GoGPT GoSearch New DOC New XLS New PPT

OffiDocs favicon

Purchase Order Mechanical Engineer in Australia Sydney –Free Word Template Download with AI

PO-2025-SYD-04872 Date of Issue: 14 June 2025 Valid Until: 14 July 2025 Professional Engineering Services — Mechanical Engineering Division Jurisdiction: Australia Sydney, New South Wales CONFIDENTIAL — Australia Sydney Commercial Document

Purchaser (Buyer)

Company: Harbour City Infrastructure Group Pty Ltd

ABN: 52 847 391 206

Address: Level 24, 1 Macquarie Place, Sydney NSW 2000, Australia

Contact: Mr. David Chen, Procurement Director

Email: [email protected]

Phone: +61 2 9200 4478

Supplier (Seller)

Company: Precision Mechanical Solutions (Aust) Pty Ltd

ABN: 74 291 856 334

Address: Unit 7, 42 Parramatta Road, Rozelle NSW 2039, Australia Sydney

Contact: Ms. Sarah Whitfield, Lead Mechanical Engineer

Email: [email protected]

Phone: +61 2 9361 2245

This Purchase Order is issued by Harbour City Infrastructure Group Pty Ltd (hereinafter referred to as the "Purchaser") to Precision Mechanical Solutions (Aust) Pty Ltd (hereinafter referred to as the "Supplier") for the engagement of a qualified Mechanical Engineer and associated professional services in connection with the design, analysis, and commissioning of mechanical systems for the Sydney Metro Extension Project, Stage 3. All work shall be performed in accordance with Australian Standards (AS/NZS), the Building Code of Australia, and all applicable regulations within Australia Sydney and the state of New South Wales.

