GoGPT GoSearch New DOC New XLS New PPT

OffiDocs favicon

Purchase Order Mason in United Arab Emirates Dubai –Free Word Template Download with AI

Masonry Services & Materials Procurement — United Arab Emirates Dubai

Purchase Order No.

PO-UAE-DXB-2025-04872

Date of Issue

14 June 2025

Required Delivery Date

01 August 2025

Project Location

United Arab Emirates Dubai

1. Purchasing Party (Buyer)
Company Name: Gulf Horizon Construction & Development LLC Trade License No.: 104872935
Address: Office 1204, Level 12, Marina Plaza, Dubai Marina, United Arab Emirates Dubai VAT No.: 100487293500003
Contact Person: Eng. Khalid Al Mansoori, Project Director Phone: +971 4 555 8821
Email: [email protected] Payment Terms: Net 30 days from invoice date
2. Supplier / Service Provider (Mason Contractor)
Company Name: Al Noor Mason & Stoneworks FZE Trade License No.: 209384716
Address: Warehouse 7, Industrial Area 3, Al Quoz, United Arab Emirates Dubai VAT No.: 100938471600003
Contact Person: Mr. Rajesh Kumar, Head Mason & Site Supervisor Phone: +971 50 774 3319
Email: [email protected] Specialization: Mason, stonemasonry, bricklaying, and decorative stone installation
3. Scope of Work & Itemized Purchase Order Details

This Purchase Order is issued by Gulf Horizon Construction & Development LLC to Al Noor Mason & Stoneworks FZE for the provision of skilled Mason labor, masonry materials, and related services for the construction of the Al Wasl Residential Tower, Phase II, located in the Jumeirah Village Circle district of United Arab Emirates Dubai. The Mason contractor shall be responsible for all masonry works including but not limited to load-bearing brickwork, decorative stone cladding, interior partition walls, and external facade finishing as per the approved architectural drawings and specifications.

Item No. Description Quantity Unit Unit Price (AED) Total (AED)
01 Skilled Mason labor – load-bearing brickwork (20cm solid clay bricks, Grade A) 4,200 m² 85.00 357,000.00
02 Decorative natural stone cladding – Indian sandstone, honed finish, external facade 1,850 m² 220.00 407,000.00
03 Interior partition masonry – 10cm hollow block, plastered both sides 3,600 m² 62.00 223,200.00
04 Masonry materials supply – cement (OPC 42.5), sand, aggregate, and bonding mortar 1 Lot 148,500.00 148,500.00
05 Specialist Mason craftsmanship – arched entryway and decorative lintels (hand-carved granite) 6 Units 12,500.00 75,000.00
06 Waterproofing and sealing of external masonry surfaces (polyurethane-based) 1,850 m² 38.00 70,300.00
07 Scaffolding, formwork, and site safety equipment for Mason operations 1 Lot 52,000.00 52,000.00
08 Quality inspection, curing, and final finishing by certified Mason team 1 Lot 35,000.00 35,000.00
Subtotal (AED) 1,368,000.00
VAT @ 5% (United Arab Emirates Dubai) 68,400.00
Grand Total (AED) 1,436,400.00
4. Terms and Conditions of This Purchase Order
  1. This Purchase Order is governed by the laws of the United Arab Emirates and shall be interpreted in accordance with the UAE Civil Code and applicable Dubai Municipality building regulations.
  2. The Mason contractor shall mobilize a minimum team of twelve (12) certified Mason workers, two (2) site supervisors, and one (1) quality assurance inspector to the project site in United Arab Emirates Dubai no later than 18 June 2025.
  3. All masonry materials specified in this Purchase Order must comply with Dubai Municipality standards and UAE.S GSO specifications. The Mason contractor shall provide material test certificates prior to installation.
  4. Payment shall be made in three (3) milestones: 30% upon commencement of Mason works, 40% upon completion of 60% of the masonry scope, and 30% upon final acceptance and handover.
  5. The Mason contractor shall maintain full workers' compensation insurance and comply with all occupational health and safety requirements mandated by the Dubai Municipality and the UAE Ministry of Human Resources.
  6. Any variation or change order to this Purchase Order must be approved in writing by both parties. Unauthorized deviations from the approved Mason work methodology will not be compensated.
  7. The Mason contractor shall provide a twelve (12) month defect liability period from the date of final acceptance, during which all masonry defects shall be rectified at no additional cost.
  8. All work shall be performed in accordance with the approved architectural and structural drawings. The Mason team shall attend weekly progress meetings coordinated by the project engineer in United Arab Emirates Dubai.
  9. Disputes arising from this Purchase Order shall be resolved through arbitration in Dubai under the rules of the Dubai International Arbitration Centre (DIAC).
  10. This Purchase Order becomes effective upon signature by both parties and remains valid until full completion and final payment.
5. Acceptance and Authorization

For and on behalf of the Buyer:

Gulf Horizon Construction & Development LLC

Eng. Khalid Al Mansoori

Project Director

Date: _______________

For and on behalf of the Mason Contractor:

Al Noor Mason & Stoneworks FZE

Mr. Rajesh Kumar

Head Mason & Site Supervisor

Date: _______________

This Purchase Order (PO-UAE-DXB-2025-04872) is a legally binding document issued for masonry services and materials procurement in United Arab Emirates Dubai. All references to "Mason" herein denote the qualified masonry trade professional and associated stoneworking services. This document is valid only when signed and stamped by both authorized representatives. © 2025 Gulf Horizon Construction & Development LLC. All rights reserved.

⬇️ Download as DOCX Edit online as DOCX

Create your own Word template with our GoGPT AI prompt:

GoGPT
×
Advertisement
❤️Shop, book, or buy here — no cost, helps keep services free.