GoGPT GoSearch New DOC New XLS New PPT

OffiDocs favicon

Quotation Estimate Carpenter in Bangladesh Dhaka –Free Word Template Download with AI

Dhaka Craft & Woodworks Ltd.

House 42, Road 11, Banani, Bangladesh Dhaka 1213

Phone: +880-2-8812345 | Email: [email protected]

VAT Registration No.: 001234567-0201

Quotation No.: QTE-2025-04782 Date of Issue: 15 June 2025 Valid Until: 15 July 2025 Prepared For: Mr. Rafiqul Islam 1. Client Information
Client Name: Mr. Rafiqul Islam
Address: Flat 7B, Gulshan Avenue, Block C, Bangladesh Dhaka 1212
Contact Number: +880-1711-234567
Project Location: Residential Apartment, Gulshan, Bangladesh Dhaka
2. Scope of Work – Carpenter Services

This Quotation Estimate is prepared by Dhaka Craft & Woodworks Ltd. to provide comprehensive Carpenter services for the residential renovation project located in Bangladesh Dhaka. Our team of experienced Carpenter professionals will execute all woodwork, furniture fabrication, and structural timber tasks as detailed below. The scope encompasses custom-built wardrobes, kitchen cabinetry, wooden flooring installation, door and window frame repairs, and decorative paneling throughout the three-bedroom apartment.

3. Itemized Cost Breakdown
Sl. No. Description of Carpenter Work Unit Qty Unit Rate (BDT) Amount (BDT)
1 Custom-built 6-door wardrobe with teak wood (master bedroom) Set 1 85,000 85,000
2 Custom-built 4-door wardrobe (second bedroom) Set 1 62,000 62,000
3 Kitchen cabinetry – base units and wall units (solid sheesham wood) Set 1 145,000 145,000
4 Engineered teak wood flooring – living room and dining area (approx. 450 sq ft) Sq Ft 450 320 144,000
5 Repair and refinishing of 4 main entrance and interior doors Door 4 8,500 34,000
6 Wooden window frames – replacement of 6 damaged frames (sal wood) Frame 6 12,000 72,000
7 Decorative wooden paneling – TV unit and hallway accent wall Sq Ft 120 450 54,000
8 Study room desk with built-in shelving unit (mahogany finish) Set 1 48,000 48,000
9 Bathroom vanity unit with wooden countertop (water-resistant treatment) Set 2 28,000 56,000
10 General carpentry labor, site supervision, and finishing (paint, varnish, sanding) Lot 1 35,000 35,000
Subtotal: 735,000
VAT (5% as applicable in Bangladesh Dhaka): 36,750
Grand Total (BDT): 771,750
4. Project Timeline

The Carpenter team assigned to this project in Bangladesh Dhaka estimates a total duration of 28 working days from the date of material approval. The schedule includes 5 days for material procurement and site preparation, 18 days for fabrication and installation, and 5 days for finishing, quality inspection, and final handover. All work will be conducted between 8:00 AM and 6:00 PM to minimize disruption to the client's household.

5. Terms and Conditions
  • This Quotation Estimate is valid for 30 calendar days from the date of issue. Prices are subject to revision after the validity period due to fluctuating timber costs in the Bangladesh Dhaka market.
  • A 40% advance payment is required to confirm the order and initiate material procurement. The remaining 60% shall be payable upon completion and client sign-off.
  • All wood materials sourced for this Carpenter project will be certified and free from termites, in compliance with Bangladesh Forest Department regulations.
  • The Carpenter team will provide a 12-month warranty on all structural woodwork and 6-month warranty on finishing work (paint, varnish, hardware).
  • Any additional work or design modifications requested after the initial scope approval will be quoted separately and require written consent from the client.
  • The contractor is responsible for all safety measures on-site in accordance with the Bangladesh Labour Act 2006 and local municipal by-laws of Bangladesh Dhaka.
  • Disputes arising from this Quotation Estimate shall be resolved through amicable negotiation, failing which they shall be subject to the jurisdiction of the courts in Bangladesh Dhaka.
6. Payment Schedule
Milestone Percentage Amount (BDT) Due Date
Advance (upon order confirmation) 40% 308,700 Within 3 days of approval
Mid-project (after flooring and cabinetry installation) 30% 231,525 Day 15 of project
Final (upon completion and handover) 30% 231,525 Day 28 of project
7. Acceptance and Authorization

By signing below, the client acknowledges and accepts this Quotation Estimate for Carpenter services in Bangladesh Dhaka as presented by Dhaka Craft & Woodworks Ltd. The client confirms that all specifications, timelines, and financial terms have been reviewed and agreed upon.

For Dhaka Craft & Woodworks Ltd.
Authorized Signatory
Name: Md. Abdul Karim
Designation: Project Manager
Client Acceptance
Name: Mr. Rafiqul Islam
Signature & Date: _______________
Note: This Quotation Estimate is a non-binding document until formally accepted in writing by both parties. All rates are quoted in Bangladeshi Taka (BDT) and are exclusive of any municipal taxes levied by the Dhaka North City Corporation or Dhaka South City Corporation. The Carpenter services described herein are specific to the project location in Bangladesh Dhaka and cannot be transferred to other addresses without a revised quotation.
⬇️ Download as DOCX Edit online as DOCX

Create your own Word template with our GoGPT AI prompt:

GoGPT
×
Advertisement
❤️Shop, book, or buy here — no cost, helps keep services free.