Purchase Order Mechanical Engineer in Italy Naples –Free Word Template Download with AI
Official Procurement Document for Professional Engineering Services
PO No. IT-NAP-2025-04872
Date of Issue: 14 June 2025
Purchasing Entity (Buyer)
Company: Partenope Industrial Systems S.r.l.
Address: Via Toledo 187, 80132 Naples (NA), Italy
VAT Code: IT08472910634
Contact: Procurement Department
Email: [email protected]
Phone: +39 081 415 2230
Service Provider (Vendor)
Company: Meccanica Avanzata Consulting S.r.l.
Address: Corso Vittorio Emanuele 94, 80133 Naples (NA), Italy
VAT Code: IT09123450638
Contact: Dr. Marco Esposito, Lead Mechanical Engineer
Email: [email protected]
Phone: +39 081 554 8812
Description of ProcurementThis Purchase Order is issued by Partenope Industrial Systems S.r.l., headquartered in Italy Naples, to formally authorize and commission the professional services of a qualified Mechanical Engineer for the design, analysis, and technical oversight of industrial machinery systems. The Mechanical Engineer engaged under this Purchase Order shall provide comprehensive engineering consultancy, including but not limited to structural analysis, thermodynamic system design, fluid dynamics modelling, and compliance verification in accordance with Italian and European regulatory standards. All services rendered under this Purchase Order shall be executed at the project site located in Italy Naples, specifically at the Partenope manufacturing facility on Via Toledo, and at the vendor's engineering office in Italy Naples as required for collaborative design sessions.
Line Items and Scope of Work| Item No. | Description of Service | Quantity | Unit | Unit Price (EUR) | Total (EUR) |
|---|---|---|---|---|---|
| 01 | Mechanical Engineer – Senior Design Consultation: Full-cycle design of a high-pressure hydraulic assembly for the Naples production line, including CAD modelling, stress analysis, and material selection. Services to be delivered at the Italy Naples project site. | 1 | Project | 12,500.00 | 12,500.00 |
| 02 | Mechanical Engineer – Thermal and Fluid Systems Analysis: Comprehensive thermodynamic evaluation of the cooling infrastructure, including CFD simulation reports and heat exchanger sizing. Conducted by the assigned Mechanical Engineer at the Italy Naples facility. | 1 | Project | 8,200.00 | 8,200.00 |
| 03 | Mechanical Engineer – Regulatory Compliance and Certification Support: Preparation of technical documentation for CE marking, conformity assessment under EU Machinery Directive 2006/42/EC, and alignment with Italian national standards (UNI). The Mechanical Engineer shall coordinate with the local authority in Italy Naples. | 1 | Project | 5,400.00 | 5,400.00 |
| 04 | Mechanical Engineer – On-Site Supervision and Commissioning: Physical presence of the Mechanical Engineer at the Italy Naples manufacturing plant for a minimum of 40 working hours to oversee installation, alignment, and initial commissioning of the engineered systems. | 40 | Hours | 95.00 | 3,800.00 |
| 05 | Mechanical Engineer – Post-Commissioning Technical Support: A 90-day warranty period during which the Mechanical Engineer shall provide remote and on-site troubleshooting, performance verification, and corrective design recommendations at the Italy Naples location. | 1 | Period | 4,100.00 | 4,100.00 |
| Subtotal (EUR) | 34,000.00 | ||||
| VAT (22% – Italian Standard Rate) | 7,480.00 | ||||
| TOTAL AMOUNT DUE (EUR) | 41,480.00 | ||||
- 1. Scope and Deliverables: The Mechanical Engineer shall deliver all engineering artefacts, including but not limited to CAD files (STEP, IGES, DWG formats), calculation reports, simulation outputs, and compliance dossiers, in accordance with the specifications outlined in this Purchase Order. All deliverables are subject to acceptance by the Purchasing Entity's technical directorate in Italy Naples.
- 2. Timeline and Milestones: The Mechanical Engineer shall commence work within five (5) business days of the formal acceptance of this Purchase Order. The complete project, including all phases listed in the line items above, shall be completed no later than 30 September 2025. Interim milestone reviews shall be conducted bi-weekly at the Italy Naples project site.
- 3. Payment Terms: Payment shall be made in three instalments: 30% upon signing of this Purchase Order, 40% upon completion of the design and analysis phases (Items 01 and 02), and 30% upon final acceptance of all deliverables and completion of the post-commissioning support period. Payment shall be executed via bank transfer to the vendor's account in Italy Naples. Invoices must reference this Purchase Order number (IT-NAP-2025-04872).
- 4. Professional Standards and Liability: The Mechanical Engineer shall perform all services in strict compliance with the Italian Code of Professional Conduct for Engineers (Codice Deontologico degli Ingegneri), the EU Machinery Directive, and all applicable national and regional regulations governing engineering practice in Italy Naples. The Mechanical Engineer shall maintain professional indemnity insurance with a minimum coverage of EUR 1,000,000 for the duration of this Purchase Order.
- 5. Intellectual Property: All designs, calculations, models, and documentation produced by the Mechanical Engineer under this Purchase Order shall become the exclusive property of Partenope Industrial Systems S.r.l. upon full payment. The Mechanical Engineer retains the right to reference the project in a general, non-identifiable capacity for portfolio purposes, subject to prior written consent from the Purchasing Entity.
- 6. Confidentiality: Both parties agree to maintain strict confidentiality regarding all technical data, proprietary processes, and commercial information exchanged in the course of executing this Purchase Order. This obligation shall survive the termination of the contract for a period of five (5) years.
- 7. Termination: Either party may terminate this Purchase Order with thirty (30) days' written notice. In the event of termination, the Mechanical Engineer shall be compensated for all work completed and documented up to the date of termination, as verified by the Purchasing Entity in Italy Naples.
- 8. Governing Law and Jurisdiction: This Purchase Order shall be governed by and construed in accordance with the laws of the Italian Republic. Any disputes arising from or in connection with this Purchase Order shall be subject to the exclusive jurisdiction of the competent courts of Naples (Napoli), Italy Naples.
- 9. Force Majeure: Neither party shall be liable for failure to perform obligations under this Purchase Order due to events beyond reasonable control, including but not limited to natural disasters, government actions, or public health emergencies affecting the Italy Naples region.
By signing below, both parties acknowledge and agree to all terms, conditions, and specifications set forth in this Purchase Order for the engagement of the Mechanical Engineer for the described services in Italy Naples. This document constitutes a binding agreement upon execution by both authorized representatives.
For and on behalf of the Purchasing Entity:
Partenope Industrial Systems S.r.l.
Name: ___________________________
Title: Director of Procurement
Signature: ___________________________
Date: ___________________________
For and on behalf of the Service Provider:
Meccanica Avanzata Consulting S.r.l.
Name: Dr. Marco Esposito
Title: Lead Mechanical Engineer / Managing Director
Signature: ___________________________
Date: ___________________________
⬇️ Download as DOCX Edit online as DOCXCreate your own Word template with our GoGPT AI prompt:
GoGPT