GoGPT GoSearch New DOC New XLS New PPT

OffiDocs favicon

Purchase Order Welder in France Marseille –Free Word Template Download with AI

Industrial Welder Equipment Procurement – France Marseille Operations

Document Reference: PO-FR-MRS-2025-00472

Purchase Order Number: PO-FR-MRS-2025-00472 Date of Issue: June 12, 2025 Required Delivery Date: July 15, 2025 1. Purchasing Entity
Company Name: Provence Industrial Fabrication SARL
Address: 142 Boulevard de la Canebière, 13001 France Marseille, Bouches-du-Rhône
Contact Person: M. Laurent Dubois, Procurement Director
Email: [email protected]
Phone: +33 4 91 55 22 87
2. Supplier Information
Supplier Name: European Welding Solutions GmbH
Address: Industriestraße 45, 80331 Munich, Germany
Contact Person: Dr. Anna Keller, Sales Manager – France Marseille Region
Email: [email protected]
Phone: +49 89 4421 7700
3. Itemized Purchase Order Details

This Purchase Order is issued for the procurement of professional-grade Welder equipment and associated consumables, specifically designated for deployment at our primary fabrication facility located in France Marseille. The Welder units specified below must comply with all applicable French and European safety standards (CE marking, NF EN 60974) prior to delivery at the France Marseille site.

Item # Description Qty Unit Price (EUR) Total (EUR)
1 Industrial MIG/MAG Welder, 400A, 3-Phase, IP23 Rated – Primary unit for France Marseille fabrication line 4 8,750.00 35,000.00
2 TIG Welder, 250A, Pulse Mode, for precision stainless steel work in France Marseille 3 6,200.00 18,600.00
3 Welding Torch Assemblies (MIG, 1.6mm wire compatible) – spare set for France Marseille operations 12 340.00 4,080.00
4 Welding Wire Spools, ER70S-6, 1.0mm, 15kg – consumable stock for France Marseille 60 42.50 2,550.00
5 Welding Helmets, Auto-Darkening, DIN 9-13, EN 379 certified – for France Marseille workforce 15 185.00 2,775.00
6 Welding Ground Cables, 50m, 70mm² – for France Marseille site installation 8 210.00 1,680.00
7 Welding Positioner, 2.5-ton capacity, for heavy structural work in France Marseille 1 24,500.00 24,500.00
8 Welding Fume Extraction System, 3-arm, 1200 m³/h – France Marseille environmental compliance 2 5,800.00 11,600.00
SUBTOTAL 100,785.00
VAT (20% – France Marseille jurisdiction) 20,157.00
DELIVERY & INSTALLATION (France Marseille site) 3,450.00
GRAND TOTAL (EUR) 124,392.00
4. Delivery and Installation Specifications

All items listed in this Purchase Order shall be delivered to the Provence Industrial Fabrication SARL facility at 142 Boulevard de la Canebière, 13001 France Marseille. The supplier is responsible for the safe transport, customs clearance (if applicable within the EU), and on-site installation of each Welder unit at the France Marseille location. Installation must include electrical connection verification, calibration, and a full operational test witnessed by our France Marseille site engineering team. The Welder equipment must be delivered in its original packaging with all documentation, including French-language user manuals, CE conformity certificates, and warranty registration forms.

5. Payment Terms
  • Payment Schedule: 40% advance payment upon acceptance of this Purchase Order; 50% upon confirmed delivery of the Welder units to the France Marseille site; 10% final payment upon successful commissioning and sign-off.
  • Payment Method: Bank transfer (SEPA) to the supplier's designated account. Reference number PO-FR-MRS-2025-00472 must be included on all remittances.
  • Due Dates: Advance payment due within 10 business days of Purchase Order acceptance. Balance payments due within 30 days of the respective milestone.
  • Currency: All amounts are denominated in Euros (EUR). No currency fluctuation adjustments shall apply.
6. Terms and Conditions
  • This Purchase Order is governed by the laws of the French Republic. Any disputes arising from the procurement of the Welder equipment for France Marseille operations shall be subject to the exclusive jurisdiction of the Commercial Court of Marseille.
  • The Welder units are warranted for a minimum of 24 months from the date of installation at the France Marseille facility. Warranty coverage includes all mechanical, electrical, and electronic components.
  • The supplier guarantees that all Welder equipment complies with the EU Machinery Directive 2006/42/EC, the Low Voltage Directive 2014/35/EU, and all relevant French occupational safety regulations applicable to the France Marseille industrial zone.
  • Delivery delays exceeding 14 calendar days beyond the required delivery date of July 15, 2025, shall incur a penalty of 0.5% of the total Purchase Order value per day of delay, up to a maximum of 10%.
  • The supplier shall provide on-site training for up to 10 operators at the France Marseille facility, covering safe operation, maintenance procedures, and troubleshooting of each Welder model specified herein.
  • Force majeure events, including but not limited to port disruptions at the Port of Marseille-Fos, shall be communicated in writing within 48 hours of occurrence.
  • This Purchase Order becomes binding upon written acceptance by both parties. No modifications to the scope, pricing, or delivery schedule for the Welder procurement in France Marseille shall be valid unless documented in a written amendment signed by both parties.
7. Acceptance and Authorization

By signing below, both parties acknowledge and agree to all terms, conditions, and specifications outlined in this Purchase Order for the procurement of Welder equipment destined for the France Marseille fabrication facility. This document constitutes the complete and final agreement between the parties regarding this specific procurement.

For Provence Industrial Fabrication SARL
M. Laurent Dubois – Procurement Director
Date: _______________
For European Welding Solutions GmbH
Dr. Anna Keller – Sales Manager
Date: _______________

This Purchase Order (PO-FR-MRS-2025-00472) is a controlled document. Unauthorized reproduction or distribution is prohibited. All references to France Marseille pertain to the designated operational site. The Welder equipment specified herein is subject to final technical verification prior to shipment. For inquiries, contact the Procurement Department at Provence Industrial Fabrication SARL, France Marseille.

⬇️ Download as DOCX Edit online as DOCX

Create your own Word template with our GoGPT AI prompt:

GoGPT
×
Advertisement
❤️Shop, book, or buy here — no cost, helps keep services free.