Quotation Estimate Architect in Ethiopia Addis Ababa –Free Word Template Download with AI
Professional Architectural Design & Consulting Services
Quotation Reference No: QTE-ADD-2025-0472 | Date: 15 June 2025
Prepared By (Architect)
Addis Ababa Architectural Design Studio
Led by: Ar. Selamawit Bekele, RIBA Chartered Architect
Bole Road, Near Friendship Hotel
Addis Ababa, Ethiopia
Tel: +251-11-662-3450
Email: [email protected]
License No: EAA-2019-00847
Prepared For (Client)
Mr. Dawit Tadesse
Tadesse Holdings PLC
Kazanchis Avenue, Building 12, Floor 4
Addis Ababa, Ethiopia
Tel: +251-911-456-789
Email: [email protected]
Project OverviewThis Quotation Estimate is issued by Addis Ababa Architectural Design Studio, a licensed Architect firm operating in the heart of Addis Ababa, Ethiopia, to provide a comprehensive cost breakdown for the design, planning, and architectural consultancy services required for the proposed 12-Storey Mixed-Use Commercial and Residential Building located on the Bole Sub-City, Addis Ababa. The Architect team will oversee all phases from conceptual design through to construction documentation, ensuring full compliance with the Ethiopian Building Code, the Addis Ababa City Administration Building Permit Regulations, and the Federal Ministry of Urban and Infrastructure Development standards.
Scope of Architectural ServicesThe Architect firm shall deliver the following professional services as part of this Quotation Estimate engagement in Addis Ababa, Ethiopia:
| No. | Service Description | Deliverables | Duration | Cost (ETB) |
|---|---|---|---|---|
| 1 | Site Survey & Feasibility Study in Addis Ababa | Site report, topographic survey, geotechnical assessment, zoning compliance review per Addis Ababa City Planning Bureau | 3 Weeks | 185,000 |
| 2 | Conceptual Design & Architectural Schematics | 3D massing studies, floor plans, elevations, site plans, material palette, sustainability strategy aligned with Ethiopian green building guidelines | 6 Weeks | 420,000 |
| 3 | Detailed Architectural Design & Construction Drawings | Full set of construction drawings (structural, MEP coordination, architectural details), BIM model (Revit), quantity take-off for tender documentation | 10 Weeks | 780,000 |
| 4 | Building Permit Application & Regulatory Approval (Addis Ababa) | Preparation and submission of all documents to Addis Ababa City Building Permit Office, coordination with Ethiopian Environmental Protection Authority, fire safety compliance | 4 Weeks | 150,000 |
| 5 | Tender Support & Contractor Coordination | Bill of Quantities preparation, clarification responses, contract administration support for the construction phase in Addis Ababa | 5 Weeks | 220,000 |
| 6 | Construction Phase Architectural Supervision | Weekly site inspections, design compliance verification, variation order assessment, progress reporting to the client throughout the construction period in Addis Ababa, Ethiopia | 18 Months | 1,250,000 |
| 7 | Interior Design & Landscape Architecture | Interior fit-out drawings for retail and residential units, landscape plan for ground-level plaza and rooftop garden using indigenous Ethiopian plant species | 8 Weeks | 340,000 |
| 8 | As-Built Documentation & Handover | Final as-built drawings, O&M manuals, warranty documentation, and project close-out report | 4 Weeks | 95,000 |
| TOTAL QUOTATION ESTIMATE AMOUNT | ETB 3,440,000 | |||
| VAT (15% - Ethiopian Tax Authority) | ETB 516,000 | |||
| GRAND TOTAL (Incl. VAT) | ETB 3,956,000 | |||
| Milestone | Percentage | Amount (ETB) |
|---|---|---|
| Upon signing of this Quotation Estimate and service agreement | 20% | 791,200 |
| Upon approval of Conceptual Design | 15% | 593,400 |
| Upon submission of Construction Drawings | 25% | 989,000 |
| Upon receipt of Building Permit from Addis Ababa | 15% | 593,400 |
| Monthly during Construction Supervision (18 installments) | 20% | 791,200 |
| Upon Project Handover & As-Built Delivery | 5% | 197,800 |
- This Quotation Estimate is valid for a period of thirty (30) calendar days from the date of issue. After this period, the Architect firm reserves the right to revise pricing due to market fluctuations in Addis Ababa, Ethiopia.
- All costs are quoted in Ethiopian Birr (ETB) and are subject to the prevailing VAT rate as determined by the Ethiopian Revenue and Customs Authority. Any change in tax legislation during the project duration shall be reflected in a supplementary Quotation Estimate.
- The Architect firm shall maintain professional indemnity insurance with a minimum coverage of ETB 10,000,000, as required by the Ethiopian Architects and Engineers Registration Board.
- All intellectual property rights in the architectural drawings, BIM models, and design documents produced under this Quotation Estimate shall vest in the client upon full payment of the Grand Total amount.
- The Architect shall comply with all applicable Ethiopian laws, including the Ethiopian Civil Code, the Urban Planning and Construction Proclamation (No. 920/2015), and Addis Ababa City Administration bylaws.
- Any changes to the scope of work beyond the parameters defined in this Quotation Estimate shall be subject to a written variation order signed by both parties, with an adjusted cost estimate provided by the Architect within five (5) working days.
- Disputes arising from this Quotation Estimate shall be resolved through mediation in Addis Ababa, Ethiopia, in accordance with the Ethiopian Arbitration and Conciliation Proclamation (No. 1221/2020).
- The Architect firm shall not be liable for delays caused by government permit processing times at the Addis Ababa City Building Permit Office or force majeure events.
For and on behalf of the Architect Firm:
Ar. Selamawit BekelePrincipal Architect, Addis Ababa Architectural Design Studio
Date: _______________
Accepted by the Client:
Mr. Dawit TadesseManaging Director, Tadesse Holdings PLC
Date: _______________ ⬇️ Download as DOCX Edit online as DOCX
Create your own Word template with our GoGPT AI prompt:
GoGPT