turkish Lira (TRY) via bank transfer to the supplier’s designated account. The payment schedule is as follows:
- 30% Advance Payment (TRY 9,752,400.00): Due within 10 business days of the signed acceptance of this Purchase Order by both parties.
- 50% Progress Payment (TRY 16,254,000.00): Due upon verified delivery of 70% of all Firefighter items to the Turkey Ankara warehouse, confirmed by the Ankara Fire Department’s Quality Assurance Officer.
- 20% Final Payment (TRY 6,501,600.00): Due within 30 days of final delivery, full inspection, and issuance of the Certificate of Acceptance by the Ankara Metropolitan Fire Department.
All Firefighter equipment procured under this Purchase Order must comply with the applicable European Norms (EN) and, where specified, National Fire Protection Association (NFPA) standards. The supplier shall provide, with each shipment, a Certificate of Conformity (CoC), Material Safety Data Sheets (MSDS), and a 5-year manufacturer’s warranty for all structural Firefighter PPE items. The Ankara Metropolitan Fire Department reserves the right to conduct random sampling and third-party laboratory testing at an accredited facility in Turkey Ankara (e.g., TÜBĨT–Standards Research and Application Center) at the supplier’s expense if any non-conformity is suspected. Failure to meet the specified standards will result in immediate rejection of the affected lot and a mandatory replacement within 15 calendar days at no additional cost to the buyer.
As part of this Purchase Order, the supplier shall provide on-site training for a minimum of 40 Firefighter personnel at the Ankara Fire Academy (Ankara Çevre Koruma ve Kontrol Daire Baškanlíçí Eğitim Merkezi) in Turkey Ankara. The training program shall cover proper donning/doffing procedures, SCBA operation and maintenance, thermal imaging camera usage, and multi-gas detector calibration. A minimum of two (2) full-day training sessions shall be conducted within 30 days of final delivery. Additionally, the supplier shall provide a 24/7 technical support hotline and guarantee spare parts availability for a period of ten (10) years from the date of final delivery.
- This Purchase Order is governed by the laws of the Republic of Turkey. Any disputes arising from this Purchase Order shall be resolved by the competent courts in Turkey Ankara.
- The supplier shall not subcontract any portion of the manufacturing or assembly of Firefighter equipment without prior written consent from the Ankara Metropolitan Fire Department.
- Force majeure events, including but not limited to natural disasters affecting the Turkey Ankara region, may extend delivery deadlines by a mutually agreed period not exceeding 30 days.
- Confidentiality: All operational details, personnel numbers, and station locations referenced in this Purchase Order are classified as sensitive public safety information and shall not be disclosed to third parties.
- Penalty for late delivery: A penalty of 0.5% of the total Purchase Order value per calendar day of delay, capped at 10% of the total value, shall be deducted from the final payment.
- This Purchase Order becomes effective upon signature by both authorized representatives and remains valid until full performance of all obligations by both parties.
For and on behalf of the Buyer:
Ankara Metropolitan Fire Department
Name:Title: Director of Procurement
Signature & Date:
For and on behalf of the Supplier:
ProShield Firefighter Equipment Ltd.
Name:Title: General Manager
Signature & Date: [ OFFICIAL STAMP – ANKARA METROPOLITAN FIRE DEPARTMENT – TÜRKÍYE / TURKEY ] ⬇️ Download as DOCX Edit online as DOCX