Line Items — Scope of Mechanical Engineering Services
Ref Description of Service / Item Qty Unit Unit Price (AUD) Total (AUD) Delivery
01 Engagement of a Senior Mechanical Engineer (minimum 10 years' experience) for HVAC system design and thermal load analysis for the Sydney Metro Extension, Stage 3 — Chatswood to Epping corridor. Includes compliance with AS 1668.1 and AS 1668.2 ventilation standards applicable in Australia Sydney. 1 Contract $48,500.00 $48,500.00 15 Jul 2025
02 Structural and mechanical integrity assessment of existing pump stations along the Parramatta River corridor. The Mechanical Engineer shall produce a full condition report, finite element analysis (FEA) documentation, and remediation recommendations in compliance with AS 3770 and AS 4100. 3 Stations $12,800.00 $38,400.00 30 Jul 2025
03 Design and specification of mechanical ventilation and air conditioning (MVAC) plant for two new underground station platforms. The Mechanical Engineer shall deliver AutoCAD and Revit MEP drawings, equipment schedules, and performance guarantee documentation. 2 Platforms $34,200.00 $68,400.00 15 Aug 2025
04 Commissioning and site supervision by the appointed Mechanical Engineer during installation of mechanical services. Includes weekly progress reports, non-conformance logging, and final handover documentation for the Australia Sydney metropolitan rail authority. 12 Weeks $3,200.00 $38,400.00 Ongoing
05 Preparation of a comprehensive Mechanical Engineering Design Report (MEDR) for submission to the NSW Department of Planning, Housing and Infrastructure. The report shall address all mechanical systems, safety interlocks, and emergency shutdown procedures in line with Australian regulatory requirements. 1 Report $9,750.00 $9,750.00 30 Aug 2025
06 Supply of calibrated test and measurement instruments (vibration analyser, thermal imaging camera, anemometer set) for use by the Mechanical Engineer during commissioning. Instruments to be returned to Supplier upon project completion. 1 Set $6,300.00 $6,300.00 10 Jul 2025
Subtotal (AUD) $210,750.00
GST @ 10% (AUD) $21,075.00
Grand Total (AUD) $231,825.00
Terms and Conditions
  1. Governing Law: This Purchase Order shall be governed by and construed in accordance with the laws of the State of New South Wales, Australia. All disputes arising from this Purchase Order shall be resolved in the courts of Australia Sydney or by arbitration under the rules of the Australian Disputes Centre, Sydney.
  2. Qualifications of the Mechanical Engineer: The Supplier warrants that the Mechanical Engineer assigned to this Purchase Order holds a minimum of a Bachelor of Engineering (Mechanical) degree accredited by Engineers Australia, is a Chartered Professional Engineer (CPEng), and maintains a valid Professional Indemnity Insurance policy of no less than AUD $10,000,000 per occurrence. The Mechanical Engineer must be registered with the NSW Engineers Registration Board.
  3. Payment Terms: Payment shall be made within thirty (30) days of receipt of a valid tax invoice from the Supplier. Invoices shall be submitted to the Purchaser's accounts payable department at the Australia Sydney office. Late payments shall attract interest at the rate prescribed under the Australian Consumer Law.
  4. Delivery and Performance: All deliverables specified in this Purchase Order must be completed by the dates indicated in the line items table. The Mechanical Engineer shall provide a detailed project schedule within five (5) business days of acceptance of this Purchase Order. Failure to meet milestones may result in liquidated damages of AUD $1,500 per calendar day of delay, up to a maximum of 10% of the total contract value.
  5. Intellectual Property: All designs, drawings, calculations, reports, and documentation produced by the Mechanical Engineer under this Purchase Order shall become the sole property of the Purchaser upon full payment. The Supplier retains the right to use generic methodologies and standard engineering practices not specific to this project.
  6. Compliance and Standards: All mechanical engineering work shall comply with the Building Code of Australia (BCA), Australian Standards (AS/NZS), the Environmental Planning and Assessment Act 1979 (NSW), and all local council regulations applicable in Australia Sydney. The Mechanical Engineer shall ensure all designs meet the relevant AS 1668, AS 3770, AS 4100, AS 1288, and AS 1851 requirements.
  7. Health, Safety, and Environment (HSE): The Supplier and the Mechanical Engineer shall comply with the Work Health and Safety Act 2011 (NSW) and all site-specific HSE plans. A valid White Card and site-specific induction are mandatory before commencing any on-site work in Australia Sydney.
  8. Warranty: The Supplier provides a twelve (12) month warranty on all design deliverables from the date of final acceptance. Any design defects identified within this period shall be rectified by the Mechanical Engineer at no additional cost to the Purchaser.
  9. Termination: Either party may terminate this Purchase Order with thirty (30) days' written notice. In the event of termination, the Purchaser shall pay for all services rendered and materials procured up to the date of termination, as certified by the Mechanical Engineer's progress reports.
  10. Force Majeure: Neither party shall be liable for failure to perform obligations under this Purchase Order due to events beyond reasonable control, including but not limited to natural disasters affecting the Australia Sydney region, government-imposed restrictions, or acts of God, provided that the affected party notifies the other within forty-eight (48) hours.
Acceptance and Authorisation

By signing below, both parties acknowledge and agree to all terms, conditions, and specifications set forth in this Purchase Order. This document constitutes a binding agreement for the provision of Mechanical Engineering services in Australia Sydney as described herein.

For and on behalf of the Purchaser:

Harbour City Infrastructure Group Pty Ltd

Name: ______________________________

Title: Procurement Director

Signature: ______________________________

Date: ______________________________

For and on behalf of the Supplier:

Precision Mechanical Solutions (Aust) Pty Ltd

Name: ______________________________

Title: Lead Mechanical Engineer / Director

Signature: ______________________________

Date: ______________________________

This Purchase Order (PO-2025-SYD-04872) is a commercial document issued under the jurisdiction of Australia Sydney, New South Wales, Australia. All amounts are stated in Australian Dollars (AUD) inclusive of applicable Goods and Services Tax (GST) as per the A New Tax System (Goods and Services Tax) Act 1999. This document is the property of Harbour City Infrastructure Group Pty Ltd and shall not be reproduced or distributed without written consent. © 2025 Harbour City Infrastructure Group Pty Ltd. All rights reserved.

⬇️ Download as DOCX Edit online as DOCX

Create your own Word template with our GoGPT AI prompt:

GoGPT
×
Advertisement
❤️Shop, book, or buy here — no cost, helps keep services free.